Loading...
HomeMy WebLinkAboutNC0031836_authorization to construct_20070919City of Statesville A To C No. 031836A02 Issued October 17, 2005 Engineer's Certification I, tt%rc %1 a d E . - , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observperiodicveeire) the construction of the modifications and improvements to the Fourth Creek WWTP, located on Statesville in Iredell County for the City of Statesville, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Two new 20 horsepower RAS pumps rated at 2800 GPM with variable frequency drive and 2 new WAS pumps rated at 1,400 GPM, a new wet well, replacement of weirs and baffles in two (2) existing clarifiers, all related piping, valves, demolition, electrical work, and associated appurtenances, in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Z +,Y -dCielefLRegistration No._ 2 'i s i q Date /ji'1 A7 Send to: Construction Grants & Loans DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 17, 2005 Mr. Joe Hudson, Director of Water Resources City of Statesville P.O. Box 1111 Statesville, North Carolina 28687 SUBJECT: Authorization to Construct A to C No. 031836A02 City of Statesville Fourth Creek WWTP Iredell County Dear Mr. Hudson: A letter of request for Authorization to Construct was received on September 6, 2005, by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 4.0 MGD (permitted flow 6.0 MGD) Fourth Creek Wastewater Treatment Plant, with discharge of treated wastewater into the Fourth Creek in the Yadkin Pee -Dee River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Two new 20 horsepower RAS pumps rated at 2800 GPM with variable frequency drive and 2 new WAS pumps rated at 1,400 GPM, a new wet well, replacement of weirs and baffles in two (2) existing clarifiers, all related piping, valves, demolition, electrical work, and associated appurtenances, in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0031836 issued August 20, 2004, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0031836. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as many nehCarolina NNaturally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Mr. Joe Hudson, Director of Water Resources October 17, 2005 Page 2 be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-4600, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699- 1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T 15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Mr. Joe Hudson, Director of Water Resources October 17, 2005 Page 3 The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. Sincerel lan W. Klimek, P.E. ID:cgm cc: Mike Apke, P.E., McGill Associates, Hickory Iredell County Health Department DWQ Winston-Salem Regional Office, Surface Water Protection Technical Assistance and Certification Unit Daniel Blaisdell, P.E. Point Source Branch, NPDES Program Cecil G. Madden, Jr., P.E. Ishwar Devkota, P.E. A to C File