Dear Mr Branch
October 11, 2012
Reference the Department of the Army (DA) permit issued to you on August 14,
2012, which authorized total permanent impacts to 2 17 acres ofjunsdictional wetlands
associated with the Marketplace at Tramway The protect site is located on a 45 -acre tract
located in the southeast quadrant of the intersection of Jefferson Davis Highway (US 1-
15 /501) and Tramway Road (NC Highway 78), in Tramway, southwest of Sanford, Lee
County, North Carolina The geographic coordinates (in decimal degrees) for the site are
35 4368 N and -79 2158 W (NAD83 /WGS84) The protect impacts a wetland that drains
into an unnamed tributary of the Upper Little River in the Cape Fear River (HUC
03030004) The Cape Fear River is a navigable water of the United States
Reference is also made to your letter of September 21, 2012, requesting a
modification to your existing DA permit Specifically, you requested a phased mitigation
concept Phase 1 would involve the filling of 0 77 acre of the east -west lobe of the non-
riparian wetland, including the southern portion of the confluence area as shown on the
attached Wetlands Disturbance Phases Map dated SEPT 2012 Subsequently, Phase 2
involves the filling and necessary compensatory mitigation for the remaining 14 acres of
non -npanan wetlands associated with the development of Marketplace at Tramway
Accordingly, we have completed our evaluation of your request and concur with your
request for phased mitigation on the wetland impacts and Special Condition "e" is hereby
modified as follows
In order to compensate for impacts associated with this permit, mitigation shall
be provided in accordance with the provisions outlined on the most recent version
of the attached Compensatory Mitigation Responsibility Transfer Form The
requirements of this form, including any special conditions listed on this form, are
hereby incorporated as special conditions of this permit authorization
.. �o�=Jv
n"T 15 2012
Y
-2-
Please be reminded that you will need to submit another DA permit modification
prior to beginning any work within the remaining 14 acres ofjunsdictional wetlands
associated with Phase II It is understood that all other conditions of the permit, including
the permit expiration date, remain applicable Should you have questions, contact Mr
Craig Brown, Raleigh Regulatory Field Office at telephone (919) 554 -4884, Extension
35
Sincerely,
Steven A Baker
Colonel, U S Army
District Commander
Attachments
Wetlands Disturbance Phases Map
Compensatory Mitigation Responsibility Transfer Form
Copy Furnished (w /attachments)
Mr Ian McMillan
NC Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27604
Ms Jennifer Burdette
Burdette Land Consulting
10212 Creedmoor Road
Raleigh, NC 27615
r
aa-- D Y
0 HIGHWA GENE COLE BK 1131 PG 679
MwPY� BK1131 PG 679�
1
I1 u u u 1I11 111 1 U U MARY MARCI
PHASE 2 C GIlTINS
DISTURBED AREA BK 962 PG 50
1 4 ac
PHASE 1
DISTURBED AREA
0 77 ac
tea„
TIFFANY A
BL
PC 2005
LAKKY K- ALLEN
5UKVE.YING
P 0 BOX 487
Sanford, North Carolina 27330
Phone (919) 842 -0334
Scala
WETLANDS DISTURBANCE PHASES
MARKETPLACE AT TRAMWAY
1°=107
DRAFTFI�6DAESDODESIGN
Pmt Number
Dater
TRAMWAY, NORTH CAROLINA
2012-06
SEPT2012
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee BA Branch Properties, LLC Action ID SAW- 2011 -01375
Project Name Marketplace at Tramway /Phase 1 County Lee
Instructions to Permittee The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the
transfer of the mitigation responsibility Once the Sponsor has signed this form, it is the Permittee's responsibility to
ensure that to the U S Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed
copy of this form before conducting authorized impacts, unless otherwise specified below If more than one mitigation
Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and /or the mitigation will occur
in more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms
for each Sponsor and /or HUC must be provided to the appropriate mitigation Sponsors
Instructions to Sponsor The Sponsor must verify that the mitigation requirements shown below are available at the
identified site By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee Once the form is signed, the Sponsor must update the
appropriate ledger and provide a copy of the signed form to the Permittee and to the USACE Bank /In -Lieu Fee Program
Manager The Sponsor must also comply with all reporting requirements established in their authorizing instrument
Permitted Impacts and Compensatory Mitigation Requirements
Permitted Impacts Requiring Mitigation* 8 -digit HUC and Basin 03030004, Cape Fear River Basin
Stream Impacts (linear feet)
Wetland Impacts
(acres)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Riverine
Non - nvenne
077
"If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor
Compensatory Mitigation Requirements 8 -digit HUC and Basin 03030005, Cape Fear River Basin
Stream Mitigation (credits)
Wetland Mitigation
(credits)
Warm
Cool
Cold
Riparian
Riparian
Non - Riparian
Coastal
Rivenne
Non - nvenne
154
Mitigation Site Debited Barra Farms Phase II Wetland Mitigation Bank
(List the name of the bank to be debited For umbrella banks, also list the specific site For NCEEP, list NCEEP If the NCEEP
acceptance letter identifies a specific site, also list the specific site to be debited)
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown I also verify that released credits (and /or advance credits for NCEEP), as approved by the USACE, are
currently available at the mitigation site identified above Further, I understand that if the Sponsor fads to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements
Mitigation Sponsor Name
Name of Sponsor's Authorized Representative
Signature of Sponsor's Authorized Representative Date of Signature
Page 1 of 2 Form Updated 18 September, 2012
USACE Wilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Condrtions for Transfer of Compensatory Mitigation Credit
u Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee Is no longer responsible for providing the mitigation identified in this form, though the Permlttee remains
responsible for any other mitigation requirements stated in the permit conditions
0 Construction within jurisdictional areas authorized by the permit Identified on page one of this form can begin only
after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has
accepted responsibility for providing the mitigation requirements listed herein For authorized Impacts conducted by
the North Carolina Department of Transportation ( NCDOT), construction within jurisdictional areas may proceed upon
permit Issuance, however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of
permit Issuance NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming
that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein
> Signed copies of this document must be retained by the Permlttee, Mitigation Sponsor, and in the USACE
administrative records for both the permit and the Bank /ILF Instrument It is the Permittee's responsibility to ensure
that the USACE Project Manager (address below) Is provided with a signed copy of this form
If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina
Interagency Review Team (NCIRT) If approved, higher mitigation ratios may be applied, as per current District
guidance and a new version of this form must be completed and included in the USACE administrative records for both
the permit and the Bank /ILF Instrument
Comments /Additional Conditions
1 The impacts and mitigation to iurisdlctional wetlands covered by this Compensatory Mitigation Transfer Form are
for Phase 1 of construction at the Marketplace at Tramway site Please be reminded that you will need to submit
another DA permit modification prior to beginning any work within the remaining 14 acres of jurisdictional
wetlands associated with Phase II
This form Is not valid unless signed by the mitigation Sponsor and USACE Project Manager For questions regarding this
form or any of the conditions of the permit authorization, contact the Project Manager at the address below
USACE Project Manager Craig Brown
USACE Field Office Raleigh Regulatory Field Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email craig J brown @usace army mil
Craig Brown _ October 11, 2012
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, Including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (Including stream temperature and wetland groupings) is
available at http / /ribits usace army mil
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at http / /regulatory usacesurvev com/ to complete the survey online
Digitally signed by
BROWN CRAIGJ 1222766806
o =U S Government,
'9
U
ou
ou =DoDDoD, ou =PKI, ou =USA,
cn =BROWN CRAIG) 1222766806
Date 2012 10 11 08 24 29 - 04'00'
Craig Brown _ October 11, 2012
USACE Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, Including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (Including stream temperature and wetland groupings) is
available at http / /ribits usace army mil
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at http / /regulatory usacesurvev com/ to complete the survey online