HomeMy WebLinkAbout20020747 Ver 2_Application Returned_20121119�'•�A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman
Governor Director Secretary
November 19, 2012
DWQ Project # 02 -0747 Ver. 2
Dare County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
7011 1150 0000 4206 5360
Mr. Bob Peele .
N.C. Seafood Industrial Park Authority - Wanchese
Post Office Box 549
Wanchese, NC 27981
Subject Property: Umphlett Marina, N. C. Seafood Industrial Park
Pasquotank River Basin, Broad Creek [PAS 51, 30 -21 -7; SA, HWQ]
REQUEST FOR ADDITIONAL INFORMATION RETURN OF APPLICATION
Dear Mr. Peele:
On October 30, 2012 the Division of Water Quality (DWQ) received your application
dated October 30, 2012, to impact 0.013 acres of open water for the purpose of
constructing a floating dock. The DWQ has determined that your application is
incomplete and/or provided inaccurate information as discussed below. The DWQ will
require additional information in order to process your application to impact protected
waters on the subject property. Since this project was accepted into the Express Review
Program this Office has opted to return your application as incomplete rather than placing
it on Hold. If you want to carry out the proposed impact, you will need to reapply and
provide the following information so that we may review your project.
Additional Information Requested:
During the review process of your application it was discovered that Shellfish Sanitation
and Recreational Water Quality is proposing a closure of shellfish waters as a result of your
proposed project. Under this scenario and in accordance with 15A NCAC 02B .0201
Antidegradation Policy, and 15A NCAC 02H.0506 Review of Applications; this Office
North Carolina Division of Water Quality Intemet www.ncwaterqualitv.org
943 Washington Square Mall Phone: 252- 946 -6481 One
Washington, NC 27889 FAX 252 - 946 -9215 NOl 111Carohn l
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper )WHAJAY
Mr. Bob Peele
Umphlett Marina, N. C. Seafood Industrial Park
Page 2 of 2
cannot permit a project which shall affect water quality and/or remove existing use. It is
therefore necessary that the applicant perform a "Use Attainability Analysis ". The
information supplied by the permittee will then be reviewed and commented on by the
appropriate agencies. Enclosed for your convenience is a copy of the Use Attainability
Analysis form. Upon completion of review, this analysis would be the basis for the permit
decision and future surface water reclassification.
This letter only addresses the application review and does not authorize any impacts to
wetlands, waters or protected buffers. Please be aware that any impacts requested within
your application are not authorized (at this time) by the DWQ. Please call Roberto
Scheller of the Washington Regional Office at 252 -948 -3940 or Karen Higgins of the
Wetland, Buffer, Stormwater, Compliance and Permitting (Webscape).Unit at 919 -807-
6360 if you have any questions regarding or would like to set up a meeting to discuss this
matter.
Sincerely,
6�,Vw ada��
Charles Wakild, P.E.
cc: Raleigh Bland, Corps of Engineers, Washington Field Office
DCM, Doug Huggett, Morehead Office
DCM, David Moye, WaRO
DWQ Webscape Unit
File copy
Filename: 02 -0747 Ver.2