Loading...
HomeMy WebLinkAboutNC0000175_wasteload allocation_19780915a 4i ASSIMILATIVE CAPACITY EVALUATION LEVEL "B" ANALYSIS SOURCE OF POLLUTION: .1...."4.....yLc A,-.-00 Areawide (208) Planning Area: Abr. .. Facilities (201) Planning Area: 01-,,,t.,„.„.1 /Di � � �S.�l�'�51 �37 SO 0 ::miiimmom MINIM Imo Z00 il..NM t • MOEN 0 70 __ _���/�_imme ao _IMATEM4. __�__� -....1 A Design Flow [msd] A. RECEIVING STREAM Classification: G' %%Z 7/10 Flow (cfs) B. ASSIMILATIVE CAPACITY DATA Water Surface Slope (ft/mi) Stream Velocity (fps) Stream Depth (ft) Elevation @ Discharge Pt. (ft) Drainage Area (sq. mi.) 7/10 Yield (cfsm) Design Temperature (0C) Groundwater Runoff (cfs/mi) Deoxygenation Rate (K1 Base e) Reaeration Rate (K2 Base e) Min. Daily Avg. D.O. (mg/1) Upstream Quality - BODu (m9/1) D.O. (mg/1) C. REQUIRED EFFLUENT LIMITS Design Flow (MGD) BOD5 (mg/1) Ammonia Nitrogen mg/1 Dissolved Oxygen mg/1 Total Suspended Solids Fecal Coliform (WOO ml) pH � (S.U.) T/uar�de.S ,SiRx� C-.41•11) yiat D. COMMENTS (,T ) 1 STATE OF NORTH CAROLINA ORIGINAL FIRST UPDATE Siff ituF !V7 7 644 To e) /1:e 74,7, DEPARTMENT OF NATURAL AND ECONOMIC RESOURCES r PAGE FRE.0G SECOND UPDATE THIRD UPDATE EFFLUENT LIMITS: Limit Based On - Secondary BPCTCA Water Quality M & 0 Limit Specified As - Basin NPDES State Plan Permit Permit Basin NPDES State Plan Permit Permit BOD5 mg/1 TSS mg/1 3 o S d) Coliform (Fecal)/100 mi pH 6 - 7 Temperature °F Flow mgd 3, (o 361/%4 S4 < 414, 0 1 ,TTLi ci / le Schedule of Compliance: Preliminary or 201 Construction Drawings Start Construction Complete Construction Operational Level Basin NPDES State Plan Permit Permit