HomeMy WebLinkAboutNC0043176_WWTP Annual Performance_200512319108928871 Public Works
05:38:34 p.m.
2006-01 27
2 /3
' m$111111/10‘141M1
standby 4666
flo•ws emergency situations. The flow then pat** lbw z fder%hankied
' — any heavy materials (sand and Organics, etc.). to removed.
goes thru a partial flow meeauditgclettiegoenees.jtopie.ererneeeered and
• . &tropic's -ere taken 24,hoemper.Alay,fiKeplinadaridanalitical cordnll. The
flow goat- then to a dItiertildfl'bOX the thilltiitheittiWbetVitien Weldon blithe
' ..4.1-4.11fidditli tetrAffIblicitet• ' . . ' _.. .. ,.
where diffused alr Is tom tmder. pressure • three. turbln blowers tp.T.. the
....i.,
the aeration !saltine thru a trough at Me Etna eich basin andgoesior it-
" • other diversion bpx where thelow4 ePlIketilikAirtd: le •IiIvIdscl Pfaiwai w
. three 60ft. diameter clarifiers. Thellthv leavtie alanflers'and goes ovitiftef '
..,,,........, ..,..i..;:ft,,,.... ,f.,
•
. • pumping station where 3 5000• are.' ,
'' canto% and pump the findlArdideOgillot a...1/2 milealle•the .. • ,
River where Itis discharge& In the cliirgicetten process, alUdgefir eettfeelOW
where the.
,C1Typf..0, N. WASTEWATER TREATMENT PLANT
" ANNUAL. PENFORMANCEtterUNI"
2005
atiVAtallibittiornemooroorw,,F4ktsvoilko„,
reet010.100t.. Mai wigginagn littfilmeatrifild
Contact Person: MAO=
-I It1 it ..,: rt
•
. ...'. ..:,‘ • :
1.5.i. ' '1 , i 4::::',0c.k,:y1.- • -
i'*ire,9...sli...,, ..xl •*
. Te . , : (14-;=, C'':1".. ,
0 iirittOktilliSiiiitilAigf pRoa‘iilit'"' ; ,fwiltrif.'0,:,;:':icIt'l " ''. -
, ::. ,i:-TfArs : • '.• •
• ThQ CRY 0 Damn/Black Wet Waste 'Weter Treabrent Plant use's the extended
' ' •• aeration Mechanical & biolegiCel Protegees te treat the wastewater entating
the plant. The raw waste water enters the plant through a 30" gravity Sewer
..• ! ,d),.:',44,,j11• 1;-• ' 14 :
. :
. •
Is pulled thiu a DAF (Diffuied Asi tel,; 'Itnis air bu
' polyernard are added te th1CW it is ptenped taw
ditisSIMPOPII Of IS:, „ , , • *Ay, T110;414..4-
•
then pumped to a 000. nb
• umea and hold times are met so as t* ITT all vector requirements. The
• •
sludge' Is then hauled out t trid -applies ta art EPA peonittt
led farm site and applied for fertilization at agronomic rates.
11. PERFORMANCE:
The City of Dunn Waste Water Treatment Plant had no permit violations for
2005.
. NI. Thle 4:31? published In Etily. record loc&l.newapaper: and
DePatiment (910 892.- ..or • Burnett' at the Black
• River Waste Water Treatment-Plantid#11,092.293&•
•
• •:.•
I 'eel* under penalty of law that thle report le complete and accurate to the
best of my kn�wladge 1 further cendy that this report has been made avail-
able to the users or customers of the' netted system and that the users have
been notified ot Its availability.
Billy Addison
Assistant Public Works Director
City of Dunn, NC
1/27, 2006
• ,,.„,...
1