Loading...
HomeMy WebLinkAbout20161180 Ver 3_PreFiling 30-Day Clock Reached Email_20210418Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, April 18, 2021 12:02 AM To: khamlin@sageecological.com Cc: Goss, Stephanie Subject: Pre -Filing Time Clock has been reached for Hadleigh Subdivision (Formerly Conyers Tract) - 20161180 Ver 3 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Hadleigh Subdivision (Formerly Conyers Tract) that you submitted on 3/18/2021. The ID number for that project is 20161180, Version 3. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20161180 Version* 3 Raleigh Regional Office - (919) 791-4200 Stephanie Goss Pre -Filing Meeting Request submitted 3/18/2021 Contact Name * Kim Hamlin Contact Email Address* khamlin@sageecological.com Project Name * Hadleigh Subdivision (Formerly Conyers Tract) Project Owner* LGI Homes NC, LLC Project County* Franklin Owner Address: Street Address 1450 Lake Robbins Drive Address Line 2 Suite 430 City State / Province/ Region The Woodlands TX Postal / Zip Code Country 77830 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: 17 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* #16-080 Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * The Site is currently under construction as a single-family home development. The sewer line crossings have been constructed as permitted in the November 30, 2016, and September 10, 2018 submittals. The previously proposed stream crossings are being eliminated due to construction costs. The proposed permanent stream crossing impacts originally totaled 129 LF for two stream crossings. The currently proposed permanent stream impacts total 129 LF for one stream crossing. The currently proposed stream crossing was requested to reduce the height of the retaining wall to improve maintenance costs and safety. A site meeting was held with Mr. James Lastinger of the USACE on 6/21/2016 and PJD was issued on 8/11/2016. A stream and buffer determination site meeting was held with Ms. Autumn Romanski (formerly of NCDWR) on 4/8/2016 and with Ms. Stephanie Goss of NCDWR on 12/1/2016. The buffer determination letters TPRRO# 16- 080 dated 4/18/2016 and 12/2/2016 summarize the determinations. SAW-2016-01126: A 404 permit was issued on June 26, 2017, for proposed impacts on the Site and for the offsite sewer line crossings NCDWR #16-1180: 401 certifications and riparian buffer authorizations were issued on March 16, 2017, and October 15, 2018, for proposed impacts on the Site and for the offsite sewer line crossings. Please give a couple of dates you are available for a meeting. 4/1/2021 4/2/2021 Please attach the documentation you would like to have the meeting about. NCDWR (TPBRRO #16-396) Buffer Determination for Hadleigh Sewer Line Corridor 4.73MB 4-18-2016.pdf 401 approval (DWR #20161180 Ver 2) for 131.91 KB Cedar Creek 20181115.pdf Hadleigh 401-certification approval (DWR #16- 1.84MB 1180).pdf Hadleigh 404-verification approval (Action ID 8.65MB #SAW-2016-01126).pdf 6 - Figure 1 USGS for Conyers Tract.pdf 489.25KB 7 - Conyers Tract Figure 2 Soils.pdf 436.02KB Cedar Creek ConyersTract DWR #16-080 624.17KB Buffer Determination 12-2-2016.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 3/18/2021