Loading...
HomeMy WebLinkAboutNC0043176_Lab Certification_20051118November 18, 2005 115 Ms. Donrie Dukes Dunn Black River WWTP Lab. P.O. Box1065 Dunn, NC 28335 Subject: Laboratory Certification Maintenance Inspection Report Dear Ms. Dukes: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality DENR-FRO NOV 2 2 2005. DWQ Your letter, received November 17, 2005 concerning corrective actions for your temperature compensation check on the conductivity meter has been reviewed. The quality control measures taken in reference to the deficiency and/or comment cited in the September 15, 2005 inspection report are acceptable. However, this report does not attempt to comprehensively address all certification requirements prescribed in the North Carolina Administrative Code (15A NCAC 2H .0800), promulgated methods, and applicable Code of Federal Regulations (40 CFR Part 136). It is the responsibility of the certified laboratory to address any." required changes in Wastewater/Groundwater Laboratory Certification application information, and to correct the Laboratory Standard Operating Procedures and the Laboratory Quality Assurance Manual when requirements of the above cited codes are not in compliance. Thank you again for your cooperation during the inspection. Contact us at 919, 733-3908 ex. 241, if you have any questions or need additional information regarding our requirements. Sincerely, Norman L. ood Laboratory Section cc: James W. Meyer Fayetteville Regional Office Laboratory Section 1623 Mail Service Center; Raleigh, NC 27699-1,623 4405 Reedy Creek Road; Raleigh, NC 27607 Phone (919) 733-3908 / FAX (919) 733-6241 / Internet, www.dwglab.org An Equal Opportunity/Affirmative Action Employer— 50%.Recycled/10% Post Consumer Paper NorthCarolina Naturally