Loading...
HomeMy WebLinkAbout20121064 Ver 1_401 Application_20121112i. To Ma /pass 8 Associates Engineering and Planning 1645 East Arlington Blvd Suite D Greenville, NC 27858 Phone(252)756 -1780 Fax(252)756 -2098 email ken @malpassandassociates com web www malpassandassociates com NC DWQ 401NVetlands Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 20 1 2 1 0 6 4 Letter of Transmittal Dam 11/14/12 Attention Description Re Manning Square - Preconstruction Notice Job No P -1078 WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ® See Below Copies Date No Description 5 10/31/12 ❑ Approved As Noted Pre-construction Notificiation Form 1 10/30/12 ❑ Check #8146 NCDENR - Division of Water Quality, $240 00 3 10/22/12 FOR BIDS DUE Manning Square, Sancta Sewer Construction Plans Sheets 1 -3 11" x 17" 2 10/22/12 Manning Square, Sandary Sewer Construction Plans Sheets 1 -3 24" x 36" THESE ARE TRANSMITTED As Checked Below ® For Approval ❑ Approved As Submitted ❑ For Your Use ❑ Approved As Noted ❑ As requested ❑ Returned for corrections ❑ For review and comment ❑ ❑ FOR BIDS DUE REMARKS COPY TO ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US If enclosures are not as noted, kindly notify us at once 10 U12 Hat. 1 ot W o�AAZF oliii�-c 20 12 10 6 4 Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 10 PCN Form — Version 1 3 December 10, 2008 Version Pre - Construction Notification PC Form A. Applicant Information 1 Processing 144 , la Type(s) of approval sought from the Corps ❑Section 404 Permit E] Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1 c Has the NWP or GP number been venfied by the Corps? ® Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) [:1401 Water Quality Certification — Regular ® Non -404 Junsdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? ' For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ® Yes ❑ No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Manning Square 2b County Pitt County 2c Nearest municipality / town Greenville 2d Subdivision name Manning Square 2e NCDOT only, T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed Amanda Manning Gams 3b Deed Book and Page No DB 1399 Page 82 3c Responsible Party (for LLC if applicable) 3d Street address 1802 SW Greenville Boulevard 3e City, state, zip Greenville, NC 27834 DENR - WATER 3f Telephone no (252) 756 -3820 Wimw Bm"c' 3g Fax no 3h Email address gamsamanda @ymail com Page 1 of 10 PCN Form — Version 1 3 December 10, 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ® Agent ❑ Other, specify 4b Name William K Malpass 4c Business name (if applicable) Malpass & Associates 4d Street address 1645 East Arlington Blvd Suite D 4e City, state, zip Greenville, NC 27858 4f Telephone no (252) 756 -1780 4g Fax no (252) 756 -2098 4h Email address ken @malpassandassociates com 5 Agent/Consultant Information (if applicable) 5a Name William K Malpass 5b Business name (if applicable) Malpass & Associates 5c Street address 1645 East Arlington Blvd Suite D 5d City, state, zip Greenville, NC 27858 5e Telephone no (252) 756 -1780 5f Fax no (252) 756 -2098 5g Email address ken @malpassandassociates corn Page 2 of 10 PCN Form — Version 1 3 December 10, 2008 Version B Project Information and Prior Project History 1 Property Identification la Property identification no (tax PIN or parcel ID) 14223 1 b Site coordinates (in decimal degrees) Latitude 35 576309 Longitude - 77 42557 (DD DDDDDD) (-DD DDDDDD) 1 c Property size 12919 acres 2 Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Green Mill Run proposed project 2b Water Quality Classification of nearest receiving water C NSW 2c River basin Tar River 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing wooded area adajcent to proposed stream crossing 3b List the total estimated acreage of all existing wetlands on the property 016 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 30 feet 3d Explain the purpose of the proposed project Construction of a proposed 10" sanitary sewer main 3e Describe the overall project in detail, including the type of equipment to be used Excavator will be usd to clear and excavate the proposed 10" sanitary sewer main Front end loader will be used for rock supply 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments Onsite meeting with Josh Pelletier (9/25/2012) 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ® Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company US Army Corps of Engineers Name (if known) Josh Pelletier Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation September 25, 2012 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 3 of 10 PCN Form — Version 13 December 10, 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ❑ P ® T Excavation ® Yes ❑ No ® Corps ❑ DWQ 016 W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P [:IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 016 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ POT Excavation Unnamed tributary ® PER ❑ INT ® Corps ❑ DWQ g 30 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P [:IT ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tnbutary impacts 30 31 Comments Page 4 of 10 PCN Form — Version 1 3 December 10, 2008 Version 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a ❑ Neuse ® Tar - Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary required? 61 ❑ POT Excavation Unnamed tributary ® Nos 1844 1229 B2 ❑P ❑T ❑Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No 6h Total buffer impacts 1844 1229 61 Comments D Impact Justification and Mitigation 1 Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Project is being constructed within the minimum allowable easement width of 30' 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Utility line will be excavated across stream crossing and backfilled the same day to minimize impacts 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes, which mitigation option will be used for this project? ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete If Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity Page 6 of 10 PCN Form — Version 13 December 10, 2008 Version 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - npanan wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a descnpbon of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 PCN Form — Version 1 3 December 10, 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why Comments Ground will be placed back in ongunal condition No additional ❑ Yes ® No stormwater runoff 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Utility installation only 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan No ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Greenville ❑ Phase II 3b Which of the following locally - implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other N/A 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ® Other N/A 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 13 December 10, 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /stateAocal) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after- the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Sanitary sewer will be routed to Greenville Utdutes Treatment plant by the proposed sanitary sewer main Page 9 of 10 PCN Form — Version 13 December 10, 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would Impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Fema Flood maps William K Malpass Z10 10/31/2012 Applicant/Agents Printed Name A Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 13 December 10, 2008 Version - - - 1174 VICINITY MAP MANNING SQUARE REFERENCE DEED BOOK 1399, PAGE 82, OF THE PITT COUNTY REGISTRY GREENVILLE GREENVILLE TOWNSHIP PITT COUNTY NORTH CAROLINA OWNER: JEAN T. MANNING LIFE ESTATE do MRS. AMANDA GARRIS ADDRESS: 1801 S.W. GREENVILLE BLVD. GREENVILLE, NC 17834 PHONE: (252) 756 -3820 PROJECT NO. P -1078 , DRAWING NO. P1078CON.DGN Langston DESIGNED: WKM APPROVED: WKM DRAWN: WCO DATE: 10/30/12 SCALE: NTS SHEET: 1 OF 1 MALPASS £t ASSOCIATES NC LICENSE NO. C -1289 1645 EAST ARLINGTON BLVD., SUITE D GREENVILLE, NC 17858 (251) 756 -1780 RIPARIAN BUFFER (50' FROM – TOP OF BANK) 4 _-ll i i �- / c;ITyLIMITS��� x�EX. MH i RIM 69.20 NV 56.38 PROPOSED 30' SANITARY SEWER EASEMENT ' 60 LF 10" DUCTILE IRON PIPE i y CITY LIMIT S� 'r STREAM IMPACT MAP MANNING SQUARE REFERENCE DEED BOOK 1399, PAGE 82, OF THE PITT COUNTY REGISTRY GREENVILLE GREENVILLE TOWNSHIP PITT COUNTY NORTH CAROLINA OWNER: JEAN T. MANNING LIFE ESTATE c/o MRS. AMANDA GARRIS ADDRESS: 1802 S.W. GREENVILLE BLVD. GREENVILLE, NC 27834 PHONE: (252) 756.3820 PROJECT NO. P -1078 , DRAWING NO. P1078CON.DGN DESIGNED: WKM APPROVED: WKM DRAWN: WCO t10" SEWER) DATE: 10/30/12 SCALE: 1 - =29 SHEET: 1 OF 1 MALPASS Ft ASSOCIATES NC LICENSE NO. C -1289 1645 EAST ARLINGTON BLVD., SUITE D GREENVILLE, NC 27858 (151) 756 -1780 SOILS MAP MANNING SQUARE REFERENCE DEED BOOK 1399, PAGE 82, OF THE PITT COUNTY REGISTRY GREENVILLE GREENVILLE TOWNSHIP PITT COUNTY NORTH CAROLINA OWNER: JEAN T. MANNING LIFE ESTATE c/o MRS. AMANDA GARRIS ADDRESS: 1802 S.W. GREENVILLE BLVD. GREENVILLE, NC 27834 PHONE: (252) 756 -3820 PROJECT NO. P -1078 , DRAWING NO. P1078CON.DGN DESIGNED: WKM APPROVED: WKM DRAWN: WCO DATE: 1 SCALE: NTS SHEET: 1 OF 1 MALPASS Et ASSOCIATES NC LICENSE NO. C -1289 1645 EAST ARLINGTON BLVD., SUITE D GREENVILLE, NC 27858 (252) 756 -1780 t • / ' ,* • A ?yp; ;''T • • • • •• • • • =�� Vii . • 24 j za z� �-- I I :a SITE � !Chrbtiawlr •..,• � 1 Academy • •. Red O . k : : 'f'' "• �' • - ••• •• •• , • as �� F Frog Levi / 1 7 clk lkrk 1 j {. t s at a GREENVILLE SW USGS QUAD MAP DESIGNED: WKM DATE: 10/30/12 MANNING SQUARE APPROVED: WKM SCALE: NTS REFERENCE DEED BOOK 1399, PAGE 82, DRAWN: WCO SHEET: 1 OF 1 OF THE PITT COUNTY REGISTRY MALPASS Et ASSOCIATES GREENVILLE GREENVILLE TOWNSHIP PITT COUNTY NORTH CAROLINA OWNER: JEAN T. MANNING LIFE ESTATE c/o MRS. AMANDA GARRIS NC LICENSE NO. C -1289 ADDRESS: 1802 S.W. GREENVILLE BLVD. 1645 EAST ARLINGTON BLVD., SUITE D GREENVILLE, NC 27834 GREENVILLE, NC 27858 PHONE: (252) 756 -3820 (252) 756 -1780 PROJECT NO. P -1078 , DRAWING NO. P1078CON.DGN