HomeMy WebLinkAbout20161180 Ver 3_PreFiling 30-Day Clock Reached Email_20210418Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, April 18, 2021 12:02 AM
To: khamlin@sageecological.com
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for Hadleigh Subdivision (Formerly Conyers
Tract) - 20161180 Ver 3
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Hadleigh
Subdivision (Formerly Conyers Tract) that you submitted on 3/18/2021. The ID number for that project is 20161180,
Version 3.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
Internal Use only: Non Transportation
i
DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20161180
Version*
3
Raleigh Regional Office - (919) 791-4200
Stephanie Goss
Pre -Filing Meeting Request submitted 3/18/2021
Contact Name * Kim Hamlin
Contact Email Address* khamlin@sageecological.com
Project Name * Hadleigh Subdivision (Formerly Conyers Tract)
Project Owner* LGI Homes NC, LLC
Project County* Franklin
Owner Address: Street Address
1450 Lake Robbins Drive
Address Line 2
Suite 430
City State / Province/ Region
The Woodlands TX
Postal / Zip Code Country
77830 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
17 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
#16-080
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information. *
The Site is currently under construction as a single-family home
development. The sewer line crossings have been constructed as
permitted in the November 30, 2016, and September 10, 2018
submittals. The previously proposed stream crossings are being
eliminated due to construction costs. The proposed permanent
stream crossing impacts originally totaled 129 LF for two stream
crossings. The currently proposed permanent stream impacts total
129 LF for one stream crossing. The currently proposed stream
crossing was requested to reduce the height of the retaining wall to
improve maintenance costs and safety.
A site meeting was held with Mr. James Lastinger of the USACE on
6/21/2016 and PJD was issued on 8/11/2016. A stream and buffer
determination site meeting was held with Ms. Autumn Romanski
(formerly of NCDWR) on 4/8/2016 and with Ms. Stephanie Goss of
NCDWR on 12/1/2016. The buffer determination letters TPRRO# 16-
080 dated 4/18/2016 and 12/2/2016 summarize the determinations.
SAW-2016-01126: A 404 permit was issued on June 26, 2017, for
proposed impacts on the Site and for the offsite sewer line crossings
NCDWR #16-1180: 401 certifications and riparian buffer
authorizations were issued on March 16, 2017, and October 15,
2018, for proposed impacts on the Site and for the offsite sewer line
crossings.
Please give a couple of dates you are available for a meeting.
4/1/2021
4/2/2021
Please attach the documentation you would like to have the meeting about.
NCDWR (TPBRRO #16-396) Buffer
Determination for Hadleigh Sewer Line Corridor 4.73MB
4-18-2016.pdf
401 approval (DWR #20161180 Ver 2) for
131.91 KB
Cedar Creek 20181115.pdf
Hadleigh 401-certification approval (DWR #16-
1.84MB
1180).pdf
Hadleigh 404-verification approval (Action ID
8.65MB
#SAW-2016-01126).pdf
6 - Figure 1 USGS for Conyers Tract.pdf 489.25KB
7 - Conyers Tract Figure 2 Soils.pdf 436.02KB
Cedar Creek ConyersTract DWR #16-080
624.17KB
Buffer Determination 12-2-2016.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 3/18/2021