HomeMy WebLinkAbout20210579 Ver 1_PreFiling 30-Day Clock Reached Email_20210417Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, April 17, 2021 12:07 AM
To: adam@wetlandnc.com
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for Pine Reserve - 20210579 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Pine Reserve that
you submitted on 3/17/2021. The ID number for that project is 20210579, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210579
Version *
1
Raleigh Regional Office - (919) 791-4200
Stephanie Goss
Pre -Filing Meeting Request submitted 3/17/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Is this a transportation project?*
Wetland Solutions, LLC Adam Carter
adam@wetlandnc.com
Pine Reserve
Braden Riley
Lee
Street Address
20 Birkdale Way
Address Line 2
City State / Rovince / Region
Pinehurst NC
Fbstal / Zip Code Country
28374 United States
r Yes ( No
Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
r Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Goss Stephenie
Please give a brief project description below and include location information. *
Lee County NW 29 Residential Development Project. Mitigation for
this project is required and NCDMS letter attached Corps permit is
attached. Please see attached supporting Permit and JD packet for
process. Thank you for your time.
Please give a couple of dates you are available for a meeting.
3/17/2021
3/24/2021
3/31/2021
4/7/2021
Please attach the documentation you would like to have the meeting about.
2017NWP29.pdf
47048-EX6.0 STREAM CROSSING
PROFILE.pdf
Center Church Form_JD Request Signed.pdf
Center Church Pre -Construction Notification
PCN_1 _7_2021. pdf
Center
Church_Upland_Datasheets_Atlantic_and_Gu...
Center
Church Wetland Datasheets Atlantic and G...
Center_Church Fig 2 - Wetlands.pdf
Center_Church Fig 2a -
Wetlands_20210106.pdf
Center_Church Fig 2b - Wetlands
Impact_20210106.pdf
Center_Church Fig 3 - Topo.pdf
Center_Church Fig 4 - Soils.pdf
Center_Church Fig 5-NWI.pdf
Center_Church Fig 6 - Flood.pdf
Grading Prelim - Pine Reserve.pdf
ILF-Request-Fillable-Form-June2019.pdf
Parcel 1 info.pdf
Parcel 2 info.pdf
Parcel 3 info.pdf
Pine Reserve Apartments DMS Acceptance
Letter.pdf
SAW-2020-02152 signed NWP
verification_PJD.pdf
Signed Center Church_Agent Authorization
Letter.pdf
Signed Center Church_Pre-Construction
Notification PCN 20201130 (1).pdf
Wetland Exhibit - Pine Reserve.pdf
pdf only
267.66KB
708.39KB
293.57KB
332.32KB
458.97KB
464.41 KB
1.64MB
1.27MB
1.36MB
1.25MB
1.31 MB
1.82MB
802.69KB
537.6KB
534.43KB
171.96KB
203.56KB
226.34KB
363.16KB
3.92MB
115.09KB
337.89KB
292.01 KB
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 3/17/2021