HomeMy WebLinkAboutNCC200558_Annual Fee NOD Letter_20210419ROY COOPER
G-
DIONNE DEUI-GATTI
Secretory
BRIAN WRENN
nbxror
4/19/2021
East Moore Water District
Attn: Randy Gould
PO Box 1927
Carthage, North Carolina 28327-8665
Subject: Notice of Deficiency- Failure to Pay Annual Fee
Invoice No. NCC200558-2021
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCGO10000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 3/1/2021 and was due on 4/1/2021. The annual fee applies to the following construction site:
East Moore Phase IV
Beulah Hill Church Road, Oldham Road, Murdocksville Road, Esther Road, Bluebird Trail, Bluebird Lane, Talbert Road, Juniper
Lake, Mineral Springs Township, NC
Moore County
Certificate of Coverage No. NCC200558
NC Reference No. NCG01-2020-0558
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov.
Sincerely,
Annette Lucas
Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
�� w dw�rrarq
North Camllina Department of EnAmnmenral Oymll1y I Dlvlslnn of Energy. Mlneral and Land Resources
512NanhSalleburyStnnet 11612Mall SerrkeCenter I RalelgkNorth Carclhia276W-1612
919307.9240