Loading...
HomeMy WebLinkAboutNCC205067_Notice of Termination_20210416Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 4/16/2021 10:50:12 AM (NOT Submittal) Approve by Morman, Alaina 4/19/2021 5:37:55 PM (NOT Request Review- NCC205067) • The task was assigned to Morman, Alaina. The due date is: April 21, 2021 5:00 PM 4/16/2021 10:50 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC205067 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status May be blank (if not yet billed) Information associated with this permit: Project Name Dan River Dam Decommissionng E&SC Addendum 4 (Express Review) Address 864 South Edgewood Road, Eden, NC County Rockingham Latitude 36.4958 Longitude -79.7220 Permittee Listed Duke Energy Carolinas, LLC Legally Responsible Mehdi Maibodi Individual NC Reference No. NCG01-2020-5067 E&SC Plan ID ROCKI-2017-016 Original NOI 35216 Tracking No. Date COC Issued 11/10/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Termination Request: Reason for F Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * O Mistake or Invalid Coverage r Other Ad d i o n a I Nbre information about the basis of this request, if needed. Explanation Supporting Upload Supporting Docurrentation if applicable. Documentation Mist beFDFformat Project Close-out Information: Final Close-out 4/1/2021 Inspection Approval Project Close-out 04-01-2021 Dan River Decommissioning Closure Approval 248.03KB Inspection Report (ROCKI-2017-016).pdf Documentation Mast be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Mehdi Maibodi Title * General Manager CCP Project Management Organization * Duke Energy Carolinas LLC Date * 04/16/2021 Email for Mehdi.Maibodi@duke-energy.com Confirmation * Contact Telephone* 980-373-6616 NOT Certification eNO1 Dan River Decommissioning Signed.pdf Form Mast be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) Joyce.Dishmon@duke-energy.com Original Permittee CCdonWificationErrails Email Mehdi.Maibodi@duke-energy.com Original Site Contact CCd on Notificaiton Errails Email Joyce.Dishmon@duke-energy.com 30.27KB