Loading...
HomeMy WebLinkAbout20061804 Ver 4_Triage Comments_20121106DWQ# Triage Comment Sheet 0�- 180clV q Triaged By- Reviewer 1 Llkv V Reviewer 2 a l Reviewer 3 \n (L Date: 10-3/-2012 Date: Date: Issue Project Reviewer 1 ,8' Reviewer 2 ❑ Reviewer 3 Issue with Conditions ❑ Reviewer 1 Reviewer 2 Reviewer 3 More Information ❑ Reviewer 1 ❑ Reviewer 2 ❑ Reviewer 3 Return Application ❑ Reviewer 1 ❑ Reviewer 2 ❑ Reviewer 3 PLEASE PRINT CLEARLY S \SWP -Non Point Source \Shared for Wetlands (Archdaleffriage Forms \Triage Issue Sheet-2012 doc Lucas, Annette From: Lucas, Annette Sent: Tuesday, November 06, 2012 12 56 PM To: Higgins, Karen Cc: Lucas, Annette Subject: 06- 1804v4 Flowers Plantation Peachtree Ph 2 - DIFFUSE FLOW CONDITION Attachments: 06- 1804v4 Flowers Plantation Peachtree Ph 2 - DIFFUSE FLOW CONDITION docx Karen, This looks fine to me — the diffuse flow condition is attached. Thanks, A Annette M. Lucas, PE Environmental Engineer NCDENR I DWQ I Wetlands and Stormwater Branch 1650 Mail Service Center, Raleigh, NC 27699 -1650 (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location & Parcels) Phone: (919) 807 -6381 1 Fax: (919) 807 -6494 1 Email: Annette Luca§gncdenr gov Website http:// portal.ncdenr.org/web /wci/swp/ws /401 `A Before printing this email, please consider your budget and the environment. E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 06- 18044 Flowers Plantation Peachtree Ph 2 - DIFFUSE FLOW CONDITION AML comments November 6, 2012 1. Diffuse Flow Plan Approval The diffuse flow plan approved by this office consists of 4 level spreader and vegetated filter strip(s) and all associated stormwater conveyances, the grading and drainage patterns depicted on plan sheets dated June 27, 2012. No changes to the level spreader - vegetated filter strip (LS -VFS) shall be made without written authorization from DWQ. The diffuse flow devices shall have maintenance access and at least a 10 -foot drainage easement on each side to allow for the ability to maintain the structures, and to perform corrective actions. The stormwater easements shall be recorded to provide protection of the structures from potential alterations by future property owners. The approved diffuse flow must be maintained in perpetuity in accordance with the LS -VFS operation and maintenance (O & M) agreements signed by Patricia Hanchette (Vice President) on September 7, 2012. The O & M agreements must transfer with the sale of the property or transfer of ownership /responsibility for the BMP facilities. DWQ must be notified promptly of every transfer.