Loading...
HomeMy WebLinkAboutNC0043176_Facility Update_20030401BLACK RIVER WASTE WATER TREATMENT PLANT "WATER" THE GIFT OF LIFE POST OFFICE Box 1065 DUNN, NORTH CAROLINA 28335 April 1, 2003 NCDENR - Fayettville Regional Office Mr. Dale Lopez 225 Green Street — Suite 714 Fayettville, NC 28301— 5043 Reference: Flow Meter Installation Dear Mr. Lopez: This is to inform you that the City of Dunn has completed the installation of a parshall flume with a chart recorder to provide flow proportional sampling at the effluent pumping station for the Black River Wastewater Treatment Plant. The sampler has been in operation for a couple of weeks and seems to be performing well. Sincerely, oseph T. Campbell Public Utilities Director PHONE: (910) 897-5129 FAX: (910) 897-4561 D U N N P W D@ I NTRSTAR. N ET cDiq DQ -- �w �