HomeMy WebLinkAbout20201511 Ver 1_B5642_Permit Package Wetland_20210127_20210421(Version 2.08; Released April 2018)
45597.1.1 TIP No.:B-5642 County(ies):Brunswick Page 1 of 1
TIP Number:Date:
Phone:Phone:
Email:Email:
County(ies):
CAMA County?
Yes
Design/Future:Year:2040 Existing:Year:
Aquatic T&E Species?Comments:
Yes No
No
N/A
Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)
ac.
2 - 12ft lanes with variable width grass shoulder
3100
jdalton@sungatedesign.com
Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?
NRTR Stream ID:
Annual Avg Daily Traffic (veh/hr/day):
Existing Site
Project Length (lin. miles or feet):
ac.
Surface Water Body (1):
Class CNCDWR Surface Water Classification for Water Body
N/ABuffer Rules in Effect:
None
2,100
2 - 12ft lanes with 8ft shoulder (4ft Paved)
Waterbody Information
2020
NCDWR Stream Index No.:
45597.1.1
Impairments:
Other Stream Classification:
Primary Classification:
Project Built-Upon Area (ac.)
B-5642 is a bridge replacement project that involves removing existing Brunswick County bridge #65 on NC 87 over Batarora Branch, with a 1@70', 24" cored slab bridge with
4.0' end bent caps. No deck drains will be used on the proposed structure, reducing adverse stream impacts associated with direct roadway runoff. Additional measures
implemented to reduce impacts to stream and surrounding wetlands inlcude, maintaining existing drainage patterns, using 3:1 fill slopes and discharging stormwater as far away
from the stream and wetlands as practicable. Further, rip rap is used at drainage outlets to dissipate energy and reduce erosion. In areas where rock plating is specified, 2:1 fill
slopes have been used to reduce impacts.
905 Jones Franklin Rd
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
Project Type:
Structures Management Unit Address:
General Project Information
B-5642
WBS Element:
Bridge ReplacementWBS Element:
Sungate Design GroupNCDOT Contact:
919-707-6531
Raleigh, NC 27606
Contractor / Designer:
919-859-2243
kalford@ncdot.gov
Raleigh, NC 27699
Address:
4/27/2020
BrunswickN/A
Kristy Alford, PE
1581 Mail Service Center
River Basin(s):
City/Town:
2.3
Typical Cross Section Description:
Surrounding Land Use:
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
Yes
Rural Residential, Agricultural
Batarora Branch 18-66-11
1.1
0.161 mi
Project Description
Proposed Project
Cape Fear
None
Supplemental Classification: Swamp Waters (Sw)
Wetlands within Project Limits?
Submitted 4/21/2021
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 1
SITE 2
SITE 3
SHEET 1 OF 6
PERMIT DRAWING
DATE: 1-14-2021
D
T
V
=
=
=
=
=
=MPH
ADT
ADT
FUNC CLASS =
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/990
00
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$CONTRACT:N.T.S.
PROJECT ENGINEER
Prepared in the Office of:
NC COA No. F-1255
Raleigh, NC 27612-3228
Suite 400
5400 Glenwood Avenue
CDM Smith Inc.
=
=
=ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NAVICINITY MAP
4
2040
GRADING, DRAINAGE, PAVING AND STRUCTURE
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
2018 STANDARD SPECIFICATIONS
NCDOT CONTACT
DETOUR ROUTE
-L-
N/A
60
THIS PROJECT IS NOT WITHIN A MUNICIPAL BOUNDARY.
P.E.
BRUNSWICK COUNTY
REPLACE BRIDGE NO. 65 OVER BATARORA BRANCH
(MACO ROAD)
NC 87
B-5642
B-5642 75% PLANS
2,150 VPD
3,100 VPD
9%
7%
55%
=2%TTST =5%DUALS
REGIONAL TIER
50 1002550
PLANS
50 1002550
10 20510
ON NC 87 (MACO ROAD)TIP PROJECT:-L- POT STA. 14+00.00
BEGIN TIP PROJECT B-5642
-L- POT STA. 22+50.00
END TIP PROJECT B-5642
45597.1.1
K
JULY 20, 20210.161 MILES
0.147 MILESLENGTH ROADWAY TIP PROJECT B-5642
LENGTH BRIDGE TIP PROJECT B-5642
TOTAL LENGTH TIP PROJECT B-5642MAJOR COLLECTOR
2021
TO US 17 BRANCHBATARORA US 74
TO PALMATIER LNKRISTY ALFORD, PE
-L- POC STA. 24+10.00
END CONSTRUCTION
-L- POT STA. 13+00.00
BEGIN CONSTRUCTION
45597.2.1 N/A R/W & UTIL.
TO THE LIMITS ESTABLISHED BY MODIFIED METHOD III.
CLEARING ON THIS PROJECT SHALL BE PERFORMED
0.014 MILES
ADAM M. CONRAD, PE
MONIQUE N. GYANT, EI
-L- POT STA. 17+93.88
BEGIN BRIDGE
-L- POT STA. 18+66.13
END BRIDGE
NOVEMBER 3, 2020
See Sheet 1B For Conventional Symbols
See Sheet 1A For Index of Sheets
SawOld
Maco Rd.Ma
l
moLoo
p
Malmo
Loop Rd.SandyRidgeWayTownRd.
Town Creek
Rd.OldTown
Creek
Rd.
Green
Loop
Rd.
Industrial
MercantileDr.M ercantileDr.Trade St.
Price Rd.Reed Rd.IndustryDr.Wood Treatment Rd.Fletcher
Rd.Lanval
eRd.
Dale St.BluffDr.ChurchRd.Park
woo
d Dr.
National Ave.DavidsonAve.
King
Rd.LanvaleRd.Buckeye
Rd.Wolfridge
Rd.Railroad Rd.Goodman
Rd.
Bridal Way
Dr.
Sloan
Rd.
GoodlandRd.Clarend
o
n
Rd.
Pad
din
gto
n Ave.
Old
Fayettville
Rd.
Old
Lanvale
Rd.
Sno
wfield
M intzDr.FASPopularSt.Railroad Rd.
He
wlett
Burton
Rd.
Colon
Mintz
Rd.Rd.LanvaleTown
Creek
TreeCt.SunnybrookWayLexin
gto
n Ave.
Echo Dr.
1712
1714
1723
1722
1418
1452
1419
1494 1713
1439
1437
1439
1417
1416
1417
1726
1413
1735
1414
1415
1734
1733
1732
1438
1438
1568
1552
1701
1553
1425
1731
1472
1479
1438
1466
1440
1438
1437
1724
1488
1488
1489
1491
1492
1725
1488
1487
1437
1446
1461
1522
1418
1700
1722
1736
1414
1607
1608
1413
1413
1415
1700
1723
.16.61
.46
.10
.24
.22
1.17
.41.59.11
.22.06
.20
2.64
1.84
.07
.53
.54
.75
.23
.691.17.26
.02
.16.59.34.24
.24.09.22
.10
.20.21.46.61
.33
.12
.52
.07
.27
.04.07.07.04.08.07.08
.2
8
.2
5
.3
3
.2
7
.2
1
.26.07.07.07
.54
1.40
.49
.28
.28.24.09
.28.26.20
1.582.17
2.34 1.581.61
.681.36
.29.36
.0
4
.16.19.20.09
.29
2.25
.19
1.1
3
.22 .27.43
.21.05.22.2
6
.34
.57
1.59.782.89 .551.291.08.27.55
.711.14
.30.3
61.03
2.17.15.15HollyHillsDr.BlakeSturgeon
Dr.CleatwoodRd.HevenerSueCircleSueCircleLyn-Marie
Dr.
Wa yneSt.LloydSt.Westover Dr.RampartSt.Moore Rd.
Short St.Green Acres Dr.
Skipper St.1.2.3.
Royal
St.Bourbon
St.
Rampart St.
OrleansSt.Highland HillsRachaelWynd
Carol-Lynn
Dr.Robin Ln.Sandy CreekDriveGraingerCircle
Grainger
CircleHickory DriveJoeBaldwinDr.DogwoodCircle
DogwoodCircle1.
2.3.LewisRd.Webster Ct.Cir.HoodSturgeon
Jackeys
Pasture Pond Branch
W atersHood
ChinnisBra nchCherry
Tree
Alli
gat
or
Bra
nchCowpenB ra nc hCr
eekTurkey
Br
anchHood
Creek
Bishop
Branch MorganBranchBranchBr
anchBenton
Cemetery
Nelson
Cemetery
Chinnis
Cemetery
Williams
Cemetery
Bethel
Church
Faith
Church
Grove
Church
Damascus Rd.FASF
AS
MacoRd.Maco
Rd.MacoRd.
Maco
Sandy Creek
Pop. 290
Malmo
Lanvale
Bishop
Batarora
Spring Hill
Eliah
Phoenix
FAP
FAP
FAP
FAP
FAPFAP
Jackson
Hwy.
Andrew
Jackson
Hwy.
Andrew
Jackson
Ocean
OceanHwy.
SWAMP
GREEN
LITTLE
Flat Bay
Farmers
Chapel
Hope
Church
New
St. James
Church
Hope
Church
New
Bay
Rabontown
Henrytown
Juniper
Swamp BeaverdamBeaverdam
US DOD
SUNNY POINT
TERMINAL
MILITARY OCEAN
Ch.
Shiloh
Cem.
Skipper
Br.RAI
LROADCSXCSX
TRANSPORTATIONCSXCr..87.07
.07
Single
High School
Leland
Middle School
Leland
1416Ho
o
d
Cr
ee
k.05
.31
Wolfri
dgeRd.1412
1414
Rd.
Goo
dman
1437
1429
.35
.6
9
1752 .62.25.592.
2
0
87
87
76
74
17
87
87
40
17
76
74
76
74
PROJECT
BEGIN
PROJECT
END
NA 2011
NAD 83/
Submitted 4/21/2021
WETLAND
DENOTES FILL INFF
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 1
SITE 2
SITE 3
SITE 3
F
WETLAND WA
WETLAND WA
MECH
DATE: 1-14-2021
0 50'25'50'
SCALE: 1"=100'
100'
SHEET 2 OF 6
PERMIT DRAWING
REVISIONS 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
NC COA No. F-1255
Raleigh, NC 27612-3228
Suite 400
5400 Glenwood Avenue
CDM Smith Inc.
4
NAD
83
/NA
2011
20
30
40
10
0
50
60
70
B-5642
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
BRIDGE APPROACH SLAB
12 13 14 15 16 17 18 19 20 21 22 23 24 25
80 80
70
60
50
40
30
20
10
0
915 JONES FRANKLIN ROAD
RALEIGH, NORTH CAROLINA 27606
NC COA No. C-0890
SUNGATE DESIGN GROUP, P.A.BRANCHBATARORA 15" RCP
15" RCP
WELL
HTR 1SFD
18" RCP
15" CMPGRAVEL CONC
18" RCP
18" CMP
GATE
PALMATIER LNNC 87 (MACO RD) 23' BSTNC 87 (MACO RD) 23' BST
WOODS
WOODS WOODS WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
ALENE PELLOM HEIRS
LEO KNOX, ET UX
DAISY MAE OLIVER
DAISY MAE OLIVER
SALAS ANGELICA
JEANNE BETH BAKER
BILLY RAY PALMATIER, ET UX
BILLY RAY PALMATIER, ET UX
JAMES ALSTON, JR, ET UXPB 62 PG 2645' PRIVATE EASEMENTPB 62 PG 2645' PRIVATE EASEMENTPB 35 PG 5760' PRI
VATE EASEMENT100.00'100.00'EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
DECK
S
WOODS
NC 87 (MACO RD) 23' BST
30.00'50.00'RW3RW4RW5Duke Energy Progress
Charter Communication
Charter Communication
AT&T Corp.(2)
Progress
Duke Energy
TT48" WOOD
SEPTIC TANK
POSSIBLE
SOIL
CONC
65
BRIDGE 80.00'1520PC Sta. 23+71.72 25PT Sta. 25+87.87
1
2
3
2EST 5 SY GF
EST 1 TON
CL B RIPRAP
2GI
2GI
EST 5 SY GF
EST 1 TON
CL B RIPRAP
REMOVE
RETAIN
REMOVE
18"
18"
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
3:1D
FROM STA. 14+00 TO STA. 16+90 -L- RT
FROM STA. 15+00 TO STA. 17+20 -L- LT
Min. D=1.0 Ft.
DETAIL 1
Ground
Natural
Flatter3:1 or
Slope
Fill
SEE DETAIL 1
SPEC. LAT. V-DITCH
SEE DETAIL 1
SPEC. LAT. V-DITCH
EST 10 SY GF
EST 3 TONS
CLASS B RIP RAP
DAYLIGHT DITCH
STA. 18+92 -L- LT & RT
END APPROACH SLAB TO
SHOULDER BERM GUTTER
15" W/ELBOWS
ELBOWS
15" W/
(STRUCTURE PAY ITEM)
TO SHOULDER POINT
CLASS II RIP RAP
(ROADWAY PAY ITEM)
TO SHOULDER POINT
ROCK PLATING
(ROADWAY PAY ITEM)
TO SHOULDER POINT
ROCK PLATING
(ROADWAY PAY ITEM)
TO SHOULDER POINT
ROCK PLATING
EST 10 SY GF
EST 3 TONS
CLASS B RIP RAP
DAYLIGHT DITCH
PROPOSED GRADE
EXISTING GROUND
EL. 43.65'
-L- STA. 14+00.00
BEGIN GRADE
EL. 38.80'
-L- STA. 22+50.00
END GRADE
R/R SPIKE IN 28" GUM
53.43' RT, EL. 35.73'
-L- STA. 17+16.05
BM #1
PI = 16+35.00
EL = 40.44'
(-)1.3638%(-)0.3653%
VC = 180'
PI = 21+60.00
EL = 38.53'
(-)0.3653%(+)0.3000%
VC = 180'
DS = >70 mph
VC = 180'
K = 271DS = 65 mph
VC = 180'
K = 180
TO BE REMOVED
EXISTING BRIDGE
LOW CHORD
LOW SIDE
ON 2-22-2018=32.9
NWSE & WSE
(-) 1.8182%
ELEV=35.00
PI STA 17+20 -L- LT
ELEV=41.50
PI STA 14+00 -L- RT
ELEV=36.00
PI STA 16+90 -L- RT
(-) 1.8966%
ELEV=39.00
PI STA 15+00 -L- LT
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 860
= 50
= 35.2
= 1050
= 100
= 35.6
= 2600
= +500
= 38.7
= 2-22-2018
= 32.9
SHEET PILING
SHEET PILING
EST. 15 CY
EXCAVATE TO NG EST. 20 CY
EXCAVATE TO NG
F
F
F
F
F
F
F F F
F
F
C
F
C C
C
C C
C
Submitted 4/21/2021
WETLAND
DENOTES FILL INFF
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 1
SITE 2
SITE 3
SITE 3
F
WETLAND WA
WETLAND WA
MECH
DATE: 1-14-2021
0 50'25'50'
SCALE: 1"=100'
100'
SHEET 3 OF 6
PERMIT DRAWING
REVISIONS 8/17/99$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
NC COA No. F-1255
Raleigh, NC 27612-3228
Suite 400
5400 Glenwood Avenue
CDM Smith Inc.
4
NAD
83
/NA
2011
20
30
40
10
0
50
60
70
B-5642
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
BRIDGE APPROACH SLAB
12 13 14 15 16 17 18 19 20 21 22 23 24 25
80 80
70
60
50
40
30
20
10
0
915 JONES FRANKLIN ROAD
RALEIGH, NORTH CAROLINA 27606
NC COA No. C-0890
SUNGATE DESIGN GROUP, P.A.BRANCHBATARORA 30303131313132
323232
323232 32323232333
333 333333
3333
3333333333333
333
3333 3333333333
33
33333333333333
33
3333333434
34
34
3434 3434343434
34343434343434343434 3434343434
34
3435353535
353535
35
3535353535353535 35353535353535
35 3535 35353535353535
3535
3535
3535
3535 35353535
3636
363636363636363636
36363636363636
36363636363737373737373737 37373737373737 373737373
73737373737383838383838383838383838383838383939
39393939 393939
4040404040 404040 404040404040404141414141 414141424242424242
434343 43434343
44444444
44 4444
44
4445
4545
45 4545454545 454545454545454545
45454646 464646
46
4646
4646464647474747 47474747484848 4848484848
4849494949494950505050505050
51515151 51525252525253545515" RCP
15" RCP
WELL
HTR 1SFD
18" RCP
15" CMPGRAVEL CONC
18" RCP
18" CMP
GATE
PALMATIER LNNC 87 (MACO RD) 23' BSTNC 87 (MACO RD) 23' BST
WOODS
WOODS WOODS WOODS
WOODS
WOODS
WOODS
WOODS
WOODS
ALENE PELLOM HEIRS
LEO KNOX, ET UX
DAISY MAE OLIVER
DAISY MAE OLIVER
SALAS ANGELICA
JEANNE BETH BAKER
BILLY RAY PALMATIER, ET UX
BILLY RAY PALMATIER, ET UX
JAMES ALSTON, JR, ET UXPB 62 PG 2645' PRIVATE EASEMENTPB 62 PG 2645' PRIVATE EASEMENTPB 35 PG 5760' PRI
VATE EASEMENT100.00'100.00'EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
DECK
S
WOODS
NC 87 (MACO RD) 23' BST
30.00'50.00'RW3RW4RW5Duke Energy Progress
Charter Communication
Charter Communication
AT&T Corp.(2)
Progress
Duke Energy
TT48" WOOD
SEPTIC TANK
POSSIBLE
SOIL
CONC
65
BRIDGE 80.00'45469454704547145472454744547545476454774547845479454804548145482454894550745534455354553645537455384553945540455414555745558455594556045561455624556345564455654556645567455684556945570455711520PC Sta. 23+71.72 25PT Sta. 25+87.87
1
2
3
2EST 5 SY GF
EST 1 TON
CL B RIPRAP
2GI
2GI
EST 5 SY GF
EST 1 TON
CL B RIPRAP
REMOVE
RETAIN
REMOVE
18"
18"
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
3:1D
FROM STA. 14+00 TO STA. 16+90 -L- RT
FROM STA. 15+00 TO STA. 17+20 -L- LT
Min. D=1.0 Ft.
DETAIL 1
Ground
Natural
Flatter3:1 or
Slope
Fill
SEE DETAIL 1
SPEC. LAT. V-DITCH
SEE DETAIL 1
SPEC. LAT. V-DITCH
EST 10 SY GF
EST 3 TONS
CLASS B RIP RAP
DAYLIGHT DITCH
STA. 18+92 -L- LT & RT
END APPROACH SLAB TO
SHOULDER BERM GUTTER
15" W/ELBOWS
ELBOWS
15" W/
(STRUCTURE PAY ITEM)
TO SHOULDER POINT
CLASS II RIP RAP
(ROADWAY PAY ITEM)
TO SHOULDER POINT
ROCK PLATING
(ROADWAY PAY ITEM)
TO SHOULDER POINT
ROCK PLATING
(ROADWAY PAY ITEM)
TO SHOULDER POINT
ROCK PLATING
EST 10 SY GF
EST 3 TONS
CLASS B RIP RAP
DAYLIGHT DITCH
PROPOSED GRADE
EXISTING GROUND
EL. 43.65'
-L- STA. 14+00.00
BEGIN GRADE
EL. 38.80'
-L- STA. 22+50.00
END GRADE
R/R SPIKE IN 28" GUM
53.43' RT, EL. 35.73'
-L- STA. 17+16.05
BM #1
PI = 16+35.00
EL = 40.44'
(-)1.3638%(-)0.3653%
VC = 180'
PI = 21+60.00
EL = 38.53'
(-)0.3653%(+)0.3000%
VC = 180'
DS = >70 mph
VC = 180'
K = 271DS = 65 mph
VC = 180'
K = 180
TO BE REMOVED
EXISTING BRIDGE
LOW CHORD
LOW SIDE
ON 2-22-2018=32.9
NWSE & WSE
(-) 1.8182%
ELEV=35.00
PI STA 17+20 -L- LT
ELEV=41.50
PI STA 14+00 -L- RT
ELEV=36.00
PI STA 16+90 -L- RT
(-) 1.8966%
ELEV=39.00
PI STA 15+00 -L- LT
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 860
= 50
= 35.2
= 1050
= 100
= 35.6
= 2600
= +500
= 38.7
= 2-22-2018
= 32.9
SHEET PILING
SHEET PILING
EST. 15 CY
EXCAVATE TO NG EST. 20 CY
EXCAVATE TO NG
F
F
F
F
F
F
F F F
F
F
C
F
C C
C
C C
C
Submitted 4/21/2021
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
30 30
35 35
40 40
45 45
25 2518+50.00
35 35
40 40
30 30
35 35
40 40
30 30
19+00.00
35 35
40 40
30 30
19+50.00
35 35
40 40
45 45
30 30
20+00.00
X-4B-5642
-L-
2.5 5
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJ. REFERENCE NO.SHEET NO.0
6/23/1618+66±
END BRIDGE STA. 18+66±
0.020 0.020
31.90EXIST R/WEXIST R/WWETLAND2:1 2:10.020 0.020
38.64EXIST R/WEXIST R/W38.64WETLAND WETLAND2:1
2:10.020 0.020
38.43EXIST R/WEXIST R/WWETLANDWETLAND2:1
0.020 0.020
38.28EXIST R/WEXIST R/W2.5:1WETLANDWETLAND2:1
0.020 0.020
38.27EXIST R/WEXIST R/W3:1WETLANDWETLANDMECHANIZED CLEARING
FILL IN WETLAND
MECHANIZED CLEARING
FILL IN WETLAND
FILL IN WETLAND
MECHANIZED CLEARING
MECHANIZED CLEARING
FILL IN WETLAND
FILL IN WETLAND
MECHANIZED CLEARING
MECHANIZED CLEARING
FILL IN WETLAND
FILL IN WETLAND
MECHANIZED CLEARING
FILL IN WETLAND
MECHANIZED CLEARING
SHEET 4 OF 6
PERMIT DRAWING
SITE 2
SITE 2 SITE 3
SITE 3
DATE: 1-14-2021
Submitted 4/21/2021
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
35 35
40 40
45 45
30 30
20+50.00
35 35
40 40
21+00.00
35 35
40 40
30 30
21+50.00
35 35
40 40
30 30
22+00.00
35 35
40 40
30 30
22+50.00
35 35
40 40
30 30
23+00.00
X-5B-5642
-L-
2.5 5
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJ. REFERENCE NO.SHEET NO.0
6/23/16END TIP PROJECT B-5642 STA. 22+50.00
2:1 3:10.020 0.020
EXIST R/WEXIST R/W38.44WETLAND WETLAND2:1 3:10.020 0.020
38.55EXIST R/WEXIST R/WWETLANDWETLAND3:10.020 0.020
38.63EXIST R/WEXIST R/W3:1WETLAND WETLAND3:1
3:10.020 0.020
EXIST R/WEXIST R/W38.6838.68WETLAND WETLANDEXIST.EXIST.
38.80EXIST R/WEXIST R/WWETLAND38.83
MECHANIZED CLEARING
FILL IN WETLAND
FILL IN WETLAND
MECHANIZED CLEARING
FILL IN WETLAND
MECHANIZED CLEARING
MECHANIZED CLEARING
MECHANIZED CLEARING
SITE 3
SITE 3
SHEET 5 OF 6
PERMIT DRAWING
DATE: 1-14-2021
SITE 2
SITE 2
Submitted 4/21/2021
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural SiteStationStructureFill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To)Size / TypeWetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 18+01 to 18+04-L-LTROADWAY FILL< 0.012 18+58 to 21+69-L-LTROADWAY FILL0.020.033 18+58 to 20+84-L-RTROADWAY FILL0.020.0321+60 to 22+39-L-RTROADWAY FILL< 0.01< 0.01TOTALS*:0.040.070 0 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 6OF 6WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSBrunswick CountyB-564245597.1.1NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS1-14-2021Submitted 4/21/2021