HomeMy WebLinkAbout20040712 Ver 2_Corps of Engineer Correspondence_20121204 (2)Steenhuis, Joanne
From: Timpy, David L SAW [David.L.Timpy @usace. army. mi1]
Sent: Tuesday, December 04, 2012 10:43 AM
To: Dail, Jason; Wilson, Debra
Cc: Fritz Rohde - NOAA Federal; Baker, Jessi E; Steenhuis, Joanne
Subject: FW: Paul and Susan Magnabosco, SAW- 2004- 00705,CAMA Major App, GP291, Requet for
Federal Comments, 12 -19 -2012 (UNCLASSIFIED)
Attachments: 044 _SAW2004_00705_Stanwick_Shores. pdf
Hey,
I've been informed by our Navigation Branch that the plans for this project may be
incorrect. The apparent distance to the setback at this location is approximately 80 ft (see
attached). Can we have the plans revised to show the correct channel setback? If so, they
need to contact either myself or Todd Horton of our Navigation Branch. This could also
affect the comments of other resource agencies.
Dave
Dave Timpy
Project Manager
Regulatory Division
US Army Corps of Engineers, Wilmington District
69 Darlington, Avenue
Wilmington, North Carolina 28402 -1890
Office: 910 - 251 -4634
Cell: 910 - 617 -3254
Fax: 910 - 251 -4025
Email :david.L.Timpy @usace.army.mil
Website: http: / /www.saw.usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public.
To help us ensure we continue to do so, please complete the Customer Satisfaction Survey
located at our website at http: // pert .nwp.usace.army.mil /survey.html to complete the survey
online.
1