HomeMy WebLinkAbout20210678 Ver 1_19-018 Rev02 2021-04-12 Details Only Revised_20210416PIN# 9840-33-9815 & 9840-43-9598 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar days after ceasing Timeframe variations land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic Sheeting Permanent Stabilization • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. w �Tt vot •, NORTH CAROLINA ` 1, ::. Environmental Quality SANDBAGS (TYP.) OR STAPLES SILT FENCE CONCRETE WASHOUT "-A CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) ELAN 1:1 SIDE SLOP (TYP. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER HIGH COHESIVE & LOW FILTRATION SOIL BERM 10 MIL PLASTIC LINING 0 SANDBAGS (TYP.) OR STAPLES SECTION A -A NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOUD REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUT SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) PLAN 10 MIL PLASTIC LINING 1:1 SIDE SLOP TYP.) SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM SECTION B-B NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOUD REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. 0 0 Licence #C-2638 0 U LLJ W U 0 • LE 0 2 Lu PHIL KOCH - NCPE #22634 >- co DESCRIPTION w cc 0 0 z 0 LL 2 04/12/2021 DATE: DECEMBER 10, 2020 HORIZONTAL SCALE: N/A VERTICAL SCALE: N/A PROJECT MANAGER: CPK DRAWN BY: SCS PROJECT NO: 19-018 DRAWING NAME: 19-018 DETAILS THIS DRAWING AND THE DESIGN HEREON ARE THE PROPERTY OF EarthCentric Engineering, Inc. THE INFORMATION ON THIS DRAWING IS NOT FOR USE ON ANY OTHER SITE OR PROJECT. THE REPRODUCTION OR OTHER USE OF THIS DRAWING IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF EarthCentric Engineering, Inc., IS PROHIBITED. COPYRIGHT 2021 EarthCentric Engineering, Inc. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SHEET NO. REVISED: 05/17/19 PRELIMINARY P:\19-018\19-018 Drawings\ Working\19-018 Details.dwg, D1.0 NCGO1 Details, 4/14/2021 10:20:15 AM PIN# 9840-33-9815 & 9840-43-9598 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Inspect Frequency (during normal business hours) Inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. 2. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Departments's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(1)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NOR FH CAROLINA Environmental Quality cu Licence #C-2638 E 0 0 0 LLJ a) C.) 0 LE 0 2 w unntuui/iii c[ 6,0 ,,�� LLI Lu p''% z . - CD ES 0 PHIL KOCH - NCPE #22634 >- m DESCRIPTION w cc 0_ 0 0_ z cc 0 2 04/12/2021 DATE: DECEMBER 10, 2020 HORIZONTAL SCALE: N/A VERTICAL SCALE: N/A PROJECT MANAGER: CPK DRAWN BY: SCS PROJECT NO: 19-018 DRAWING NAME: 19-018 DETAILS THIS DRAWING AND THE DESIGN HEREON ARE THE PROPERTY OF EarthCentric Engineering, Inc. THE INFORMATION ON THIS DRAWING IS NOT FOR USE ON ANY OTHER SITE OR PROJECT. THE REPRODUCTION OR OTHER USE OF THIS DRAWING IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF EarthCentric Engineering, Inc., IS PROHIBITED. COPYRIGHT 2021 EarthCentric Engineering, Inc. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 SHEET NO. i@i REVISED: 05/17/19 PRELIMINARY P:\19-018\19-018 Drawings\_Working\19-018 Details.dwg, D1.1 NCGO1 Details, 4/14/2021 10:20:15 AM PIN# 9840-33-9815 & 9840-43-9598 COIR FIBER WATTLE MATTING 2' (MAX . ) MATTING 2 IN. MATTING COIR FIBER WATTLE DETAIL See Inset A O••• 0Q� 5 BACK SLOPE ISOMETRIC VIEW 2' UPSLOPE STAKE CROSS SECTION VEE DITCH 4x . EDGE OF PAVEMENT NATURAL GROUND 2' DOWNSLOPE STAKE 2' UPSLOPE STAKE CROSS SECTION TRAPEZOIDAL DITCH NATURAL GROUND 2' DOWNSLOPE STAKE FLOW PROJECT REFERENCE NO. X-XXXX SHEET NO. EC-2G P,W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER NOTES: USE MINIMUM 12 IN. DIAMETER COIR FIBER (COCONUT FIBER) WATTLE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS. INSET A INSET B TOP VIEW H/2+1' E(2' MIN) 1 I. DESCRIPTION EXISTING GRADE GEOMEMBRANE ! _ SANDBAGS DISTURBED AREA SECTION A -A THE WORK SHALL CONSIST OF INSTALLING A PUMP AROUND WHEN CONSTRUCTION ACTIVITIES TAKE PLACE WITHIN THE STREAM CHANNEL H. MATERIAL SPECIFICATIONS SANDBAGS: SANDBAGS SHALL CONSIST OF MATERIALS WHICH ARE RESISTANT TO ULTRAVIOLET RADIATION, TEARING AND PUNCTURE, AND WOVEN TIGHTLY ENOUGH TO PREVENT LEAKAGE OF FILL MATERIALS (I.E. SAND, FINE GRAVEL, ETC.) III. CONSTRUCTION REQUIREMENTS 1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AS THE FIRST ORDER OF WORK. 2. THE HEIGHT OF THE SANDBAGS SHALL BE AS INDICATED IN SECTION A -A. THE SANDBAGS SHALL BE PLACED ON A SMOOTH PREPARED SURFACE. 3. ALL EXCAVATED MATERIALS SHALL BE DISPOSED OF OUTSIDE THE 100 YEAR FLOOD PLAIN UNLESS APPROVED ON THE PLANS. 4. ALL DEWATERING OF THE CONSTRUCTION AREA SHALL BE PUMPED TO A DEWATERING PUMP DISCHARGE FILTER BAG OR SILT BASIN. 5. THE PUMP SHALL BE OF SUFFICIENT SIZE TO CONVEY NORMAL STREAM FLOW. 6. SEDIMENT CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL ALL DISTURBED AREAS ARE STABILIZED AND THE COUNTY ENGINEERING DEPT APPROVES THEIR REMOVAL. TEMPORARY CREEK PUMP AROUND NTS PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREE IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. L L 10' 0.C. MAX. 1 9L 9L 1 1( 9L 9L L 1 1[ 1L 1L 1 1[ 1 L 1 1 L 1 L 1 1 1 L 1 L L 1 1[ 1L 1L 1 1[ 1 1 1 L 1 L 1 1 1 L 1 L L H 9[ IL IL IL IL I ///\r\ tALPI SAFETY r FENCE-/\ • FLUORESCENT ORANGE FASTEN FENCE TO °-"PERFORATED CHANNELS ON METAL POSTS 1- zo _ J o� w N � TREE PROTECTION FENCE DETAIL NTS AREAS TO BE DISTURBED, 0.5 AC OR LESS SEDIMENT STORAGE FLOOD STORAGE ZONE WETLANDS / FORESTED AREA CLASS B RIPRAP NCDOT #5 OR #57 WASHED STONE MAX. SEDIMENT DEPTH (CLEAN OUT POINT) STONE FILTER OUTLET WITH SEDIMENT STORAGE STEEL POST WIRE FENCE 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE 24" 1 18- 24" c NATURAL GROUND CONSTRUCTION SPECIFICATIONS: MATERIALS STEEL POST 24" WIRE FENCE FILTER FABRIC BACKFILL TRENCH AND COMPACT THOROUGHLY 8" MIN. 4" MIN. UPSLOPE PLASTIC OR WIRE TIES NATURAL GROUND FILTER FABRIC NATURAL GROUND 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFIN OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFIRMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS SHOWN IN PART IN TABLE 6.62B OF THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL PUBLISHED BY NC DEQ_ SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRA VIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OR EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120° F. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.25 LB/LINEAR FT MINIMUM STEEL WITH A MINIMUM LENGTH OF 5'. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OR 6 INCHES. CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FT POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE A MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE DETAIL NC DEQ FIGURE 6.62A / NTS CONSTRUCTION SPECIFICATIONS: 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENTS. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE RE -GRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. MAINTENANCE: IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. COMPACTED SOIL 2' MIN. 11 11 11 6' TYPICAL 18" MIN ON TEMPORARY DIVERSION DITCH NTS 2-3" WASHED STONE COARSE AGGREGATE (6" THICK MINIMUM) CONSTRUCTION ENTRANCE/EXIT CONSTRUCTION SPECIFICATIONS: 1.) CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2.) PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3.) PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4.) USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE THE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. PROJECT INFORMATION PROJECT DESCRIPTION THE PURPOSE OF THE PROJECT IS TO CONSTRUCT A 13 LOT SINGLE-FAMILY HOME SUBDIVISION WITH ASSOCIATED ROADWAY PER ORANGE COUNTY STANDARDS. THE SITE IS LOCATED ON ORANGE GROVE ROAD IN ORANGE COUNTY, NORTH CAROLINA. SITE DESCRIPTION THE SITE IS A LARGE WOODED 55.59 ACRE TRACT, MOSTLY UNDEVELOPED. AN EXISTING POLE BARN IS LOCATED ABOVE AN EXISTING WET POND APPROXIMATELY 400' FROM ORANGE GROVE ROAD WHICH DRAINS TO A LARGE STREAM AND WETLAND AREA DRAINING FROM NORTH TO SOUTH. A SECOND STREAM IS LOCATED ALONG THE EASTERN PROPERTY BOUNDARY ON SITE, AND CONVERGES WITH THE INITIAL STREAM SOUTH OF THE PROPERTY. ADJACENT PROPERTY THE NEIGHBORING PROPERTIES THAT FRONT ORANGE GROVE ROAD ARE DEVELOPED AS SINGLE FAMILY LOTS WITH OTHER ADJACENT PROPERTIES BEING LARGE UNDEVELOPED TRACTS OF LAND. NARRATIVE PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES SEDIMENT FENCE/ SILT FENCE OUTLETS SEDIMENT FENCE WILL BE CONSTRUCTED ALONG THE DOWNSTREAM PERIMETER OF THE SITE. SILT FENCE OUTLETS ARE PROVIDED AT THE LOW POINTS ALONG THE SEDIMENT FENCE LINE OR ARE POSITIONED WITH SILT FENCE CUT-OFFS TO REDUCE FLOWS ALONG THE SILT FENCE. 2. TURBIDITY CURTAIN A TURBIDITY CURTAIN IS PROVIDED BELOW THE PRIMARY DISCHARGES INTO THE EXISTING POND TO PREVENT TRANSPORT OF SEDIMENT THROUGH THE EXISTING POND TO THE STREAM BELOW. 3. TEMPORARY DIVERSIONS TEMPORARY DIVERSIONS ARE PROVIDED ALONG THE EDGES OF FILL SLOPES TO DIRECT SEDIMENT LADEN WATER TO THE SEDIMENT BASINS FOR FILTRATION AND TO PREVENT EROSION OF FILL SLOPES AND PREVENT RUNOFF FROM ENTERING THE UNDERGROUND STORAGE CHAMBERS PRIOR TO STABILIZATION OF PARKING FACILITIES. 4. ROCK INLET PROTECTION ROCK INLET PROTECTION IS PROVIDED AT CULVERTS TO PREVENT SEDIMENTATION OF THE PROPOSED UNDERGROUND STORAGE PIPES. 5. CONSTRUCTION ENTRANCE/EXIT A TEMPORARY CONSTRUCTION ENTRANCE/EXIT WILL BE CONSTRUCTED OFF OF SPRING FOREST DRIVE IN THE LOCATION OF THE PERMANENT ENTRANCE. 6. RIP RAP APRON PERMANENT STABILIZATION WILL BE INSTALLED BELOW PIPE OR FLUME OUTLETS AS INDICATED. 7. SEDIMENT BASINS/TRAPS WHERE RUNOFF COLLECTS AT THE LOW POINTS OF LARGER DRAINAGE AREAS, SEDIMENT TRAPS/BASINS ARE PROVIDED TO FILTER SEDIMENT LADEN RUNOFF PRIOR TO DISCHARGE. CONSTRUCTION SCHEDULE 1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. HOLD PRECONSTRUCTION CONFERENCE PRIOR TO STARTING CONSTRUCTION. 3. CLEAR AS NECESSARY TO INSTALL PERIMETER MEASURES, CONSTRUCTION ENTRANCE/EXIT AND SEDIMENT TRAPS/STONE FILTER OUTLETS WEST OF THE STREAM CROSSING. 4. INSTALL PERIMETER MEASURES, CONSTRUCTION ENTRANCE/EXIT, TURBIDITY CURTAIN AND SEDIMENT TRAPS/STONE FILTER OUTLETS. 5. PUMP OUT AND DREDGE EXISTING POND IN ORDER TO INSTALL NEW CONTROL STRUCTURE, BARREL AND 10' BERM. REMOVE ALL TREES WITHIN 10' OF TOE OF SLOPE AND STABILIZE SLOPE IMMEDIATELY USING MATTING. 6. CLEAR AS NEEDED TO ACCESS STREAM CROSSING AND INSTALL PUMP AROUND SYSTEM. 7. INSTALL STREAM CROSSING. 8. CLEAR AND STRIP REMAINDER OF SITE. 9. ROUGH GRADE PRIVATE ROAD. 10. INSTALL ROAD CULVERTS AT ENTRANCE AND ABOVE POND. 11. UPON COMPLETION OF FILL, STABILIZE BACKSLOPES IMMEDIATELY. 12. GRADE SUBGRADE. 13. INSTALL STONE BASE. 14. FINE GRADE FILL SLOPES AND DITCHES. INSTALL TEMPORARY LINERS AS NOTED. 15. INSTALL PERMANENT APRONS AND STABILIZE ALL REMAINING DISTURBED AREAS. 16. INSPECT ALL EROSION AND SEDIMENT CONTROL PRACTICES WEEKLY AND AFTER RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. 17. AFTER SITE IS STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND INSTALL PERMANENT VEGETATION ON THE DISTURBED AREAS. MAINTENANCE PLAN CHECK ALL EROSION AND SEDIMENT CONTROL PRACTICES FOR STABILITY AND OPERATION FOLLOWING EVERY RAINFALL PRODUCING RUNOFF BUT IN NO CASE LESS THAN ONCE EVERY WEEK. MAKE ANY NEEDED REPAIRS IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. FOLLOW ALL REQUIREMENTS OF NPDES PHASE II PERMIT. 2. REMOVE SEDIMENT FROM BEHIND SILT FENCE OUTLETS AND STONE FILTERS WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. CLEAN OR REPLACE GRAVEL ON OUTLETS WHEN THE WATER POOLS AND IS NO LONGER DRAINING PROPERLY. 3. CLEAN TRAPS WHEN SEDIMENT ACCUMULATES TO WITHIN ONE FOOT OF THE WEIR CREST ELEVATION. CHECK TRAPS FOR EVIDENCE OF BYPASS OR BREACH AFTER EACH RAINFALL AND REPAIR IMMEDIATELY. 4. SEED AND STABILIZE ALL DISTURBED AREAS IN ACCORDANCE WITH STABILIZATION TABLE PRESENTED ON THIS SHEET. NOTE: STRUCTURAL STONE SHALL BE (CLASS "B") STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE SHALL BE #5 OR #57 STONE 1' SEDIMENT CONTROL STONE 2 SILT FENCE 1'-6" MIN. [STRUCTURAL STONE CROSS SECTION 2' AP im►der 40140111,11, • • r• � � � � .� 0 0 0 0 0 0 0 �Q t Ob yt AtatatatatatOdtatatatatatatatatataV . . . .•. . . . . . . . . . : O i L= L L= L= L• L .: TOP VIEW f31-117:::71,..:v.;:irry%, lll_.::=IIE�ljji11III!IL _ N.,.,,Awilp 1'-6" MIN. SILT FENCE OUTLET z CD L) 1 CD P4 O I-� (24 H z cip 0 M--I ^w^ V L o (24 >- m DESCRIPTION 0_ U 0_ Z cc 0 LL 04/12/2021 N DATE: HORIZONTAL SCALE: VERTICAL SCALE: PROJECT MANAGER: DRAWN BY: PROJECT NO: DRAWING NAME: DECEMBER 10, 2020 N/A N/A CPK SCS 19-018 19-018 DETAILS THIS DRAWING AND THE DESIGN HEREON ARE THE PROPERTY OF EarthCentric Engineering, Inc. THE INFORMATION ON THIS DRAWING IS NOT FOR USE ON ANY OTHER SITE OR PROJECT. THE REPRODUCTION OR OTHER USE OF THIS DRAWING IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF EarthCentric Engineering, Inc., IS PROHIBITED. COPYRIGHT 2021 EarthCentric Engineering, Inc. SHEET NO. PRELIMINARY P:\19-018\19-018 Drawings\ Working\19-018 Details.dwg, D2.0 EC Details, 4/14/2021 10:20:18 AM PIN# 9840-33-9815 & 9840-43-9598 FLARED END SECTION -INLET DIAMETER z t - D C B DIAMETER SECTION Z-Z FLARED END SECTION -OUTLET z DIAMETER T DIAMETER + 1" DIAMETER C D L_ B x DIAMETER + 1" r SECTION X-X PIPE DIAMETER WALL THICKNESS SLOPE BCDE WEIGHT 12 2 1/4 3:1 24 49 73 24 730 15 2 1/4 3:1 27 46 73 30 910 18 2 1/2 3:1 27 46 73 36 1 190 21 2 3/4 3:1 36 37 73 42 1370 DIMENSIONS IN INCHES WEIGHT IN POUNDS INLET & OUTLET FLARED END SECTIONS 1/4 IN. TIE ROPE TURBIDITY CURTAIN 3/8 IN. POLYPROPYLENE ROPE FLOATATION TFOLD FOR COMPACT STORAGE DEPTH ACCORD/NG TO NEED (Ilfurq)! G ECONOMY FABRICS AVAILABLE 18 OZ. 300 LB IN. STANDARD NYLON REINFORCED VINYL ALL SEAMS HEAT SEALED (BLOW-UP OF SHACKLE CONNECTION) TYPE I 1/4" CHAIN I„� • �• 1110 �ff�Rr`� TURBIDITY C UR TAIN TYPICAL LAYOUTS: STREAMS, PONDS & LAKES (PROTECTED & NON -TIDAL) STREAM FLOW ANCHOR PT. SHORELINE LIMITS OF CONSTR. ANCHOR PT. ) 100'* TYP. TURBIDITY CURTAIN yA SHORELINE STAKE OR ANCHOR, EVERY 100' (TYPICAL) FILL AREA * THIS DISTANCE IS VARIABLE TIDAL WATERS AND/OR HEAVY WIND & WAVE ACTION FLOOD EBB TYp * SHORELINE ANCHOR PT. * THIS DISTANCE IS VARIABLE EXISTING CAUSEWAY ANCHOR & ANCHOR BUOY BARRIER MOVEMENT DUE TO TIDAL CHANGE FILL AREA PROPOSED TOE OF SLOPE SHORELINE ANCHOR PT. APRON LENGTH APRON WIDTH AT THE OUTLET IS 1.5 TIMES THE WIDTH OF THE F.E.S. RIP -RAP 20% A PLAN VIEW FLARED END SECTION SLOPE OF EXISTING CHANNEL SECTION A -A THERE MUST BE NO OVERALL AT THE END OF THE APRON. z 0 o_ RIP -RAP -MINIMUM DEPTH OF STONE WHEN THE AREA BELOW THE OUTLET IS NOT A DEFINED CHANNEL, BUILD A FLAT APRON TO DISPERSE RUNOFF. FILTER BLANKET SECTION B-B WHERE A DEFINED CHANNEL EXISTS, WRAP AND SHAPE THE APRON TO FIT THE CHANNEL. IF NECESSARY, LINE THE ENTRANCE TO PROVIDE A TRANSITION INTO THE RECEIVING CHANNEL. �'� � ����-��� { ��" �'�' mil•) �•i i0 .41: . .,w���, •mac SECTION B-B INSTRUCTIONS FOR RIP RAP APRON / STONE APRON OUTLET PROTECTION INSTALLATION FILTER BLANKET 1. REFER TO THE PLANS FOR LOCATION, EXTENT, AND SPECIFICATIONS. IF THERE ARE QUESTIONS OR PROBLEMS WITH THE LOCATION, EXTENT, OR METHOD OF INSTALLATION, CONTACT THE ENGINEER, ARCHITECT, OR RESPONSIBLE PERSONNEL ON THE SITE FOR ASSISTANCE. EROSION CONTROL PERSONNEL HAVE COPIES OF INSTRUCTIONS AND MAY HAVE PHOTOGRAPHS OR PROPERLY INSTALLED APRONS AS A AID TO INSTALLATION. IF THE STONE APRON IS NOT INSTALLED CORRECTLY THE FIRST TIME, IT WILL HAVE TO BE REBUILT. 2. DETERMINE THE LOCATION ON THE GROUND TAKING INTO CONSIDERATION: * DECIDE HOW EQUIPMENT AND MATERIAL WILL REACH THE LOCATION TO CONSTRUCT THE APRON. DO NOT "PAINT YOURSELF INTO A CORNER" AND PLACE FILL, STRUCTURES, ETC. THAT COULD BLOCK ACCESS. * THE LOCATION OF THE APRON MUST BE SOLID GROUND. IT MAY BE NECESSARY TO EXCAVATE THE LOCATION TO REMOVE MUD AND THEN BACKFILL WITH GOOD MATERIAL. THIS IS NECESSARY SO THE STONE DOES NOT DISAPPEAR INTO THE MUD, WHICH WOULD REQUIRE MUCH MORE STONE TO COMPLETE THE APRON AND MAKE INSTALLATION DIFFICULT. 3. CLEAR THE LOCATION OF THE APRON. LEAVE AS MUCH OF THE EXISTING VEGETATION AS POSSIBLE AROUND THE LOCATION TO HOLD THE SOIL IN PLACE AND REDUCE THE AREA THAT WILL HAVE TO BE STABILIZED AFTERWARD. 4. EXCAVATE THE BOTTOM TO THE REQUIRED DEPTH TO ACCEPT THE STONE AND THE FILTER BLANKET. WHEN FINISHED, THE BOTTOM OF THE APRON MUST BE LEVEL WITH THE BOTTOM OF THE CHANNEL; THERE CANNOT BE AN OVERALL AT THE END OF THE APRON. 5. PLACE THE FILTER BLANKET, AS SPECIFIED IN THE PLAN, OVER THE LOCATION AND UNDER THE LIP OF THE FLARED END SECTION. 6. PLACE THE SPECIFIED STONE TO THE REQUIRED DIMENSIONS AND SHAPE IT TO THE CONFIGURATION SHOWN IN THE PLAN. 7. STABILIZE THE AREA AROUND THE APRON THAT WAS DISTURBED DURING CONSTRUCTION. USE ADDITIONAL STONE OR VEGETATION, WHICHEVER IS APPROPRIATE FOR THE SITUATION. RIP RAP APRON NTS 4. ���44 i�o� jam:: 111, ooprookom 4I":::': ��j��IIIIIIIII •ors••••• rn 4• ,s;t:o...1;11 toi • • • 1 ANCHOR NETTING IN A 6-INCH TRENCH IN CHANNELS, ROLL OUT STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW AND OVER THE PROTECTIVE MULCH. JOIN STRIPS BY ANCHORING AND OVERLAPPING. INSTALLATION OF NETTING AND MATTING PRODUCTS DESIGNED TO CONTROL EROSION SHOULD BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. ANY MAT OR BLANKET -TYPE PRODUCT USED AS A PROTECTIVE MULCH SHOULD PROVIDE COVER OF AT LEAST 30% OF THE SURFACE WHERE IT IS APPLIED. 1. APPLY LIME, FERTILIZER AND SEED BEFORE LAYING THE NET OR MAT. 2. START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY LOOSELY ON THE SOIL BUT WITHOUT WRINKLES - DO NOT STRETCH. 3. TO SECURE THE NET, BURY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 6 INCHES DEEP, COVER WITH SOIL, AND TAMP FIRMLY. STAPLE THE NET EVERY 12 INCHES ACROSS THE TOP END AND EVERY 3 FEET AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE BY SIDE, THE ADJACENT EDGES SHOULD BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF NETTING SHOULD ALSO BE STAPLED DOWN THE CENTER, EVERY 3 FEET. DO NOT STRETCH THE NET WHEN APPLYING STAPLES. 4. TO JOIN TWO STRIPS, CUT A TRENCH TO ANCHOR THE END OF THE NEW NET. OVERLAP THE END OF THE PREVIOUS ROLL 18 INCHES AND STAPLE EVERY 12 INCHES JUST BELOW THE ANCHOR SLOT. MAINTENANCE INSPECT ALL MULCHES PERIODICALLY, AND AFTER RAINSTORMS TO CHECK FOR RILL EROSION, DISLOCATION, OR FAILURE. WHERE EROSION IS OBSERVED, APPLY ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED, AND REINSTALL MULCH. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. NETS AND MATS PERMANENT SEEDING SCHEDULE: SEEDING MIXTURE: SPECIES TALL FESCUE SERICEA LESPEDEZA KOBE LESPEDEZA RATE (LB/AC) 80 20 10 SEEDING NOTES: 1. AFTER AUGUST 15, USE UN -SCARIFIED SERICEA SEED. 2. WHERE PERIODIC MOWING IS PLANNED OR A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE LESPEDEZA TO 40 LB/ACRE. 3. TO EXTEND SPRING SEEDING DATES INTO JUNE, ADD 15 LB/ACRE HULLED BERMUDA GRASS. HOWEVER, AFTER MID-APRIL IT IS PREFERABLE TO SEED TEMPORARY COVER. NURSE PLANTS: BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OF 15 LB/ACRE SUDAN GRASS. PRIOR TO MAY 1 OR AFTER AUG. 15 ADD 40 LB/ACRE RYE (GRAIN). SEEDING DATES: FALL: LATE WINTER: BEST AUG. 25 - SEPT. 15 FEB. 15 - MAR. 21 POSSIBLE AUG. 20 - OCT. 25 FEB. 1 - APR. 15 FALL IS BEST FOR TALL FESCUE AND LATE WINTER FOR LESPEDEZAS. SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER, EXCEPT, APPLY NO FERTILIZER TO AREAS WITHIN THE NEUSE RIVER RIPARIAN BUFFERS. MULCH: APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. TEMPORARY SEEDING SCHEDULES TABLE 6-10A: TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN, KOREAN IN MOUNTAINS) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES MOUNTAINS - ABOVE 2500 FT: FEB. 15 - MAY 15 BELOW 2500 FT: FEB. 1 - MAY 1 PIEDMONT - JAN. 1 - MAY 1 COASTAL PLAIN - DEC. 1 - APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TABLE 6.10B TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER SEEDING MIXTURE SPECIES GERMAN MILLET RATE (LB/ACRE) 40 IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDAN GRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE. SEEDING DATES MOUNTAINS - MAY 15 - AUG.15 PIEDMONT - MAY 1 - AUG.15 COASTAL PLAIN - APR. 15 - AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TABLE 6.10C TEMPORARY SEEDING RECOMMENDATIONS FOR FALL SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 SEEDING DATES MOUNTAINS - AUG. 15 - DEC 15 COASTAL PLAIN AND PIEDMONT - AUG. 15- DEC. 30 SOIL AMENDMENTS FOLLOW SOIL TESTS OR APPLY 2.000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1.000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REPAIR AND RE -FERTILIZE DAMAGED AREAS IMMEDIATELY. TOP -DRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVER -SEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. STABILIZATION TIME TABLE SITE AREA DESCRIPTION PERIMETER DIKES, SWALES, DITCHES AND SLOPES STABILIZATION TIMEFRAME EXCEPTIONS 7 DAYS NONE HIGH QUALITY WATER (HWQ) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES IF SLOPES ARE 10' IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 14 DAYS 7 DAYS FOR SLOPES > 50' IN LENGTH 14 DAYS NONE, EXCEPT FOR FLATTER THAN 4:1 PERIMETERS & HQW ZONES DESIGN SETTLED TOP OF BERM © CONSTANT GRADE WEIR ELEVATION / TOP OF STORAGE EXISTING GRADE EXCAVATED AREA BOTTOM © CONSTANT GRADE DESIGN SETTLED TOP - CONSTRUCTION SPECIFICATIONS: 12" MIN OF NCDOT #5 OR #57 WASHED STONE MINT CROSS SECTION PLAN VIEW TEMPORARY SEDIMENT TRAP NTS A: DISTANCE BELOW GRADE, TYPICALLY 1.5' MIN. B: DISTANCE ABOVE GRADE, VARIES C: TOTAL DESIGN DEPTH FROM EXISTING GRADE D: INLETS TO TRAP © OR ABOVE WEIR ELEVATION 5' MAX FILTER FABRIC OVERFILL 6" FOR SETTLEMENT NATURAL GROUND EMERGENCY BY-PASS 6" BELOW SETTLED TOP OF DAM 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. CONSTRUCT THE OUTLET SECTION IN THE EMBANKMENT. PROTECT THE CONNECTION BETWEEN THE RIPRAP AND THE SOIL FROM PIPING BY USING FILTER FABRIC OR A KEYWAY CUTOFF TRENCH BETWEEN THE RIPRAP STRUCTURE AND THE SOIL. - PLACE THE FILTER FABRIC BETWEEN THE RIPRAP AND SOIL. EXTEND THE FABRIC ACROSS THE SPILLWAY FOUNDATION AND SIDES TO THE TOP OF THE DAM; OR - EXCAVATE A KEYWAY TRENCH ALONG THE CENTERLINE OF THE SPILLWAY FOUNDATION EXTENDING UP THE SIDES TO THE HEIGHT OF THE DAM. THE TRENCH SHOULD BE AT LEAST 2 FT DEEP AND 2 FT WIDE WITH 1:1 SIDE SLOPES. 4. CLEAR THE POND AREA BELOW THE ELEVATION OF THE CREST OF THE SPILLWAY TO FACILITATE SEDIMENT CLEANOUT. 5. ALL CUT AND FILL SLOPES SHOULD BE 2:1 OR FLATTER. 6. ENSURE THAT THE STONE (DRAINAGE) SECTION OF THE EMBANKMENT HAS A MINIMUM BOTTOM WIDTH OF 3 FT AND MAXIMUM SIDE SLOPES OF 1:1 THAT EXTEND TO THE BOTTOM OF THE SPILLWAY SECTION. 7. CONSTRUCT THE MINIMUM FINISHED STONE SPILLWAY BOTTOM WIDTH, AS SHOWN ON THE PLANS, WITH 2:1 SIDE SLOPES EXTENDING TO THE TOP OF THE OVER FILLED EMBANKMENT. KEEP THE THICKNESS OF THE SIDES OF THE SPILLWAY OUTLET STRUCTURE AT A MINIMUM OF 21 INCHES. THE WEIR MUST BE LEVEL AND CONSTRUCTED TO GRADE TO ASSURE DESIGN CAPACITY. 8. MATERIAL USED IN THE STONE SECTION SHOULD BE A WELL -GRADED MIXTURE OF STONE WITH A D50 SIZE OF 9 INCHES (CLASS B EROSION CONTROL STONE IS RECOMMENDED) AND A MAXIMUM STONE SIZE OF 14 INCHES. THE STONE MAY BE MACHINE PLACED AND THE SMALLER STONES WORKED INTO THE VOIDS OF THE LARGER STONES. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER -RESISTANT. 9. DISCHARGE INLET WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION). 10. ENSURE THAT THE STONE SPILLWAY OUTLET SECTION EXTENDS DOWNSTREAM PAST THE TOE OF THE EMBANKMENT UNTIL STABLE CONDITIONS ARE REACHED AND OUTLET VELOCITY IS ACCEPTABLE FOR THE RECEIVING STREAM. KEEP THE EDGES OF THE STONE OUTLET SECTION FLUSH WITH THE SURROUNDING GROUND, AND SHAPE THE CENTER TO CONFINE THE OUTFLOW STREAM (REFERENCES: OUTLET PROTECTION). 11. DIRECT EMERGENCY BYPASS TO NATURAL, STABLE AREAS. LOCATE BYPASS OUTLETS SO THAT FLOW WILL NOT DAMAGE THE EMBANKMENT. 12. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY AFTER CONSTRUCTION (REFERENCES: SURFACE STABILIZATION). 13. SHOW THE DISTANCE FROM THE TOP OF THE SPILLWAY TO THE SEDIMENT CLEANOUT LEVEL (ONE-HALF THE DESIGN DEPTH) ON THE PLANS AND MARK IT IN THE FIELD. 14. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65, POROUS BAFFLES. MAINTENANCE: INSPECT TEMPORARY SEDIMENT TRAPS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE PART OF THE GRAVEL FACING THAT IS IMPAIRED BY SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE IT IS A MINIMUM OF 1.5 FT BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. AFTER ALL SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY (REFERENCES: SURFACE STABILIZATION). AREAS TO BE DISTURBED (CUT, FILL, ETC.) NOTE: DIMENSIONS ARE MINIMUM ACCEPTABLE UNLESS OTHERWISE NOTED. 0 CLASS B RIP A * INVERT P�PE,g / 'PERSPECTIVE VIEW NO SCALE SEDIMENT STORAGE FLOOD STORAGE ZONE PIPE INVERT RIP RAP HEADWALL, 1' MIN HEIGHT FROM ROAD SHOULDER NATURAL GROUND FLOW CLASS B RIP -RAP NCDOT #5 OR #57 WASHED STONE MAX. SEDIMENT DEPTH(CLEAN OUT POINT) SECTION THRU BASIN, FILTER AND CULVERT PIPE NO SCALE NATURAL GROUND RIP RAP HEADWALL FILTER BERM NCDOT #5 OR #57 WASHED STONE NOTE: GRAVEL & RIP RAP FILTER BERM BASIN DETAIL IS DESIGNED TO PROTECT EXISTING PIPE INVERTS THAT DRAIN 10 ACRES OR LESS. (EXISTING PIPE INVERTS) ROCK PIPE INLET PROTECTION STD. No. 6.55.2 W 0 0 W Licence #C-2638 E O C a) U T � co ; N � � > U CA CA Y Z T T 0 a)(D) (� C a- ) NOUUJCV >- m DESCRIPTION w W o_ U o_ Z cc 0 LL 04/12/2021 N DATE: HORIZONTAL SCALE: VERTICAL SCALE: PROJECT MANAGER: DRAWN BY: PROJECT NO: DRAWING NAME: DECEMBER 10, 2020 N/A N/A CPK SCS 19-018 19-018 DETAILS THIS DRAWING AND THE DESIGN HEREON ARE THE PROPERTY OF EarthCentric Engineering, Inc. THE INFORMATION ON THIS DRAWING IS NOT FOR USE ON ANY OTHER SITE OR PROJECT. THE REPRODUCTION OR OTHER USE OF THIS DRAWING IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF EarthCentric Engineering, Inc., IS PROHIBITED. COPYRIGHT 2021 EarthCentric Engineering, Inc. SHEET NO. P:\19-018\19-018 Drawings\_Working\19-018 Details.dwg, D2.1 EC Details, 4/14/2021 10:20:20 AM PRELIMINARY PIN# 9840-33-9815 & 9840-43-9598 DO NOT WRAP TRUNK; MARK THE NORTH SIDE OF THE TREE IN THE NURSERY AND LOCATE TO THE NORTH IN FIELD. TRUNK FLARE AND TOP OF ROOT BALL SHOULD BE AT GRADE IN WELL DRAINED SOIL, UP TO 4 INCHES (10 CM) ABOVE GRADE IN POORLY DRAINED SOILS. NOTE: WIDTH OF PLANTING HOLE IS 3 TIMES ROOT BALL DIAMETER IN HIGHLY COMPACTED OR CLAY SOIL; 2 TIMES THE ROOT BALL DIAMETER MINIMUM IN ALL OTHERS. DIG WIDE PLANTING HOLE WITH TAPERED SIDES* // /\/\\\\\ /\ CUT BURLAP, ROPE AND WIRE BASKET AWAY FROM TOP AND SIDES OF ROOT BALL. SET BALL ON UNDISTURBED SOIL TO PREVENT SETTLING. *IF PLANTING HOLES ARE DUG WITH A LARGE AUGER, BREAKING DOWN THE SIDES WITH A SHOVEL CAN ELIMINATE GLAZING AND CREATE THE PREFERRED SLOPING SIDE. NOTES: 1. WHERE SEVERAL TREES WILL BE PLANTED CLOSE TOGETHER SUCH THAT THEY WILL LIKELY SHARE ROOT SPACE, TILL IN SOIL AMENDMENTS TO A DEPTH OF 4-6" (10-15 CM) OVER THE ENTIRE AREA. 2. FOR CONTAINER -GROWN TREES, USE FINGERS OR SMALL HAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS CIRCLING THE PERIMETER OF THE CONTAINER. AVOID PURCHASING TREES WITH TWO LEADERS OR REMOVE ONE AT PLANTING. OTHERWISE, DO NOT PRUNE TREE AT PLANTING EXCEPT FOR SPECIFIC STRUCTURAL CORRECTIONS. DO NOT STAKE TREES EXCEPT WHERE SPECIFIED BY LANDSCAPE ARCHITECT. IF STAKING IS NECESSARY, USE TWO OPPOSING STAKES WITH SEPARATE FLEXIBLE TIES. REMOVE STAKING AT END OF FIRST GROWING SEASON. 2" (5 CM) BARK MULCH; DO NOT PLACE MULCH IN CONTACT WITH TREE TRUNK /\\//\\//\//� 4" (10 CM) RAISED RING OF SOIL TO DIRECT WATER INTO ROOT BALL - ESPECIALLY IMPORTANT IF TOP OF ROOT BALL IS RAISED ABOVE GRADE. \/\/\/\//\\ // BEFORE PLANTING, ADD 3-4" (7-10 CM) OF WELL -COMPOSTED LEAVES, RECYCLED YARD WASTE OR OTHER COMPOST AND TILL INTO TOP 6" (15 CM) OF PREPARED SOIL. ADD COMPOST AT 20-35% BY VOLUME TO BACKFILL. EXTEND STAKES INTO UNDISTURBED SOIL 4-6" (10-15 CM) DEEPER THAN ROOT BALL FOR LOWERED PLANTING HOLE AS NEEDED WITH POOR DRAINAGE. PACK BACKFILL SOIL AROUND BASE OF ROOT BALL TO STABILIZE; ALLOW REST OF BACKFILL TO SETTLE NATURALLY, OR TAMP LIGHTLY. TREE PLANTING DETAIL (B & B PLANTS) ADAPTED FROM "ARCHITECTURAL GRAPHIC STANDARDS" 1998 AND WATSON AND HIMELICK "PRINCIPLES AND PRACTICE OF PLANTING TREES AND SHRUBS" 1997. 3. DURING THE DESIGN PHASE, CONFIRM THAT WATER DRAINS OUT OF THE SOIL; USE LOWERED PLANTING HOLE DEPTH AND DESIGN ALTERNATIVE DRAINAGE SYSTEM AS REQUIRED. 4. THOROUGHLY SOAK THE TREE ROOT BALL AND ADJACENT PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH AFTER PLANTING AND REGULARLY THROUGHOUT THE FOLLOWING TWO SUMMERS. 5. THE PLANTING PROCESS IS SIMILAR FOR DECIDUOUS AND EVERGREEN TREES. TREE PLANTING DETAIL NTS 3-4" MULCH GRASS-_\ 6-8 '7z \\�, /\ SOIL MIX \\ "V-DITCH" EDGINGVN ALL BEDLINES 6" MIN. NEW SHRUB SAUCER 5//- SCARIFY SIDES OF ROOT BALL \\\' COMPACTED SOIL MIX SUBGRADE SHRUB PLANTING & BED EDGING \ \ O\S�P�Gc����'� \I NOTE: DISTANCE "X" FROM THE TREE SHALL BE A MINIMUM OF 6 FEET OR 1 FOOT FOR EVERY 1 INCH OF TREE CALIPER, WHICHEVER IS GREATER ROOT PROTECTION ZONE NTS 10-YR ELEV: 565.24 TRASH RACK PRECAST CONCRETE RISER STRUCTURE 1.0' in h 5.0' x 5.0' INV OUT 555.50 TOP OF RISER ELEV: 565.25 100-YR ELEV: 565.46 25-YR ELEV: 565.32 2" ORFICES x 3 SIDES ELEV: 564.51 63 LF 24" RCP @ 5.00% CONCRETE ANTI -FLOTATION BASE - 3000 PSI MINIMUM MUST BE RODDED TO RISER STRUCTURE STORMWATER CONTROL STRUCTURE COMMUNITY GARDEN z / // LET EDGE: 572.38 LINER: STRAW W/NET CLASS A EC STONE 3.75'Lx3.75'W 12"THICK - c 53 LF 15" CMP @ 0.57% SLOPE INV IN: 570.20 INV OUT: 569.90 ED /.: 572 HP: 572.79'� v vy. �_v �-�_,� G GE: 572.08 �� 40 LF 15" CMP )� ALL AREAS ADJ. TO @ 1.00% SLOPE POND SERVE AS -•`INV IN: 569.80 MAINT• CORRIDOR ��� INV OUT: 569.4 P: 572.1 - - - SILT FENCE OUTLET -_ CLASS A EC STONE 5'Lx6.25'W 12"THICK TYPE 1 FLOATING TURBIDITY CURTAIN + + + + +� r'+ + + + + + + + + +-&_ + +� . + +- � + + + + +- +__ + + + + -+ + I + + + + + + + + + + + + + + + + + +-+- -+ +-+ + + + + + + + • + + + + + + + + + +- +- + + + 4 4 + + + + + + + + + + + + + + + + + +-+ - +-+--+ + +_ + + + + + _ + + + + + + + + ++ + + .. + + -+_++ + + + + + + + + ••4.+ ++•-*_+ + + + + + 41 ••_+ + +-+- _+� + +: APPROXIMATE LOCATION OF SEPTIC FIELDS - -- -- i \ \ \ V \v N / V / \ V \ \ \ V A \ •/ / / . \ \ \�� WATTLE , \ \\\C \ �I �>I .. N \__ 'c.c. ^.7�.,,^V-- \ v TEMP. A C. N ^.^1.^. �` DIVERSION � �. ^.,,. %''"I`'Z,r- J I A V \ �. c ���^ ^fi ` ^ -,. ^^•\ \ \ / r .,....\,...,, >, , , \ \ ) . \ \ \ \ \ \ \ L_ S* - \, 20' WIDE STONE FILTER OUTLET W/1800 CO% DRAINAGE AREA: 0.48 AC TOP OF BERM" 547.00 \ BOT OF STORAGE: 544.00 ' v \ SILT FENCE i f A \ SANDBAGS FOR TEMP. 11 CREEK PUMP -AROUND SYSTEM. SEE DETAIL BUFFER IMPACTS: 2,174 SF IN ZONE 1 / LINER: STRAW W/NET_ POND (NON JURISDICTIONAL OPEN WATER) SEE SHEET D3.0 FOR PROPOSED POND IMPROVEMENT ( CONTROL STRUCTURE 5'X5' RISER W/ • • TRASH RACK • RIM: 565.25 v 3X2" ORIFICE, INV: 564.5 INV OUT: 555.50 /- -- �-�__�---\\ -- ��__\�. V \ \ \\\ -�--'- POND AREA \ v 1 - 50 65. / BUFFER IMPACTS/ / 0 0 N :LA;S ECNST\ ONE /- WITHIN 10' OF TOE OF SLOPE / TREES AND WOODY VEGETATION 1/ --SLOPES IMMEDIATELY. REMOVE /v• z REBUILD BERM TO PROVIDE 10' \ WIDTH AT CREST AND STABILIZE , \ \\\\ \\\\\, ,\\ - - - - -]- -_,-_,-]- - E in io 2 2 / .\\LWW. e\N=WW\,, WWUWWW\ • nELEIDEMOODEEN EIDEIDEMEEMEED co co MADE IN THE AVAILABLE MATERIALS: CUSTOM SIZES AVAILABLE AVAILABLE UPON REQUEST WITH: ACCESS PORT ANTI -VORTEX PLATES 11*TRASHRACKS.com 101 IRONWOOD ROAD MIDDLESBORO, KY 40965 PH: (606) 248-5560 FAX: (606) 248-6308 LPK-6060 60"x60" PEAKED ROOF TRASH RACK SIZE ,NG NO 173500 REV. SHEET / 1111101110 CC CO CO IWO a. cip r4' 1:1-1 (24 c',) >- co DESCRIPTION cc cc 0 04/12/2021 DATE: HORIZONTAL SCALE: VERTICAL SCALE: PROJECT MANAGER: DRAWN BY: PROJECT NO: DRAWING NAME: DECEMBER 10, 2020 N/A N/A CPK SCS 19-018 19-018 DETAILS THIS DRAWING AND THE DESIGN HEREON ARE THE PROPERTY OF EarthCentric Engineering, Inc. THE INFORMATION ON THIS DRAWING IS NOT FOR USE ON ANY OTHER SITE OR PROJECT. THE REPRODUCTION OR OTHER USE OF THIS DRAWING IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF EarthCentric Engineering, Inc., IS PROHIBITED. COPYRIGHT 2021 EarthCentric Engineering, Inc. SHEET NO. PRELIMINARY PIN# 9840-33-9815 & 9840-43-9598 BOX CULVERT 42 LF, 5' TALL 8' WIDE Q0.50% SLOPE EMBEDDED 1' BELOW STREAM BED INVERT IN C�? STREAM BED 545.11 STREAM BED BOX CULVERT PROFILE VIEW SCALE 1"=5' 1' HIGH CONC. BAFFLES 13' SPACING 0.C. INVERT OUT STREAM BED 544.90 STREAM BED 2.0' 4.0' 2.0' STREAM BED ELEVATION 1.0' 0 BAFFLE BOX CULVERT CROSS SECTION (FIRST BAFFLE) SCALE 1"=2' 1.0' 4.0' STREAM BED ELEVATION 1.0' BAFFLE 4.0' 0.5' BOX CULVERT CROSS SECTION (ADDITIONAL BAFFLES) SCALE 1"=2' 0 J Lj T /// 0 J Lj //i BOX CULVERT PLAN VIEW SCALE 1"=5' ■ MATERIALS'' Concrete Pipe Division Reinforced Concrete Box Culvert Inside Of R. C. Box Section thru Box Culvert Section thru Box Joint Span (S) Standard Box Culvert Weights (Ibs.) per Foot 3 4 5 6 7 8 9 10 11 12 cp 2 605 905 3 705 1025 1425 1885 2410 4 1155 1575 2060 2600 2800 4880 5700 5 1725 2235 2800 3000 3655 4375 6 2410 3000 3200 3885 4625 5430 6300 7 3200 3400 4105 4875 8 3600 4335 5125 5980 6900 9 4555 5375 10 5625 6530 7500 11 6810 12 8100 Wall (T) 4 5 6 7 8 8 9 10 11 12 Haunch (H) 7 7,8 7,8 7,8,12 8,12 8,12 12 12 12 12 Notes: Box dimensions may vary depending upon equipment availability. 1. Produced to meet ASTM Specifications. 2. Contact a Concrete Pipe Division representative for details not listed on this sheet. 3. Walls, Slabs and Haunches are designed to meet ASTM / AASHTO standards and project specifications. Rinker 013 FLARED END SECTION —INLET DIAMETER DIAMETER z — D C J B FLARED END SECTION —OUTLET DIAMETER 1 — X DIAMETER + 1" DIAMETER SECTION Z—Z — D C r B SECTION X—X PIPE DIAMETER WALL THICKNESS SLOPE BC D E WEIGHT 12 2 1/4 3:1 24 49 73 24 730 15 2 1/4 3:1 27 46 73 30 910 18 2 1/2 3:1 27 46 73 36 1 190 21 2 3/4 3:1 36 37 73 42 1370 DIMENSIONS IN INCHES WEIGHT IN POUNDS X DIAMETER + 1" INLET & OUTLET FLARED END SECTIONS w U D U L w Licenc E 0 U U . --� C a) U T (13 O N LJJ N O �C1 FU >VOY z T T LE o O O (13 C N cts NOUUJ PHIL KOCH - NCPE #22634 >- m DESCRIPTION w cc o_ U o_ z cc 0 LL 04/12/2021 N DATE: DECEMBER 10, 2020 HORIZONTAL SCALE: N/A VERTICAL SCALE: N/A PROJECT MANAGER: CPK DRAWN BY: SCS PROJECT NO: 19-018 DRAWING NAME: 19-018 DETAILS THIS DRAWING AND THE DESIGN HEREON ARE THE PROPERTY OF EarthCentric Engineering, Inc. THE INFORMATION ON THIS DRAWING IS NOT FOR USE ON ANY OTHER SITE OR PROJECT. THE REPRODUCTION OR OTHER USE OF THIS DRAWING IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF EarthCentric Engineering, Inc., IS PROHIBITED. COPYRIGHT 2021 EarthCentric Engineering, Inc. SHEET NO. PRELIMINARY P:\19-018\19-018 Drawings\_Working\19-018 Details.dwg, D3.1 SD Details, 4/14/2021 10:20:29 AM