Loading...
HomeMy WebLinkAbout20210130 Ver 1_Shoreline Stabilization_20210413a� �-I ol3D DWR. Pre -Filing Meeting Request Form ID# * Regional Office * Reviewer List* 20210130 Version * 1 Winston-Salem Regional Office - (336) 776-9800 Sue Homewood Pre -Filing Meeting Request submitted 1/21/2021 Contact Name * Howard Steepy Contact Email Address * backfirehpo@hotmail.com Project Name * Shore line stabilization Project Owner* Howard Steepy&Tom Reebel Project County* Davidson Owner Address: Street Address 342 Rima Landing Address Line 2 Oty State / Rovince / Region Denton North Carolina Fbstal / Zip Cnr1P Country 27239 US Is this a transportation project?* C Yes 6" No Type(s) of approval sought from the DWR: r 401 Water Quality Certification - r 401 Water Quality Certification - Regular Express r Individual Permit r Modification F7 Shoreline Stabilization Does this project have an existing project ID#?* r Yes No Do you know the name of the staff member you would like to request a meeting with? Karen Baldwin ,property Compliance Supervisor Please give a brief project description below.* Installation of shoreline erosion control stabilization for a 100feet land frontage on lake. Please give a couple of dates you are available for a meeting. • NORTH CAROLINA Owimamate QWMIy RECEIVED/NCDEQ/DWR APR 13 2021 Water Quality Permitting Section 2/1/2021 2/8/2021 2/10/2021 Please attach the documentation you would like to have the meeting about. pdf �N By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your projects thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/21/2021 DWR Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(all 1. Owner Information Name: Howard Steeov Mailing Address: 342 Rima Landing Denton, NC 27239 Telephone Number: 828/808-9972 Fax Number: E-mail Address: masteepy@hotmail.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.armv.mil/Portals/59/docs/resulatorv/reedocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)1 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 4 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Denton Subdivision name or site address (include phase/lot number): Lot 41, Harborgate Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Lexington exit for NC Hwy 8, go south on NC Hwy 8, R on Harborgate Drive, R on Potter's Landing, L on Rima Landing, property is on the R side of road. Latitude (in decimal degrees) 35.37.4945 Longitude (decimal degrees) 80.12.1197 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Single-family residential community 6. Property size (acres): 0.46 acres 7. Lake/ river/ ocean adjacent to property: High Rock Lake 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 9. Will work be conducted from land? N From water? n 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 204 Sq. Ft. 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 1530 Sq. Ft. 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Numerous trees will be removed in order to complete the stabilization project. O3/0 Owner/Agent's Signature A NCAC 02H .0502(f)] Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 La ke (At Full Pond/Normal Water Level) Full Pond/ Normal Water Level SEE ATTACHED SITE PLAN AND DETAILS Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Howard Steepy Lot 41, Harborgate STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 102 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 10 on NCDEQ Form) Area of Impact = Shoreline Length x Depth* x Slope =102'x1'x2 = 204 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 11 on NCDEQ Form) Height of Bank Above Normal Pool is Uniform Across the Shoreline Estimate 102 LF of Shoreline = 5 ft. Above Normal Pool Area of Impact = Length x Height x Slope =(102'x5'x2) = 1020 sq. ft. Impact From Construction Above Shoreline Stabilization - Assume 5 ft. Wide Zone Area of Impact = 102' x 5 ft. = 510 sq. ft. Total Area of Impact Above Normal Pool Level = 1530 sq. ft. cc; 203.16 \. %/ / / VEGETATION AND EROSION CONTROL FABRIC EXISTING GRADE _ • 3 0`� rQ� - - , .. f *• t4 CLASS 2 RIP RAP 2 ®� IN 'IN*, 1 EROSION CONTROL FABRIC --�'�� .;1.46 %SSUI� \, \LAKE BOTTOM - TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE FOR: HOWARD STEEPY & TOM REEBEL LOCATION: LOT 41, HARBORGATE RESERVOIR: HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL' MODERATE HP RAP STABILIZATION 3 i r 3/31/2021 240 Rima Landing - Google Maps Gox;gle Maps 240 Rima Landing rteln View ist Church a,onrr Ya4• t P� c Map data ©2021 1000 ft https://www.google.com/maps/place/240+Rima+Landing,+Denton,+NC+27239/@35.6371134,-80.1973854,15z/data=!4m5!3m4! 1 s0x8853846e4d8e96... 1/1