Loading...
HomeMy WebLinkAbout20120496 Ver 1_More Info Received_20121108Beverly Eaves Perdue Governor MEMORANDUM r,A LVE-6w; I� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Braxton C. Davis Director TO: Doug Huggett Permits Section FROM: Jason Dai Field Rep a tative, Wilmington THRU: Debra Wilson C) / District Manager, Wilmington DATE: September 13, 2012 SUBJECT: Permit Modification Request CAMA Major Permit No. 85 -12 Mike Padgett, Onslow County Dee Freeman Secretary Mr. Mike Padgett is requesting a minor modification of State Permit No. 85 -12, which was issued on July 25, 2012, for construction of a docking facility and bulkhead at 1015 1" StreetJn Surf City, Onslow County CAMA Major Permit No. 85 -12 is scheduled to expire on December 31, 2015. Mr. Padgett is requesting that the permit be modified to allow for construction of a boat basin (dug out of high ground), reconfiguration of the docking facility to include the construction of a 12' x 18' uncovered platform, 14' x 26' boathouse (with lift beneath), an additional 10' x 12' lift and 3' x 16' catwalk around the uncovered lift. Lastly, the applicant is requesting approval to re -align the bulkhead to conform with the basin design. U As proposed, the high ground basin would be dug along the northern side of the property approximately 6' from the common property line of Mr. Padgett and Mrs. Lee. The basin would be cut approximately 11' back into high ground and would measure approximately 14' in width, dredged to a depth of -2' below the Normal Low Water (NLW) level. The high ground surrounding the basin, and the remaining shoreline, would be stabilized by a vinyl bulkhead, which has already received approval under CAMA Major Permit #85 -12. Excavated material, taken from the basin, would be staged on -site and used to backfill the bulkhead. Following excavation of the basin, the applicant would install a 14' x 26' boat house, partially within the footprint of the basin. In addition to the proposed boat basin and boat house, the applicant proposes to reconfigure the permitted docking facility. As proposed, a 12' x 18' uncovered platform would be constructed side -to the proposed bulkhead near the center of the shoreline. A 5' x 10' access pier would extend- from - the - proposed..-.-. ---- deck (along the northern side) to a 3' x 16' catwalk. The catwalk would extend out be nd'the(liropbsed,l.0' x 12' boatlift, allowing access to the outer side of the boatlift. 400 Commerce Ave, Morehead City, NC 28557 - -3421 Phone: 252 - 808 -28081 FAX 252 - 247 -3330 Internet www.nccoastalmanaaement.net An Equal Opportunity \ Aarmative Action Employer Mr. Mike Padgett Page Two September 13, 2012 Currently, the applicant has 55 linear feet of shoreline which is not enough to allow for the construction of a boat house. However, if a permit modification is granted (for construction of a boat basin created from high ground) the applicant would have approximately 77 linear feet of shoreline, thus allowing for the construction of a boat house. The waterbody in which this activity is being proposed, is approximately 117' in width Therefore, the applicant may extend approximately 29.5' into the waterbody. As proposed, the applicant has requested approval to extend approximately 25' into the waterbody which is less than what would be allowed under current Rule. The applicant has received waivers from both adjacent riparian property owners allowing encroachment into the 15' riparian corridor setback. As indicated on the work plan drawing, the proposed bulkhead re- alignment (approximately 77') would not impact any wetlands. The agent has submitted a money order (MO #323123788) in the amount of $100 00 for the modification request. This Office has no objection to the permit modification request. Enclosures Cc- COE -Dave Timpy DWQ -Chad Coburn DMF -Jessi Baker Page: 2 W It rho I 3 76 - 59 7,)- S'() .(f (,1�, 1 J/hebve I a 15 v G e /Z 119- 1'-- , d_- i i E �A 7° r•,• ., DPRIAN CHAD ICINiES, PE ENGINEERING SERVICES A. m SS t1 SCALE `<< _ 20 MR. MI" YA ky"11aa PLAN SHEFT To u', olr S,¢v: CITY BEG�A OF B o taCri E t� �S° � t- teilhN D C pX io5 s�� � - - AtteA t IZEALX GNtAWT i y of goL -tAMD govt: ° L� -k Ap � lo`x Ilv� puC1L t X_ CAr1A1.. 57,,t ZI ` vIANCaldi� c N (a) Ptuaos i � y v' BeATUFT � ` r L Er10 Qi 9e LI�E+�^eTR Cs° of 6vLvAE�4D -1-7 GAAA L �x,s•r,.�6 ��'� Le E AL � 1 KIME - Q; D BY: DA" CHAD S, PE � •� R �\ \� f ea`; s'. , PREPE 104 NEWTON ROAD pAMPSTEAD ' NC 28443 '7 r 910 - 470 -4494 and G1S, ttin only and not a survey• Measurements were made in the field, Existing Surveys, * * * This is a plan sheet for perms g It 17 �, M ''OU aS Er, aQ;aCC:'11 IDM-n Dt 3 ,' LC J' 0 -!CT r ?J1 7,!! srazemenr -a-: ileen ob-i ao>njartiontc to ')-CUCSe M'se TO-IM's a-•, 5 Me ne actmig, an an atnmornizes agemv- C-r. beii—e-if a".._ ^3:::. -az 7 a ;a tz --21,gv )-- F- 60 - It—zr or Road" I-SLOA11-11 ChLl T� and - Ui OA/J�Lo adi ac - n _0 Zile aoCN-1-referenea p e in,6- idu a i ap p i !iz Z�e art zrioposmq �euar- zw -j "fro, :.:-;:V-, ro :C, UNS nFoor"Saii. v f C —1-liaz -12 leing -arc-posed, pleaze tHe- Dnvisii V E.: 12- L) - - LL 'S 01 d J, o tic,: ;P.E. : <ccnf u an 7 tj Z, 01� I ni t I l ��q� rt ri IU ll �11 ca Ltf oIC N p 05 kk- r) N 11J 17J 17, In f .0 Id to 00 ILI 0 ri X.) al eD J1 I ni t I l ��q� rt ri IU ll �11 ca Ltf ot t�1 In k. el • 9) ri f ill oIC N p 11J 17J In .0 Id to 00 ILI 0 1Z X.) al eD ot t�1 In k. el • 9) ri f ill oIC ot t�1 In k. el • 9) ri f ill ,1 .* -- ,``'' . ,. ^'> u,e: .. r� . • .... r• .• ,- , <y.� ., l :� �C "V r } �/ F �w -, -- ._ =r - -- -. �- '� kr ' °; . • i L. _�:._ _ /�� J\ � � { -fir iN i.),•.1_e_C' .' rift :�_•'1 U_ ..l) +-t llll i'�L: i f lJi ��;1 tL r_,,cava : :on and'or E.',ng pursuant t > Ni;)S 11 9 l Issued to 14iilcE Pad-eit. 420 South Marine Blvd., Jacksonville, NC 25540 Authorizing development in Onslow County adj. to man -made canal, at 1015 1S` Street, in Surf City as requested in the permittee's application dated 4, 27/12. in 1) Iing he attached workplan drawing (2), both dated 4/27/12 This permit, issued on July 25.2012 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action, or may cause the permit to be null and void. A Y Y 4 `s •r Shoreline Stabilization 1) The authorized bulkhead shall adhere to the alignment depicted on the attached workplan drawing. 2) The aligmnent of the authorized bulkhead shall be staked by the permittee and approved by a representative of tl;e Division of Coastal Management within a maximum of 30 days prior to the start of any construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions shall require the alignment to be restaked by the pennittee and re- approved by DCM within a maximum of 30 days prior to the new expected start of construction. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons Nviihin twenty (20) days of the issuing crate. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department nersonnel when the project is inspected for compliance s Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2015 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. .-, Bra "t Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee