Loading...
HomeMy WebLinkAbout740094_Inspection_20201105Facility Number ¶la el Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Owner Name: \\S-20 Arrival Time: 6ur c&t vk3 Departure Time: Owner Email: -k•-- •1 (YNo 1 9 ri ov, or►�4 ., Mailing Address: Lt, 5 [ LI Physical Address: Phone: County: TIA-"'C- Region: Facility Contact: -j r I w—, ijv (AS2- .Q, Title: Phone: Onsite Representative: ?Dr I G.` .01W U , -17 Certified Operator: Back-up Operator: Location of Farm: Latitude: Integrator: Certification Number: Certification Number: Longitude: .1i\(A0P Ot.4 CA c , S;t,r.Gi v�G�nu�1 �.,.att n LA �.S o LiOU Cc., - c, %' - a Swine Design Current Capacity Pop. • • • • • • Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean 3)0 kMt Farrow to Feeder Farrow to Finish Gilts Boars Other Other Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dr v Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle Design Current Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NI ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Other: ❑ Yes ❑ o 0 NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 2/4/2015 Continued (Facility Number: ri,4 -ci' Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Date of Inspection: l -5- Zo ❑ Yes 'No ❑ NA ❑ NE ❑ Yes 'No ❑ NA ❑ NE Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes © o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ No ❑ NA 0 NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [] No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need n Yes No 0 NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect 1 fid application? If yes, check the appropriate box below. s ❑ No ❑ NA 0 NE ❑ Excessive Ponding E[ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptabl Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): w 5� 13. Soil Type(s): 1\6 f CA 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate n Waste Application ❑ Weeldy Freeboard ❑ Waste Analysis ❑ Rainfall ❑ Stocking ❑ Crop Yield 0 120 Minute Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes Er ❑ NA ❑ NE o ❑ NA ❑ NE No ❑ NA ❑ NE Lo ❑NA ONE El No ❑NA ❑NE [�No ❑NA ❑NE n/ No ❑ NA ❑ NE box below. ❑ Yes 0 No ❑ NA ❑ NE ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Monthly and 1" Rainfall Inspections 0 Sludge Survey ❑ Yes ON ❑ NA ❑ NE ❑ Yes o ❑ NA ❑ NE 2/4/2015 Continued SIOZ/t/Z f e s--I' a��4 Efofa2nd :a. n u$is .zolaadSUI/iann0!A 1 i.�ts' '°Rain :auzEN 101pOdsuI/JOMO!AO2l 711E-11° &cc' P1410(1`c 1bQ -2WI12b L-eS LI _)'J 1_ I l_ L'e s 'N^ °1 b ' _rr) C-0 t'CD 1 - LI-40g -)-19(-9s p-ng Q zaz_ ..� �� c r T Acri _ 41-,1-a,,P h-'r°- - o 01 -1)°2. ll -)3N40Z ,JO Pbo)•4'° )flmo.,pk\ fl-vu's Ul(M cq` u2.;nr) �1! _tcY'Vk itil /ri Oz frr b 5c' - dr-v„.4.01 4) 6 a ' A-¢ `� ys‘ 1"0 •(S.zgssaaau se sand leuoIpppu asn) suolpun;Is ungdxa asilaq o; )(man; Jo sau!Meap asn -swum() Jaw Sue ao suopgpuammoaa.z p'uopippu Sum Jo/pug &Jamsue S3A Sue uleldx;1 :(# uopsanb o; .zalaa) s;uammo0 3N ❑ 1N ❑ HN ❑ dN ❑ HN ❑ HN ❑ AN ❑ am ❑ am ❑ VN ❑ VN ❑ vN ❑ `dN ❑ `dN ❑ VN ❑ VN ❑ VN ❑ dN ❑ sox ❑ oINIE1 sox El o sax ❑ ziCauau Oures aqi /Cq !!sin dn-Mollo3 u annbal icupoij aqi saod •17£ zannmuasald0l albs-uo LIE qnm uo!podsui/iselO[nal ssnasip of Iluj 1olaadsuI/. omo!na21 agi P!a '££ ,doIMVO so ltuuad aqi Jo aauu►jduzoa-uou Osnua gaigm pOlou suzaigoid p uowppu /(ur alaM •Z£ :13410 ❑ puod oSEiolsNoogE-I ❑ piou uotivailddd ❑ saA ❑ •n+oiaq xoq aluudolddu aq1 rap `sof( ji zXiilizEj aqi lu ;s►xa sunup aj►i aauJInsgns ou • if (uo►luailddu-iono `suzalgold p.zuogoa.g `02nugasip `•a i) anzuad sox ❑ alp ,(q paunba.i su suo►lunits Xauaalotua Jo Oaw0 Iuuo!5o i aqi i Jgou of Iiei'Ciilt°Ej NI p'u •p£ •,(IaiE►pauzun OnquluasOidO1 /Cniuna .nd luuo►5O1 E !mum° `sof( 3I ❑ zuiaauoa i(igunb .nu so Jopo uE asod iCpliau3 o p pip uotiaadsut ow Jo aural aql lip' '6Z zIEuuou uugl Jag0iq a1OM imp solo.' ,Cuiuuouz uodOi puu ❑ luamnaop Jo/puu smog bZ gum sluunuE puap jo asodsip ,Cipodozd of llu3' !I!au3 agi p'u •gZ SOX slanal apnls io3 dad u dolanap of amjnj ❑ am ❑ VN ❑ °N ❑ so1C,�] IN❑ FAN°Ni sox❑❑ sanssl aagp° zuouuag!uaa (,I,v1d) sluauzssassg ssol stuogdsogd u amaas of in AI►II0E3 OLD Nu •LZ Zad.zuga ui .uneJOdo pagruaa Xion!ou uE Jo uoi1Eluaumaop apino1d iiu3 /(1II?Ou3 Oqi P'U •9Z :aauugdwoa-uou Ouuuaipui i(anms lull Jo amp puE (s)a1nioruls isq uooSul /Cue u! slanal apnls luugduzoa-uoN ❑ Xamns aOpnls Iunuuu alaidiuoa of ampuu j •molaq (so)xoq aNudo1ddu alp raga `saX 31 zapnls of pOiula! suoglipuoa liuuad cp!PA aauuilduzoo jo !no ,Citliauj agi sI •SZ zuuuad aqi (q paunbai su luauud►nba uotivatjddu alsum awiq►lua of Ii13 i(i►Iiau3 agi p'u •bZ 01-, S 1) :uopaadsul 3o Neu :aagmnN Slllae j