HomeMy WebLinkAbout20210194 Ver 1_McCullough_Permit_2021-03-10_20210420(24Research DrTechnology DrGl
enwat
er Dr
Par
k DrExecut
i
veUni
ver
si
t
yNottoway
Brookside Ln
J M Ke
y
n
e
s Dr
Mc
Cullough
Dr
J W Clay Bv
Ibm Dr
Washington BvShopping Center Dr
Center
Youth Care Center-University
Medical
Carolinas
Ch.
Hampton
New University City BvUniversity City Bv29
49
INTERSTATE
85
29
W W T Harris Blvd
E W T Harris Blv
d
Toby Creek Rd
INTERSTATE
85 Toby CreekBl
vdCamer
onBEGIN PROJECT
END PROJECT
EX. 1'6" C&G
EX. 1'6" C&G
EX. 1'6" C&G CONC. WALKEX. 2'6" C&GEX. 1'6" C&GVICINITY MAP
NTS
TOTAL SHEETS 186
Plan & Profile ................................................................................ 4-29
Scale 200
Alignment Layout ............................................................................ 3E
Cross Sections .................................................................... X-1 - X-41
-L- Sta. 11+90.32
Begin Project
-L- Sta. 66+04.00
End Project
W.T. HARRIS BLVDJW CLAY BLVDMc
CUL
L
OUGH DR-
L-
-Y-
BRENTMOOR DR
HITCHCOCK LANE
IKEA BLVD-L-KEN HOFFMAN DR
-Y1-PARK DREXECUTIVE UNIVERSITY (NORTH TRYON ST)U.S. HWY 29(NORTH TRYON ST)U.S. HWY 29451567
8
9 10 11 12 131410+00
15+00
20+00
15+0025+00
30+00
35+00
40+0045+0050+0055+0060+00
65+00
70+00COLLINS-AI
KMAN DRTypical Sections ................................................................ 3A-1 - 3A-3
Storm Drainage Summary................................................ 3C-1 - 3C-3
Earthwork Summary....................................................................... 3D
SURVEY PREPARED BY:
CITY OF CHARLOTTE E&PM SURVEY DIVISION
COORDINATE SYSTEM: US STATE PLANE 1983 (2001 HARN ADJUSTMENT)
ZONE: NORTH CAROLINA 3200
PROJECT DATUM: NAD 1983 (2001 HARN ADJUSTMENT)
VERTICAL DATUM: NAVD 88 GEOID
PROJECT LOCALIZED (GRID TO GROUND): NCGS PATROL
USING A SCALE FACTOR OF 0.99984276
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
NGSS PATROL TO POINT NGSS MEDICAL IS
N86-54-43.2E 759.06 (FT)
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
COORDINATE UNITS: US SURVEY FEET
General Notes ................................................................................... 2A
Cover Sheet ......................................................................................... 1
-DR1--DR1- Sta. 11+40.00
End Construction
Retaining Wall Detail ....................................................... 2B-1 - 2B-5
PARK DRUNIVERSITY EXECUTIVE -DR1A--Y1- Sta. 12+19.19
End Construction
Curb Return Profile ......................................................... 2C-1 - 2C-6
PROWAG Details ........................................................... 2D-1 - 2D-19
Traffic Control Plans ................................................TCP-1 - TCP-12
-Y- Sta. 14+24.49
Begin Construction
-DR1A- Sta. 10+44.67
End Construction
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
UNLESS ALL SIGNATURES COMPLETED
DOCUMENT NOT CONSIDERED FINAL
E
S
D
T
WM
WV
E
T
FOR CONSTRUCTION
PLANS PREPARED BY:
Landscape Management
CLTWater
CDOT - Implementation
Engineering Services
LOCATION MAP
NTS
Construction Administration
Contract Administration
Bid Set No.
CITY ENGINEER
APPROVED _________________ ________
DATE
CONVENTIONAL SIGNS
2018 STANDARD SPECIFICATIONS
____________
RECOMMENDED
Horz. Profile ............
Vert. Profile .............
Plan View .................
GRAPHIC SCALES
602040
602040
1248
Cross Section ...........
15510
Storm Water Services
Planning
Utility Coordinator
CDOT - Design
PE SEAL
Record Drawings
Proposed Edge of Pavement ..........................
Railroad Tracks ..............................................
Existing Property Line ...................................
Existing Structures .........................................
Maintained as R/W Line ................................
Existing Water Meter .............................................................................
Fence ................................................................
Existing Storm Drainage ...............................
Slope Stake Line .............................................
Existing Gas Line ...........................................
Existing Underground Telecommunications
Existing Sanitary Sewer ................................
Proposed Storm Drainage .............................
Existing Water Line .......................................
Existing Water Valve .............................................................................
Temporary Construction Easement .............
Existing Underground Electric .....................
Existing Tree ...........................................................................................
Guy Wire ............................................................................................
Existing Utility Pole ................................................................................
Existing Gas Valve .................................................................................
Existing Sanitary Sewer Manhole .........................................................
Existing Storm Drain Manhole ..............................................................
Proposed Storm Drain Manhole ...........................................................
Existing Telephone Manhole .................................................................
Existing Catch Basin ..............................................................................
Proposed Catch Basin ............................................................................
Existing Light Pole .................................................................................
Proposed Light Pole ................................................................................
Proposed Telephone Manhole ...............................................................
Existing Electric Manhole .....................................................................
Proposed Electric Manhole ...................................................................
Proposed Sanitary Sewer Manhole .......................................................
Proposed Guardrail ...................................................................
Proposed Rip Rap Ditch ..............................................................
Proposed Asphalt Pavement ........................................................
Proposed Pavement Removal ......................................................
Proposed Gravel ...........................................................................
Tree Protection .............................................................................
Accessible Ramp ...................................................................................
Existing Drop Inlet..................................................................................
Proposed Drop Inlet................................................................................
Existing Fire Hydrant ............................................................................
Iron Pin ....................................................................................................
Proposed Utility Pole ..............................................................................
Proposed Fire Hydrant ..........................................................................
Proposed Curb & Gutter, Conc. Drive, Sidewalk ...................
Proposed Sidewalk Bridging Tree Roots ..................................
Silt Fence .....................................................................................
Asphalt Milling ............................................................................
Utility Easement .............................................
Sidewalk/Utility Easement .............................
Storm Drainage Easement .............................
Post Construction Controls Easement ..........
New Property Line .........................................
Conservation Easement ................................
INDEX OF SHEETS
3/10/2021
ADT 2020 =
ADT 2040 =
DHV =
D =
T =
V =
13,200
17,200
N/A
35 MPH
FUNC. CLASSIFICATION:
Existing Overhead Electric ...........................
Proposed Overhead Utility ............................
GENERAL SERVICESPROJECT LENGTH = 1.025 MILES
(McCULLOUGH DRIVE)Project Name: McCullough Drive Streetscape Improvements Project Number: 512-15-013Project Features:
Construction Plans of Proposed
Erosion Control, and Utilities
Sidewalk, Curb & Gutter, Paving, Grading, Drainage,
Project No. : 512-15-013
McCullough Drive Streetscape Improvements
AIKMAN DR
COLLINS
DESIGN DATA
1,224
5%
AVENUE
100% Plan Submittal
Proposed Handrail .....................................................................
BLVD
W.T. HARRIS
Erosion Control Plans ....................................................EC-1 - EC-27
Utility By Others Plans ............................................UBO-1 - UBO-14
Signing Plans ......................................................................SN-1 - SN-7
Pavement Marking Plans ...............................................PM-1 - PM-7
GENERAL SERVICES
Storm Drainage Details..................................................... 3B-1 - 3B-5
STREAM IMPACTS
SITE 1
FIGURE
SEE
SITE 1DREAST McCULLOUGHSheet 1 of 12
Permit Drawing
SITE 2
FIGURE
SEE
SITE 2
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET212R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh02.dgn
3/10/2021
Scale 20
NAD 83
512-15-013JOB NO.JNJAPPROVED BY3/10/2021DATESCALE1"=40'UNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALSTREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PLANPREPARED BYWAWGRAPHIC SCALE
40 800 MKACHECKED BYIMPACTS IN SURFACE WATER
DENOTES TEMPORARYTSTS
S S
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
S4 = 7 LF
IN SURFACE WATER
TEMPORARY IMPACTS
S4 = 29 LF
IN SURFACE WATER
TEMPORARY IMPACTS
S3 = 107 LF
IN SURFACE WATER
PERMANENT IMPACTS
AREA (AC)LENGTH (FT)
SW IMPACTS
PERMANENT
SW IMPACTS
TEMPORARY
0.01 107
360.01
STREAM PERMIT IMPACT
Sheet 2 of 12
Permit Drawing
8"OAK
8"OAK 8"OAK 8"OAK
8"OAK 8"OAK
8"OAK
8"OAK 8"OAK
8"OAK
5" CHERRY
8" CHERRY
Mccullough Dr.
DB 24282 PG 975
M45-499
LJW LAND LLC.
049-331-38
31
32
E Mccullough Dr.
DB 13897 PG 368
MB 45 PG 499
ST JAMES PLACE OF CHARLOTTE LLC.
049-331-40
30
8340 N Tryon St.
DB 24342 PG 883
APPLE NINE HOSPITALITY, INC.
049-331-02
30
8340 N Tryon St.
DB 24342 PG 883
APPLE NINE HOSPITALITY, INC.
049-331-02
28
8335 Russell St.
DB 10782 PG 469
NEW HAMPTON PRESBYTERIAN CHURCH
NOW OR FORMALLY
049-331-23
-L- Sta. 66+04.00
END PROJECT
EAST McCULLOUGH DR-L--DR1--DR1A-
E = 1,477,963.8457
N = 569,157.4888
JURISDICTIONAL STREAM
TS
TS
TS
S
S
S S
S S
S S
S S
S S
S
S
S
S S
S S
S
S
S S
S S
S
S
S
SS
S
S
S
S
S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
SS
TS
TS
TS
TS
TS
TS
TS
TS
TS TS
TS
TS 65+0063+0064+0066+0011+00
14
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET312R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh03.dgn
3/10/2021
Scale 40
NAD 83
512-15-013JOB NO.JNJAPPROVED BY3/10/2021DATESCALE1"=40'UNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALSTREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PLANPREPARED BYWAWGRAPHIC SCALE
40 800 MKACHECKED BYIMPACTS IN SURFACE WATER
DENOTES TEMPORARYTSTS
S S
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
AREA (AC)LENGTH (FT)
SW IMPACTS
PERMANENT
SW IMPACTS
TEMPORARY
0.01 107
360.01
STREAM PERMIT IMPACT
S4 = 29 LF
IN SURFACE WATER
TEMPORARY IMPACTS
S3 = 107 LF
IN SURFACE WATER
PERMANENT IMPACTS S4 = 7 LF
IN SURFACE WATER
TEMPORARY IMPACTS
Sheet 3 of 12
Permit Drawing
S
S
S
INVERT OUT=704.49'
INVERT IN=704.66'
RIM=721.13'
SSMH
INVERT OUT=719.51'
RIM=734.62'
SSMH
S
S
S
8"OAK
8"OAK 8"OAK 8"OAK
8"OAK 8"OAK
8"OAK
8"OAK 8"OAK
8"OAK
5" CHERRY
8" CHERRY
SSMH
SSMH
INVERT OUT=693.59'
INVERT IN=693.72'
RIM=704.70'
SSMHSSMH
METAL LIGHT POLE
-L- Sta. 66+04.00
END PROJECT
EAST McCULLOUGH DR-L-13'13'13'13'13'-DR1--DR1A-
11'12'13'12'11'
E = 1,477,963.8457
N = 569,157.4888
JURISDICTIONAL STREAM
Mccullough Dr.
DB 24282 PG 975
M45-499
LJW LAND LLC.
049-331-38
31
32
E Mccullough Dr.
DB 13897 PG 368
MB 45 PG 499
ST JAMES PLACE OF CHARLOTTE LLC.
049-331-40
30
8340 N Tryon St.
DB 24342 PG 883
APPLE NINE HOSPITALITY, INC.
049-331-02
30
8340 N Tryon St.
DB 24342 PG 883
APPLE NINE HOSPITALITY, INC.
049-331-02
28
8335 Russell St.
DB 10782 PG 469
NEW HAMPTON PRESBYTERIAN CHURCH
NOW OR FORMALLY
049-331-23
TS
TS
TS
S
S
S S
S S
S S
S S
S S
S
S
S
S S
S S
S
S
S S
S S
S
S
S
SS
S
S
S
S
S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
SS
TS
TS
TS
TS
TS
TS
TS
TS
TS TS
TS
TS PRC Sta. 63+39.35PT Sta. 65+56.6365+0063+0064+0066+00PC Sta. 10+35.93
POT Sta. 12+00.00
PT Sta. 10+77.26POT Sta. 11+00.00-DR1A- POT Sta. 10+00.00
-DR1- POT Sta. 10+81.26
-DR1- POT Sta. 10+00.00
-L- POT Sta. 65+50.69
11+00
14
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET412R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh04.dgn
3/10/2021
Scale 20
NAD 83
512-15-013JOB NO.JNJAPPROVED BY3/10/2021DATESCALE1"=40'UNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALPREPARED BYWAWGRAPHIC SCALE
20 400 MKACHECKED BYIMPACTS IN SURFACE WATER
DENOTES TEMPORARYTSTS
S S
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
STREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PLANAREA (AC)LENGTH (FT)
SW IMPACTS
PERMANENT
SW IMPACTS
TEMPORARY
0.01 107
360.01
STREAM PERMIT IMPACT
S4 = 29 LF
IN SURFACE WATER
TEMPORARY IMPACTS
S4 = 7 LF
IN SURFACE WATER
TEMPORARY IMPACTS
S3 = 107 LF
IN SURFACE WATER
PERMANENT IMPACTS
Sheet 4 of 12
Permit Drawing
SSMH
SSMH
TSTSTS
TS TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
S S S
SSS
S S S
SSS
S S S
S
S S
S
S
S
SS
S
S
S S
SS
S
S
S S
SS
S
S
S S
SS
S
S
S S
SSS
S
S S
SS
S
S
S S
SS
S
S
S S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
EAST McCULLOUGH DR-L-
JURISDICTIONAL STREAM
8340 N Tryon St.
DB 24342 PG 883
APPLE NINE HOSPITALITY, INC.
049-331-02
8340 N Tryon St.
DB 24342 PG 883
APPLE NINE HOSPITALITY, INC.
049-331-02
8335 Russell St.
DB 10782 PG 469
NEW HAMPTON PRESBYTERIAN CHURCH
NOW OR FORMALLY
049-331-23
30
28
30 63+0063+00
64+00
62+00
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET512R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh05.dgn
3/10/2021
63+00 64+00 65+00 66+0062+00 67+00 H: 1" = 20' V: 1" = 4' SCALEJNJCHECKED BY3/10/2021DATE512-15-013JOB NO.PREPARED BYNPJNJAPPROVED BYUNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINAL692
696
700
704
708
712
716
720
724
728
732
676
680
684
688
668
672
736
740
744
748
752
692
696
700
704
708
712
716
720
724
728
732
676
680
684
688
668
672
736
740
744
748
752
-L-
-LEFT-STREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PROFILESheet 5 of 12
Permit Drawing
END PROJECT
ELEV. 721.45'
-L- STA. 66+04.00
EXISTING GROUND
PROPOSED GRADE
(-)1.9182%-L- STA. 65+50.69=-DR1- STA. 10+00.00RCP @ 0.50%
29'-15" CL-4
14
07
14
07
INV OUT=716.80
INV IN=717.00
GRATE=723.06
STA. 64+97.85, 14.25' LT
PROP. CB
14
10
14
10
INV OUT=717.65
GRATE=721.33
STA. 65+87.34, 13.25' LT
PROP. DCB
62'-15" CL-4 RCP @ 0.50%
14
02
14
02
BURIED 1' @ 5.20%
59'- 8'X6' RCBC
SEE DETAIL SHEET 3B-5
INV IN=693.00 (BURIED 1')
STA. 62+85.73, 28.00' LT
WITH RETAINING WALL
UPSTREAM CULVERT END
VPI STA. 62+85.73
ELEV. = 694.00'
VPI STA. 62+83.28
ELEV. = 694.07'
(-) 1.00%
14
12
RCP @ 0.50%
29'-15" CL-4
14
12
INV OUT=717.14
INV IN=717.34
GRATE=722.69
STA. 65+26.31, 16.13' LT
PROP. CB
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET612R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh06.dgn
3/10/2021
63+00 64+00 65+00 66+0062+00 67+00 H: 1" = 20' V: 1" = 4'SCALEJNJCHECKED BY3/10/2021DATE512-15-013JOB NO.PREPARED BYNPJNJAPPROVED BYUNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINAL692
696
700
704
708
712
716
720
724
728
732
676
680
684
688
668
672
736
740
744
748
752
692
696
700
704
708
712
716
720
724
728
732
676
680
684
688
668
672
736
740
744
748
752
-L-
-RIGHT-STREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PROFILESheet 6 of 12
Permit Drawing
END PROJECT
ELEV. 721.45'
-L- STA. 66+04.00
EXISTING GROUND
PROPOSED GRADE
(-)1.9182%-L- STA. 65+50.69=-DR1- STA. 10+00.0014
01
14
01
INV OUT=714.15
STA. 62+26.79, 34.00' RT
PROP. FES
@ 1.00%
15'-18" RCP
14
04
14
06
14
05
@ 1.00%
39'-18" RCP
@ 1.00%
7'-15" RCP
14
06
INV OUT=711.00
RIM=724.35
STA. 64+62.64, 30.37' RT
PROP. OUTLET CONTROL STRUCTURE
14
05
14
04
INV OUT=704.60
STA. 64+11.90, 36.22' RT
PROP. FES
@ 10.00%
9'-18" RCP
14
08
14
09
14
08
14
09
14
11
14
11
INV OUT=711.00
INV IN=712.93
STA. 64+85.00, 27.15' RT
PROP. UNDERGROUND STORAGE CHAMBER - BMP-4
INV OUT=717.54
GRATE=721.37
STA. 65+93.78, 13.44' RT
PROP. DCBELEV. = 714.15'VPI STA. 62+26.79VPI STA. 64+11.90(-)26.32
%
(+)10.44%VPI STA. 63+00.00VPI STA. 63+09.50VPI STA. 63+50.00VPI STA. 63+19.20ELEV. = 691.28ELEV. = 690.85ELEV. = 690.55ELEV. = 697.38ELEV. = 704.60INV OUT=714.30
INV IN=714.75
RIM=719.10
STA. 62+12.23, 34.16' RT
PROP. MH
14
01A
14
01A
14
03
14
03
INV OUT=704.99
INV IN=710.15
RIM=714.52
STA. 64+51.87, 32.22' RT
PROP. MH
DETAIL A
LATERAL BASE DITCH
DETAIL A
LATERAL BASE DITCH
(-)4.53%
RCP @ 0.50%
29'-15" CL-4
95'-15" CL-4 RCP @ 0.50%
INV OUT=713.00
INV IN=717.07 (1411)
INV IN=716.66 (1407)
GRATE=723.06
STA. 64+97.82, 14.25' RT
PROP. CB
0.50%
711.23
BURIED 1' @ 5.20%
59'- 8'X6' RCBC VPI STA. 62+50.00ELEV. = 708.04(-)3
3.5
2
%VPI STA. 64+00.00ELEV. = 702.60(+)22.18%
(+)16.81%
VPI STA. 63+05.10
ELEV. = 690.98
ELEV. = 690.40VPI STA. 63+24.12DETAIL B (-)1.78%
STANDARD BASE DITCH
SEE DETAIL SHEET 3B-5
INV OUT=689.98 (BURIED 1')
STA. 63+05.10, 28.00' RT
WITH RETAINING WALL
DOWNSTREAM CULVERT END
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET712R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh07.dgn
3/10/2021
Scale 20
512-15-013JOB NO.JNJAPPROVED BY3/10/2021DATESCALE1"=40'UNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALSTREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PLANPREPARED BYWAWGRAPHIC SCALE
40 800 MKACHECKED BYIMPACTS IN SURFACE WATER
DENOTES TEMPORARYTSTS
S S
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
NAD 83
Sheet 7 of 12
Permit Drawing
AREA (AC)LENGTH (FT)
SW IMPACTS
PERMANENT
SW IMPACTS
TEMPORARY
<0.01 19
9<0.01
STREAM PERMIT IMPACT
S2 = 19 LF
IN SURFACE WATER
PERMANENT IMPACTS
S1 = 9 LF
IN SURFACE WATER
TEMPORARY IMPACTS
APPROX
PAVED SHOULDER
PLAYGROUND
8"MAPLE
8"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
4"MAPLE
4"MAPLE
4"MAPLE
4"MAPLE
4"MAPLE
12"MAPLE
4"MAPLE
10"MAPLE
10"MAPLE
10"MAPLE
4"MAPLE
12"MAPLE
4"MAPLE
4"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
14"MAPLE
10"MAPLE
4"MAPLE
24"MAPLE
301 MCCULLOUGH DR.
DB 7958 PG 329
MB 25 PG 814
ATAPCO UEP INC.
047-451-22
14
13
047-211-10
MB 24 PG 676
DB 7958 PG 329
8301 UNIVERSITY EXECUTIVE PARK DR.
ATAPCO UEP, INC
201 MCCULLOUGH DR.
DB 7958 PG 329
MB 25 PG 814
ATAPCO UEP INC.
047-451-24
15
IKEA BLVDOF REVENUE
NC DEPARTMENT
DEVELOPMENT CENTER
UNIVERSITY CHILD
S
S
S
S S
S
S
S
S
S
S
S S
S S
TS
TS
TS 40+0038+00
41+0042+0039+0043+00
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET812R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh08.dgn
3/10/2021
Scale 40
NAD 83
512-15-013JOB NO.JNJAPPROVED BY3/10/2021DATESCALE1"=40'UNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALSTREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PLANPREPARED BYWAWGRAPHIC SCALE
40 800 MKACHECKED BYIMPACTS IN SURFACE WATER
DENOTES TEMPORARYTSTS
S S
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
S1 = 9 LF
IN SURFACE WATER
TEMPORARY IMPACTS
Sheet 8 of 12
Permit Drawing
S2 = 19 LF
IN SURFACE WATER
PERMANENT IMPACTS
AREA (AC)LENGTH (FT)
SW IMPACTS
PERMANENT
SW IMPACTS
TEMPORARY
<0.01 19
9<0.01
STREAM PERMIT IMPACT
APPROX
PAVED SHOULDER
PLAYGROUND
S
S
S
S
S
INVERT OUT=723.41'
INVERT IN=713.86'
RIM=729.74'
SSMH
INVERT=710.42'
RIM=719.52'
SSMH
INVERT OUT=706.77'
INVERT IN=708.47'
RIM=714.97'
SSMH
INVERT OUT=724.30'
INVERT IN=724.47'
RIM=732.54'
SSMH
INVERT OUT=728.20'
INVERT IN=728.59'
RIM=738.71'
SSMH
S
S
S
S
S
8"MAPLE
8"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
4"MAPLE
4"MAPLE
4"MAPLE
4"MAPLE
4"MAPLE
12"MAPLE
4"MAPLE
10"MAPLE
10"MAPLE
10"MAPLE
4"MAPLE
12"MAPLE
4"MAPLE
4"MAPLE
12"MAPLE
12"MAPLE
12"MAPLE
14"MAPLE
10"MAPLE
4"MAPLE
24"MAPLE
G
V
G
V
G
V
B
O
X
T
V
B
O
X
T
V
B
O
X
T
V
B
O
X
T
V
B
O
X
T
V
B
O
X
ELEC.
BOX
TV
BOX
TV
BOX
OPTIC
FIBER
B
O
X
UTILIT
Y
BOX
UTILITY
PED
TEL
BOX
TV
PED
TEL
PED
TEL
TV
T
T
SS
MH
SS
MH
SSMH
SSMH
PLASTIC LIG
HT P
OLE
PLASTIC LIG
HT P
OLEMET
AL LIG
HT P
OLE METAL LIG
HT P
OLE
IKEA BLVDOF REVENUE
NC DEPARTMENT
DEVELOPMENT CENTER
UNIVERSITY CHILD
4'3'10'
10'
10'3'4'
4'3'10'
10'
10'3'4'4'10'10'3'4'17.5'
32.5'5'G
&
C ELBATNUO
M "6-'1 TSIXE NIATER
301 MCCULLOUGH DR.
DB 7958 PG 329
MB 25 PG 814
ATAPCO UEP INC.
047-451-22
14
13
047-211-10
MB 24 PG 676
DB 7958 PG 329
8301 UNIVERSITY EXECUTIVE PARK DR.
ATAPCO UEP, INC
201 MCCULLOUGH DR.
DB 7958 PG 329
MB 25 PG 814
ATAPCO UEP INC.
047-451-24
15
S
S
S
S S
S
S
S
S
S
S
S S
S S
TS
TS
TS
PC Sta. 37+30.19
40+0038+00
41+0042+0039+0043+00
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET912R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh09.dgn
3/10/2021
Scale 20
NAD 83
512-15-013JOB NO.JNJAPPROVED BY3/10/2021DATESCALE1"=40'UNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALPREPARED BYWAWGRAPHIC SCALE
20 400 MKACHECKED BYIMPACTS IN SURFACE WATER
DENOTES TEMPORARYTSTS
S S
LEGEND
IMPACTS IN SURFACE WATER
DENOTES PERMANENT
STREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PLANS1 = 9 LF
IN SURFACE WATER
TEMPORARY IMPACTS
Sheet 9 of 12
Permit Drawing
S2 = 19 LF
IN SURFACE WATER
PERMANENT IMPACTS
AREA (AC)LENGTH (FT)
SW IMPACTS
PERMANENT
SW IMPACTS
TEMPORARY
<0.01 19
9<0.01
STREAM PERMIT IMPACT
IMPERVIOUS DIKE
DEWATERING DEVICE APPROX
12"MAPLE
12"MAPLE
12"MAPLE
4"MAPLE
SS
MH
TS
TS
TS
TS
TS
TS
TS
TS
TS
S S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
301 MCCULLOUGH DR.
DB 7958 PG 329
MB 25 PG 814
ATAPCO UEP INC.
047-451-22
14
13
047-211-10
MB 24 PG 676
DB 7958 PG 329
8301 UNIVERSITY EXECUTIVE PARK DR.
ATAPCO UEP, INC
38+00
37+00
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET1012R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh10.dgn
3/10/2021
714
718
722
726
730
734
738
742
746
750
754
714
718
722
726
730
734
738
742
746
750
754
714
718
722
726
730
734
738
742
746
750
754
714
718
722
726
730
734
738
742
746
750
754
38+00 39+00 40+00 41+0037+00 42+00
38+00 39+00 40+00 41+0037+00 42+00 H: 1" = 20' V: 1" = 4'SCALEJNJCHECKED BY3/10/2021DATE512-15-013JOB NO.PREPARED BYNPJNJAPPROVED BYUNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINAL-L-
-LEFT-
-L-
-RIGHT-STREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVEPERMIT DRAWING PROFILESheet 10 of 12
Permit Drawing
EXISTING GROUND
PROPOSED GRADE
VC = 150'
K = 141
PI = 39+50.00
EL = 732.45'
VC = 280'
K = 65
PI = 37+20.00
EL = 728.73'
END GRADE
ELEV. 734.46'
-L- STA. 40+25.00
ELEV. 739.86'
-L- STA. 42+07.00
BEGIN GRADE
(+)1.6174%
(+)2.6800%
(+)1.6174%
(-)2
.7139%IKEA BLVD.(+)3.5079%
09
06
09
06
09
07
09
07
RCP @ 0.50%
11'-15" CL-4
09
10
09
10
09
11
90'-15" CL-4 RCP @ 1.16%
09
11
09
12
09
12
RCP @ 1.00%
44'-15" CL-4
INV OUT=726.33
INV IN=726.53
GRATE=730.28
STA. 38+27.51, 23.36' LT
PROP. DCB
INV OUT=727.58
INV IN=727.78
GRATE=731.53
STA. 39+22.91, 23.25' LT
PROP. CB
INV OUT=729.42
GRATE=733.17
STA. 39+96.74, 23.25' LT
PROP. CB
INV OUT=725.84
GRATE=729.59
STA. 37+55.43, 23.25' LT
PROP. CB
70'-15" CL-4 RCP @ 2.35%
RETAIN
RETAIN
RETAIN
INV OUT=719.20 (EXIST.)
INV IN=719.40 (EXIST.)
INV IN=725.79 (0907)
GRATE=729.60
STA. 37+43.99, 23.25' LT
PROP. DCB
EXIST. 30" RCP
INV OUT=719.0
INV IN=719.4
GRATE=728.42
STA. 37+43.82, 23.10' LT
EXIST. CB
EXIST. 30" RCP
EXISTING GROUND
PROPOSED GRADE
VC = 150'
K = 141
PI = 39+50.00
EL = 732.45'
VC = 280'
K = 65
PI = 37+20.00
EL = 728.73'
END GRADE
ELEV. 734.46'
-L- STA. 40+25.00
ELEV. 739.86'
-L- STA. 42+07.00
BEGIN GRADE
(+)1.6174%
(+)2.6800%
(+)1.6174%
(-)2
.7139%IKEA BLVD.(+)3.5079%
09
03
09
03
09
05
RCP @ 0.50%
5'-15" CL-4
09
05
INV OUT=725.85
GRATE=729.60
STA. 37+55.47, 22.63' RT
PROP. CB
09
01
09
02
09
02
09
01
RCP @ 3.70%
27'-18"
09
04
09
08
09
09
RCP @ 1.75%
28'-15"
RCP @ 1.00%
44'-15" CL-4
09
04
09
08
09
09
INV OUT=718.00
RIM=730.32
STA. 37+64.10, 37.10' RT
PROP. OUTLET CONTROL STRUCTURE
INV OUT=721.37
INV IN=725.89
GRATE=730.05
STA. 38+27.93, 20.80' RT
PROP. DCB
192'-24" RCP @ 2.09%
INV OUT=724.03
INV IN=724.70
RIM=735.90
STA. 41+95.24, 291.04' RT
PROP. MH
RCP @ 1.00%
8'-30"
10
01A
10
01A
INV OUT=718.00
INV IN =720.90
STA. 37+82.28, 31.88' RT
PROP. UNDERGROUND STORAGE CHAMBER - BMP-2
RETAIN
REMOVE
REMOVE
RETAIN
REMOVE
10
06
RCP @ 2.00%
55'-24"
INV OUT=728.71
INV IN=729.83
RIM=740.46
STA. 42+37.18, 109.30' RT
PROP. MH
10
06
RETAIN
09
03A
INV OUT=718.80
INV IN=718.80
RIM=729.83
STA. 37+50.25, 15.60' RT
PROP. MH
INV OUT=718.01
INV IN=718.76 (0903A)
INV IN=725.83 (0905)
GRATE=729.60
STA. 37+50.83, 22.74' RT
PROP. CB
INV OUT=715.16
INV IN=715.16
RIM= 721.16
STA. 37+52.29, 57.03' RT
PROP. JB w/ MH
09
03A
RCP @ 0.53%
8'-30"
RETAIN
RETAIN
RETAIN
718.22
0.50%
INV OUT=716.99 (18")
INV OUT=715.08 (30")
STA. 37+52.69, 64.79' RT
PROP. EW
INV OUT=718.70
INV IN=718.80
GRATE=728.28
STA. 37+50.34, 15.29' RT
EXIST. DCB
INV OUT=715.62
STA. 37+47.91, 58.51' RT
EXIST. HEADWALL
EXIST. 30" RCP
EXIST. 30" RCP
INV OUT=724.03
INV IN=731.05
RIM=734.96
STA. 41+95.24, 291.04' RT
EXIST. SDMH
EXIST. 18" RCP
EXIST. 24" RCP
EXIST. 15" RCP
EXIST. 15" RCP
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET1112R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh11.dgn
3/10/2021512-15-013WAWNTH3/10/2021MKAJOB NO.PREPARED BYAPPROVED BYCHECKED BYDATESCALENTSPROPERTY OWNERS
NAMES AND ADDRESSES
NAMES ADDRESS
UNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALPARCEL NO.NAMES AND ADDRESSESPROPERTY OWNERS STREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVE14
INC.
APPLE NINE HOSPITALITY
STREET
8340 NORTH TRYON30
ATAPCO UEP INC.301 MCCULLOUGH DRIVE
Sheet 11 of 12
Permit Drawing
NO.DATEBYDESCRIPTIONPlans Prepared By:OFSHEET1212R:\Ustation\hydro\Permits_Environmental\Drawings\Sheets\McCullough Drive_Hyd_Prm_psh12.dgn
3/10/2021512-15-013WAWNTH3/10/2021MKAJOB NO.PREPARED BYAPPROVED BYCHECKED BYDATESCALEINCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITIONUNLESS ALL SIGNATURES COMPLETEDDOCUMENT NOT CONSIDERED FINALNTSPERMIT IMPACT SUMMARYSTREETSCAPE IMPROVEMENTSMcCULLOUGH DRIVESheet 12 of 12
Permit Drawing