HomeMy WebLinkAboutNCC201404_NOT Closeout Documents_20210416North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Guilford Project: Mixed Use Development Utility River basin: Yadkin-PeeDee
Person financially responsible: City of High Point - Terry Houk Project #: GUILF-2019-001
Address: P.O. Box 230, High Point, NC 27261
1. Project Location: North Elm Street, High Point
Pictures: No
2. Weather and soil conditions: 70's, Clear, Workable
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Christy Tommerdahl Title: PE
Inspection report: Sent Report Date given/sent: April 09, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released and coverage under
NPDES General Stormwater Permit for Construction Activities is terminated.
Reported by: Kimberly Turney Others present:
Date of inspection: April 07, 2021 Time arriving on site: 3:00 PM Time leaving site: 3:30 PM
Yes