HomeMy WebLinkAboutNCG180016_Updated COC_20210416ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
BRIAN WRENN
Director
Lee Industries Inc.
Eric Lail
PO Box 2147
Hickory NC 28603
NORTH CAROLINA
Environmental Quality
April 16, 2021
Subject: Certificate of Coverage (COC)NCG180016
Lee Industries PLT1
Catawba County
Please see the attached new Certificate of Coverage No. NCG1800163 for coverage
under Stormwater General Permit NCG180000 for this facility. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1
and the Memorandum of Agreement between the state of North Carolina and the
U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently
amended.)
You must print a copy of the new NCG180000 General Permit from our Stormwater
General Permits web page: https://deQ.nc . ov about/divisions/energy-minera I-
lan d-resourc esLndes -stormwater-gps. In addition to the full permit, the print
package on the website includes revised Discharge Monitoring Report (DMR) forms
and Qualitative Monitoring Report Forms.
The General Permit authorizes discharges of stormwater, and it specifies your obligations
with respectto discharge controls, management, monitoring, and record keeping. Please
review the new permit to familiarize yourself with all changes in the reissued permit.
Your facility has six (6) months from receipt of the permit to update your Stormwater
Pollution Prevention Plan (SPPP) to reflect any new permit requirements.
When does electronic DMR (eDMR) reporting start, and does it affect this permit?
If activities atthis facility ever require analytical monitoring, eDMR will affect you.
We are setting up our database with the outfalls that permittees submitted on-line
and permit parameters. Permittees will receive notification when our eDMR
system is ready for permit -holders to register and begin reporting monitoring data
electronically. If you have any questions about the status, please contact Bethany
Georgoulias at (919) 707-3641.
Sincerely, `M
for Brian Wrenn
Director
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
r�oarH cuvour�n �
D"W*^M , f 919,707.9200
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG1800000
CERTIFICATE OF COVERAGE No. NCG180016
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lee Industries Inc.
is hereby authorized to discharge stormwater from a facility located at
Lee Industries PLT1
402 W 25th Street
Newton
Catawba County
to receiving waters designated as Hilderan Creek (Anthony Creek), class C, waters in the
Catawba River Basin, in accordance with the effluent limitations, monitoring requirements,
and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG180000
which can be downloaded by entering "deq.nc.gov/SW-industrial" in the browser window
and navigating to the "NPDES Stormwater General Permits" web page.
This certificate of coverage shall become effective April 16, 2021.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 16th day of April 2021.
for Brian Wrenn
Director, Division of Energy, Mineral and Land Resources
By the Authority of the Environmental Management Commission