Loading...
HomeMy WebLinkAbout20210194 Ver 1_Pre-Filing Meeting Information_20210420DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20210194 1 Mooresville Regional Office - (704) 663-1699 Donna Hood Pre-Filing Me eting Reque st submitte d 1/29/2021 Michael Iagnocco, PWS michael.iagnocco@stvinc.com McCullough Drive Streetscape City of Charlotte - Sharon Buchanan Mecklenburg City Charlotte State / Province / Region NC Postal / Zip Code 28202 Country USA Street Address 600 E Fourth Street Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Alan Johnson Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date The City of Charlotte Office of Engineering and Property Management proposes to make street improvements including adding sidewalks and bike lanes to the existing McCullough Drive from NC 24 (WT Harris Blvd) to the east of US 29 (N Tryon Street). In addition, the city is proposing to create a new alignment on the east side of N Tryon Street that will connect McCullough Drive with E McCullough Drive. STV is providing design and Section 404.401 services on behalf of the City of Charlotte. A Preliminary Jurisdictional Determination package was issued by the USACE on April 18, 2016 (SAW-2016-00053). Its anticipated that the proposed design will require a new culvert as well as a culvert extension. 2/1/2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 SAW-2016-00053 JD Tearsheet (4-18- 2016).pdf 1.5MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 1/29/2021