Loading...
HomeMy WebLinkAbout20210596 Ver 1_PreFiling 30-Day Clock Reached Email_20210419Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, April 19, 2021 12:02 AM To: brosov@coastalprotectioneng.com Cc: Tankard, Robert Subject: Pre -Filing Time Clock has been reached for Town of Kitty Hawk Shoreline Protection Project - 20210596 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Town of Kitty Hawk Shoreline Protection Project that you submitted on 3/19/2021. The ID number for that project is 20210596, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210596 Version * 1 Washington Regional Office - (252) 946-6481 Robert Tankard Pre -Filing Meeting Request submitted 3/19/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Brad Rosov brosov@coastalprotectioneng.com Town of Kitty Hawk Shoreline Protection Project Town of Kitty Hawk Dare Owner Address: Street Address 101 Veterans memorial Drive Address Line 2 City State / Rovince / Region Kitty Hawk NC Fbstal / Zip Code Country 27949 USA Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: r 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fJ Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? No. Please give a brief project description below and include location information. * This proposed project was discussed during an interagency scoping meeting held on April 20, 2020. Representatives from DWR were in attendance. The proposed action is a one-time beach nourishment project that would include sand placement along a total of 20,970 feet (3.97 miles) of oceanfront shoreline. The main placement area of the proposes project begins at the nortn town limit (baseline station 0+00) which is approximately 120 feet north of the Kitty Hawk Pier located at the Hilton Garden Inn. The main placement area extends 18,964 feet along the entire length of the Kitty Hawk ocean shoreline ending at approximately the Kitty Hawk/Kill Devil Hills town limits (baseline station 189+00). If the Kitty Hawk project is constructed as a stand-alone project, two taper sections would be included: a 1,000- foot taper on the north end and a 1,006-foot taper on the south end. The north taper would extend into the Town of Southern Shores, terminating at 8 Sea Bass Circle. The south taper would end at E. Helga Street in Kill Devil Hills, which is located at baseline station 199+00. The total fill area below MHW is 5,177,410 square feet (118.86 acres), and the total fill area above MHW is 3,065,462 square feet (70.37 acres), for a total disturbed area of 8,242,872 square feet (189.23 acres). The proposed design template consists of a 60-foot-wide berm at elevation +6 feet NAVD88. A dune with a crest elevation of +18 feet NAVD88 and width of 25 feet will be provided landward of the constructed berm along the entire length of the project by pushing some of the material into a pile. Complete plan view and cross - sectional drawings of the proposed project are provided in Appendix A. Construction of the preferred design along with 5 years of advanced fill would require 1,521,645 cubic yards of fill material obtained from Borrow Area A. Actual volume dredged from the borrow area will likely require up to an additional 20% to account for losses during dredging; therefore, the total estimated dredge volume is 1,825,974 cubic yards. The BOEM lease request for excavating material from within Borrow Area A will include additional volume in the unlikely event a storm eroded the Towns' shoreline prior to the construction of the project. In total, the amount of material that could be excavated from the borrow area would be 2,282,468 cy, or 50% more than the 1,521,645 cy of fill required by the preferred design and advanced fill. Following the construction of the2017 project, an after -dredge survey revealed that Borrow Area A still contained 12,829,500 cy of material, therefore this borrow area contains enough volume for this project along with the other three towns' proposed projects. Depending on several variables, including whether the project is constructed as a stand-alone project, available funding, time or contractor constraints, or any unforeseen limitations, the applicant may build all or a portion of the proposed project. Currently, the adjacent Town of Kill Devil Hills is also seeking permits to allow the construction of a beach project along the Town's entire shoreline. Consequently, there is a possibility both the Kitty Hawk and Kill Devil Hills projects could be constructed concurrently, which would eliminate the need for the south taper of the Kitty Hawk project. Material will be obtained from the borrow area using a hopper dredge, a cutterhead dredge, or a combination of the two. In the case of a cutterhead dredge, sand will be transported from the borrow area to the beach as a slurry via pipeline; use of a hopper dredge would involve transport to a nearshore pump -out location, and subsequent pumping to the beach via pipeline. A sand dike will be constructed on the seaward side of the discharge area. The sand slurry will be discharged behind the temporary dike, and excess water will be directed parallel to the shoreline and around the edge of the dike. Once discharged onto the beach, the material will be shaped and graded using loaders, dozers, and other earth moving cni iinmcnt Please give a couple of dates you are available for a meeting. 3/25/2021 3/26/2021 3/29/2021 3/30/2021 Please attach the documentation you would like to have the meeting about. 2021 KittyHawk_CAMA Major 4.07MB Permit_Forms&Suppinfo.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 3/19/2021