Loading...
HomeMy WebLinkAbout20210484 Ver 1_Shoreline Stabilization_20210413DWR Pre -Filing Meeting Request Form Contact Name * Contact Email Address* Project Owner* Project Name* Project County* david maddex damaddex@aol.com david and yvonne maddex shoreline resoration Davidson Owner Address:* Street Address 461 rolling road Address Line 2 (sty lexington Postal / Zip Code 27292 Is this a transportation project?* r Yes +: No State / Ravine! Edon North Carolina CAuntry davidson Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - r 401 Water Quality Certification - Regular Express I— Individual Permit r Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yesr No Do you know the name of the staff member you would like to request a meeting with? no Please give a brief project description below.* i dont know if we have to meet but it would help me understand the limits and your expectations. Please give a couple of dates you are available for a meeting. 3/8/2021 3/8/2021 3/9/2021 3/10/2021 Please attach the documentation you would like to have the meeting about. RECEIVEDINCDE IDWR APR 13 2021 Water Quality Permitting Section shoreline photos.pdf 2MB Pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 3/2/2021 �N► Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: David Maddex Mailing Address: 461 Rolling Road Lexington, NC 27292 Telephone Number: 336/941-7301 Fax Number: E-mail Address: dmaddex@pomonapp.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 4 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Lexington Subdivision name or site address (include phase/lot number): Lot 8, Hidden Hills Directions to site - please include road names and numbers, Landmarks, etc.: 1-85 to Lexington exit for NC Hwy 8, go south on NC Hwy 8, L on Holloway Church Road, L on Rolling Road, property is on the L side of road. Latitude (in decimal degrees) 35.41.0641 Longitude (decimal degrees) 80.14.4082 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Single-family residential community 6. Property size (acres): 0.65 acres 7. Lake/ river/ ocean adjacent to property: High Rock Lake 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 9. Will work be conducted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 240 Sq. Ft. 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 1320 Sq. Ft. 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 8 to 10 trees will be removed in order to complete the stabilization project. - -te 71 Owner/Agent's Signature` [15A NCAC 02H .0502(f)1 Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Full Pond/ Normal Water Level Shoreline Lake (At Full Pond/ Normal Water Level) 1106.10.4 SEE ATTACHED SITE PLAN AND DETAILS UMW WHIM ONO O Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: David Maddex Lot 16, Hidden Hills STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 120 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 10 on NCDEQ Form) Area of Impact = Shoreline Length x Depth* x Slope =120'x1'x2 = 240 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 11 on NCDEQ Form) Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 30 LF of Shoreline = 4 ft. Above Normal Pool Estimate 60 LF of Shoreline = 3 ft. Above Normal Pool Estimate 30 LF of Shoreline = 2 ft. Above Normal Pool Area of Impact = Length x Height x Slope = (3 0' x 4' x 2) + (6 0' x 3' x 2) + (3 0' x 2' x 2) = 240 + 360 + 120 = 720 sq. ft. Impact From Construction Above Shoreline Stabilization - Assume 5 ft. Wide Zone Area of Impact = 120 x 5 ft. = 600 sq. ft. Total Area of Impact Above Normal Pool Level = 1320 sq. ft. 3583 1630415.579,706653,238 CLASS 2 RIP RAP VEGETATION AND EROSION CONTROL FABRIC 1114%. 1.416. els, febl 2 40* 'Nets EROSION CONTROL FABRIC 4111bAlk \<)41111"4114 _ 411411.0 1 EXISTING GRADE TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE LAKE es6i-76-44 FOR: LOCATION: RESERVOIR: DAVID MADDEX LOT 19, HIDDEN HILLS HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: MODERATE RIP RAP STABILIZATION DETAIL { a i' s* i1 � * . i <r' �� *� Rom. d Y - 11 tom•" 3/31/2021 • Rolling Rd - Google Maps Google Maps Rolling Rd High Rock. Marina and Campground ,mo 2794I pnptn Nn0 Pd SI Goggle tole- .1n Map data ©2021 500 ft i i https://www.google.com/maps/place/Rolling+Rd,+Silver+Hill,+NC+27292/@35.682963,-80.2395045,16z/data=!4m5!3m4! 1 s0x8853853aed6570bb:0x3... 1/1