Loading...
HomeMy WebLinkAbout20210812 Ver 1_17BP.1.R.92_Permit Drawings_08.21.19_20210419WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 3 PERMIT DRAWING RDY 5 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA Prepared in the Office of:DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA P.E. SIGNATURE: P.E. P.E. PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS 0 00 21-AUG-2019 15:44R:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.92_prm_tsh.dgn$$$$USERNAME$$$$STATE HIGHWAY DESIGN ENGINEERDEPARTMEN T O F TRANSPORTATIONSTATE O F NORT H CAR O LI NAADT == = = 0 0 0 PROJECT ENGINEER NCDOT CONTACTCONTRACT:W.B.S. NO. SIGNATURE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED TYPE OF WORK: WIDENING, GRADING, PAVING, DRAINAGE, AND STRUCTURE 17BP.1.R.92 2016 BRIDGE NO. 13 BRANCHES BRIDGE RD (SR 1339) OVER MEHERRIN RIVER (919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 E. MILLBROOK ROAD, SUITE #160 5 0.032 MILES FUNC CLASS = LOCAL RURAL =6%TTST =-%DUALS GUIDELINES SUB-REGIONAL TIER 0.081 MILES20102040 20 10 20 40 17BP.1.R.92 PE 4 4 82 0.113 MILES V = NORTHAMPTON COUNTY 80 30 RYAN SHOOK -L- STA 16+50 END PROJECT 09/08/9917BP.1.R.92PROJECT:Mt. Railroad dR OFF-SITE DETOUR LOCATION PROJECT VIRGINIA VICINITY MAP SR 1338Francisville RdSR 1333 Mt. Caramel Church Rd Branches Bridge RdSR 1339Crossroads Leweters Britton Rd SR 1337S R 1341Mt. To wer Rd SR 1346 Sharron Church Rd VA 663VA 701VA 730 CAROLINA NORTH VA 186 NC 186 VA-701 HWYTO(SR 1333)SEVERN RD TO -L- STA 10+55 BEGIN PROJECT BRANCHES BRIDGE RD (SR 1339) 2018 STANDARD SPECIFICATIONS APRIL 5, 2019 LENGTH ROADWAY PROJECT 17BP.1.R.92 LENGTH STRUCTURES PROJECT 17BP.1.R.92 TOTAL LENGTH PROJECT 17BP.1.R.92 -L- STA 13+38.75 BEGIN BRIDGE -L- STA 15+06.25 END BRIDGE MEHERRIN RIVER MEHERRIN RIVER -L- *DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVE MPH* 17BP.1.R.92 17BP.1.R.92 ROW UTIL 17BP.1.R.92 CONST BRUCE PAYNE, P.E. DANA RINGER100% PLANS MARCH 17, 2021 NA 2011NAD 83 /E NGINEER P ROFESSI ON A LNORTH CA R OLIN A SEAL 022610 .RJ ,ENYAP .B ECU RB E NGINEER P ROFESSI ON A LNORTH CA R OLIN A SEAL 043351 UNUH .D HTENN EK RETAIN SEE DETAIL A CUT 'V' DITCH 10 SY OF GEOTEXTILE 3 TONS CLASS B RIP RAP CUT OFF/REMOVE PYLONS (TYP.) 5 SY OF GEOTEXTILE 1 TONS CLASS B RIP RAP 5 SY OF GEOTEXTILE 1 TONS CLASS B RIP RAP SHEET 2 OF 3 PERMIT DRAWING WETLAND AND SURFACE WATER IMPACTS PERMIT 00 20 401020 SCALE REVISIONS DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 517BP.1.R.92 R/W SHEET NO.8/17/9921-AUG-2019 15:44R:\Hydraulics\PERMITS_Environmental\Drawings\17BP.1.R.92_prm_PSH_05.dgn$$$$USERNAME$$$$13 14 15 16 20 24 28 32 36 40 17-L- STA 12+75.00MATCHLINE SEE SHEET 416 12 8 8 12 16 20 24 28 32 36 40 -L- STA. 13+13.75 TO 13+38.75 (RT) -L- STA. 13+13.75 TO 13+38.75 (LT) PROPOSED SHOULDER BERM GUTTER Flatter4:1 or D ( Not to Scale) CUT DITCH DETAIL A Ground Natural Slope Ditch Front FROM STA. 15+50 TO STA. 16+503:11 GOODWOOD VIRGINIA, LLC DB 886 PG 325 MB 14 PG 64 Min. D= 1.2 Ft. RIGHT DITCH NOTE: See Sheets S-1 - S-22 for Structure Plans THE BRIDGE TO THE PAVEMENT SKETCH SHOWING THE RELATIONSHIP OF -L- STA. 13+27.88 BEGIN BRIDGE APPROACH BEGIN BRIDGE -L- STA. 13+38.75 END BRIDGE -L- STA. 15+06.25 -L- STA. 15+17.12 END BRIDGE APPROACH NC-L-MEHERRIN RIVER27.83'10'3'-11" 3'-11"10'R=15' SHOP CURVE TYPE-III SHOP CURVETYPE-III TYPE-III TYPE-III 15NC-L-SHOP CURVE TYPE-III TYPE-III TYPE-IIIGREU TL-2 GREU TL-2 -L-GREU TL-2PI Sta 15+57.73 D L = 80.67' T = 52.18' R = 50.00' -L- SE = NC NCSHOP CURVETYPE-III AT-1 EX EX NC BRIDGE SEAT=33.02' BRIDGE SEAT=33.15' 8' WD WW 8' WD WW BRIDGE SEAT=33.23' BRIDGE SEAT=33.34' 8' WD WW WD WW 8' WOODS 36" RCP GATE MTL GPS B5502-2 BM#1 MEHERRIN RIVER GLOVER FARMS OF CAROLINA, LLC DB 940 PG 217 MB 7 PG 49 GOODWOOD VIRGINIA, LLC DB 886 PG 325 MB 14 PG 64 STEPHENSON JAMES ELLIOTT DB 735 PG 778 BL-4 EL = 34.97' (+)5.6024%(+)0.3000% VC = 65' K = 12 PI = 15+45.00 EL = 35.72' (+)0.3000% ( - )3 .5828% VC = 50' K = 13 PI = 16+15.00 EL = 33.21' (-)0.9280% VC = 70' K = 26 DS = 25 MPH DS = 25 MPH ELEV. = 32.88 -L- Sta. 16+50.00 END GRADE STRUCTURE -L- Sta. 15+06.25 END BRIDGE -L- Sta. 13+38.75 BEGIN BRIDGE GRADE PROPOSED DS = 25 MPH Existing Down Stream Profile Existing Up Stream Profile AND PIERS BRIDGE, ABUTMENTS, REMOVE EXISTING LOWEST CHORD EXISTING BRIDGE 38.3' NCDOT 25-yr WSEL: ROAD EXISTING FEMA 100-yr WSEL: 39.0' PI = 12+95.00 WSEL: 27.1' NCDOT OT ELEVATION: 14.8' NORMAL POOL PROFILE THEORETICAL SCOUR SCOUR SLOPE 1.4:1 ELEVATION = 35.35' SKEW 90" 24" CORED SLAB 1 @ 50', 65', AND 50' CL BRIDGE STA. 14+22.50 -L- WSEL: 40.3' NCDOT 100-yr OR FLATTER CLASS II RIP RAP 1.5:1 OR FLATTER CLASS II RIP RAP 1.5:1 OF 23" SYCAMORE" "RR SPIKE IN BASE ELEV=32.59' 39.12' LEFT -L- STA. 15+90.04 BM#1 2 3 1 1 CLASS II RIP RAP CLASS II RIP RAP 501 502 503 504 TB 2GI TB 2GI INV=26.8 TOP=28.1 INV=32.1 TOP=34.8 INV=32.1 TOP=34.8 w/ ELBOWS 15" CAAP INV=28.3 TOP=29.6 w/ ELBOWS 15" CAAP SBG SBG SHOP CURVE TYPE-III TYPE-III TYPE-III -L- SHOP CURVETYPE-III AT-1 F F F F F F F F FFF CFCFF CCNAD 83/ 2011(919) 876-6888 NCBEES #F-0326 RALEIGH, NORTH CAROLINA 27609 1616 EAST MILLBROOK ROAD, SUITE 160 E NGINEER P ROFESSI ON A LNORTH CA R OLI N A SEAL 022610 .RJ ,ENYAP .B ECU RB E NGINEER P ROFESSI ON A LNORTH CA R OLIN A SEAL 043351 UNUH .D HTENN EK Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 13+74 / 13+94 Removing Existing Piles and Constructing Proposed Piles 0.00 0.00 0 2 14+14 / 14+24 Removing Existing Piles 0.00 same as site #1 3 14+51 / 14+65 Removing Existing Piles and Constructing Proposed Piles 0.00 0.00 same as site #1 TOTALS:0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Site 1 Permanent SW Impacts: 0.00 SF Site 2 Permanent SW Impacts: 0.00 SF ATN Revised 3/31/05 WBS - 17BP.1.R.92 (SF-650013) WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS PERMIT DRAWING SHEET 3 OF 3 NORTHAMPTON COUNTY NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS