Loading...
HomeMy WebLinkAbout20121049 Ver 1_Honda PCN revisions_20121127 6.Buffer Impacts(for DWQ) If project will impact a protected riparian buffer,then complete the chart below.If yes, then individually list all buffer impacts MUST below. If any impacts require mitigation, then you fill out Section D of this form. . 6a Jordan NeuseTar-Pamlico Other: Project is in which protected basin?CatawbaRandleman 6b.6c.6d.6e.6f.6g. Buffer impact number Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impactStream namemitigation (square feet)(square feet) or Temporary required? (T) CD2 (UT to Horsepen Yes Road1,4931,028 B1 PT Creek) No CD2 (UT to Horsepen Yes Embankment5,2301,925 B2 PT Creek)) No Yes B3 PT No 6,7232,953 Total buffer impacts 6h. Less than 150l.f. / 1/3ac.road crossing of stream impact "allowable" without mitigation 6i. Comments: D.Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Project location, alignment, and footprint have been configured to avoid and minimize impacts to the maximum extent practicable (see enclosed cover letter). 1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Application of appropriate BMPs and adherence to approved sediment and erosion control procedures will avoid and minimize construction impacts (see enclosed cover letter). 2.Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for Yes No impacts to Waters of the U.S.or Waters of the State? 2b.If yes, mitigation is required by (check all that apply):DWQCorps Mitigation bank 2c.If yes, which mitigation option will be used for this project? Payment to in-lieu fee program Permittee Responsible Mitigation 3.Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 6 of 10 PCN Form Version 1.3 December 10, 2008 Version Proposed Limits of Contruction Proposed 136-l.f. perennial channel impact Proposed 2 x 73-l.f. 60" CMP 50' Jordan Water Supply Nutrient Strategy Buffer 30' (Zone 1) impact - 0.15 acres 20' (Zone 2) impact - 0.07 acres Figure 3. Project Impacts 02550 Section 404/401 Permit Feet Proposed Honda Connector