Loading...
HomeMy WebLinkAbout20210678 Ver 1_Pre-Filing Meeting Information_20210416DWR Pre -Filing Meeting Request Form Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Nancy Oberle nancy.oberle@threeoaksengineering.com Stephen and Sharon Burt Array Subdivision Orange Owner Address:* Street Address 7951 Lake Ross Ln Address Line 2 City State / Rovince / Region Sanford FL Fbstal / Zip Code Country 32771 USA Is this a transportation project?* r Yes c: No Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - I— 401 Water Quality Certification - Reg ula r Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* (' Yes c: No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* The proposed project is the development of the Array Subdivision on parcel PIN 9840435353, an approximately 54 acre property in Chapel Hill, Orange County, NC. The subdivision will be accessed off Orange Grove Road. A road will be built from Orange Grove Road and extend east onto the parcel. The road will cross an unnamed tributary to Collins Creek and an adjacent wetland. The location of the road will determine the location of residential lots. The road and residential lots will impact two wetlands that have been determined to be isolated by the USACE. Please give a couple of dates you are available for a meeting. 4/7/2021 4/14/2021 4/19/2021 4/23/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • !also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * t ,(Yer,e44 Submittal Date 4/1/2021