6.Buffer Impacts(for DWQ)
If project will impact a protected riparian buffer,then complete the chart below.If yes, then individually list all buffer impacts
MUST
below. If any impacts require mitigation, then you fill out Section D of this form.
.
6a
Jordan
NeuseTar-Pamlico Other:
Project is in which protected basin?CatawbaRandleman
6b.6c.6d.6e.6f.6g.
Buffer impact
number Reason for Buffer Zone 1 impact Zone 2 impact
Permanent (P) impactStream namemitigation (square feet)(square feet)
or Temporary required?
(T)
CD2 (UT to Horsepen
Yes
Road1,4931,028
B1 PT
Creek)
No
CD2 (UT to Horsepen
Yes
Embankment5,2301,925
B2 PT
Creek))
No
Yes
B3 PT
No
6,7232,953
Total buffer impacts
6h.
Less than 150l.f. / 1/3ac.road crossing of stream impact "allowable" without mitigation
6i. Comments:
D.Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Project location, alignment, and footprint have been configured to avoid and minimize impacts to
the maximum extent practicable (see enclosed cover letter).
1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Application of appropriate BMPs and adherence to approved sediment and erosion control
procedures will avoid and minimize construction impacts (see enclosed cover letter).
2.Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.Does the project require Compensatory Mitigation for Yes No
impacts to Waters of the U.S.or Waters of the State?
2b.If yes, mitigation is required by (check all that apply):DWQCorps
Mitigation bank
2c.If yes, which mitigation option will be used for this project? Payment to in-lieu fee program
Permittee Responsible Mitigation
3.Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type Quantity
Page 6 of 10
PCN Form Version 1.3 December 10, 2008 Version
Proposed Limits of Contruction
Proposed 136-l.f.
perennial channel impact
Proposed 2 x 73-l.f. 60" CMP
50' Jordan Water Supply Nutrient Strategy Buffer
30' (Zone 1) impact - 0.15 acres
20' (Zone 2) impact - 0.07 acres
Figure 3.
Project Impacts
02550
Section 404/401 Permit
Feet
Proposed Honda Connector