Loading...
HomeMy WebLinkAboutNCC190020_NOT Closeout Documents_20210415ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality December 3, 2020 SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Harrell Acquisitions, LLC Attn: Mr. J. Michael Harrell, Member Manager Post Office Box 688 Ahoskie, North Carolina 27910 Dear Sir: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Bradley West Environmental Specialist (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality ? Division of Energy, Mineral and Land Resources ^� Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 ei:��.se:ii:,-:.,.:,r�'Y\ �252.946.6481 North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Bertie Project: Duck Thru Windsor -US Hwy 13/17 River basin: Roanoke Person financially responsible: Harrell Acquisitions, LLC - J. Michael Harrell, Project #: BERTI-2019-002 Member Manager Address: Post Office Box 688, Ahoskie, NC 27910 1. Project Location: Wayland St, Windsor Pictures: No 2. Weather and soil conditions: Sunny, cool, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: December 3, 2020 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No 10. Comments: additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Bradley West Date of inspection: December 2, 2020 cc: Others present: Time arriving on site: 1:30 PM Time leaving site: 1:40 PM