Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20121029 Ver 1_CAMA Application_20121108
ALF�� AA 20 12 102 9 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Braxton C. Davis Dee Freeman Governor Director Secretary MEMORANDUM TO: Ms. Cyndi Karoly Env. Biological Supervisor Division of Water Quality Wetlands Unit FROM: Doug Huggett Respond to Doug Huggett Major Permits Processing Coordinator Morehead City Office Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 7 November 2012 SUBJECT: CAMA Application Review APPLICANT: Mr. Ernest Floyd Foster, Fosters Seafood PROJECT LOCATION: Project site is located off SR 1727 at 220 Loop Road adjacent Wrights Creek in the Community of Pamlico Beach near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to construct a 12'x 20' boat ramp in a man-made canal, a 5' x 165' dock around the perimeter of a man made basin attached to a proposed 5' x 70' pier into Wrights Creek, the applicant also proposes to construct a 14' x 24' ice room on uplands near the Community of Pamlico Beach near Belhaven, Beaufort County, North Carolina. Please indicate below your position or viewpoint on the proposed project and return this form by 27 November 2012. Please contact Steve Trowell at 252- 948 -3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. Signed This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Date 943 Washington Square Mall, Washington, NC 27889 Phone. 252 - 946 -6481 1 FAX: 252 - 948 -0478 Internet. www nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer 3 V 666$r � F�` ....y� ,.; yet a pppp l Y, f. �J F.i Cl 2 V i Ohe FN R _ � NorthCarolina !4�wate-' Brana, X i DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 20 12 10 2 9 APPLICANTS NAME: Mr. Ernest Floyd Foster 2. LOCATION OF PROJECT SITE: Project site is an active wholesale seafood business known as Fosters Seafood located off SR 1727 at 220 Loop Road adjacent Wrights Creek in the community of Pamlico Beach near Belhaven in Beaufort County, North Carolina. Photo Index- 2006:108 -8485; D -9 2000:108-1261;C-8 1995:108 -1140; C -18 State Plane Coordinates - X: 2,715,200 Y: 614,450 Pamlico Beach Quad. (lower left corner) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 14, 19 September 2012 Was Applicant Present - Yes, Yes 5. PROCESSING PROCEDURE: Application Received - 26 October 2012 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP - Limited Transition (B) AEC(s) Involved: PTA, PTS (D) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - Septic Tank and Drainfield Planned - N/A (F)Type of Structures: Existing - Residence, Fishhouse Building, Dock, Pier and Bulkhead Planned - A 5' x 165' dock, a 5' x 70' pier, a 12' x 20' boat ramp and a 14' x 24' ice room. (G) Estimated Annual Rate of Erosion: Unknown HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non - Vegetated Wetlands 240 ft2 (Canal Boat Ram370 p) ft-(Shaded Wrights ( Wrights Creek/Canal/Basin Creek) Bottom) 825 ftz (Shaded Basin Bottom) (C) Other 336 ft2 (Ice Room) (Upland) 240 ft2 (concrete approach boat ramp) 0 `g (D) Total Area Disturbed: 1,991 ft2 (0.05 acres) (E) Primary Nursery Area: No (F) Water Classification: SA; HQW, NSW Open: No FliTI/ 7;8 2012 DENR - r,r� guALITy �P_flmnriG a re_ _. _ PROJECT SUMMARY: Applicant proposes to construct a 12' x 20,' boat ramp in a man made canal, a 5' x 165' dock around the perimeter of a man made basin attached to a proposed 5' x 70' pier into Wrights Creek. The applicant also proposes to construct a 14' x 24' ice room on uplands. Ernest Floyd Foster Fosters Seafood Wrights Creek Beaufort County Project Setting The 1.5 acre project site is developed as the wholesale commercial fishhouse and a residence located off SR 1727 at 220 Loop Road adjacent Wrights Creek in the community of Pamlico Beach near Belhaven in Beaufort County, North Carolina. The project site is three lots, two of which are developed as the wholesale commercial fishhouse. This mixed land use (residence /commercial fishing operation) is common in this part of the Pamlico Beach area with many properties owned by families participating or with a history of participating in commercial fishing. The site has 826' of shoreline with the west side bordered by a man made canal, the south side bordered by Wrights Creek and the east side bordered by a man made basin off Wrights Creek. The lots developed as the wholesale commercial fishhouse are characterized by a 50' x 100' block building that houses the seafood processing operation. Vehicles traffic down either side of the block building to access commercial fishing boats moored in the canal, Wrights Creek and basin. Vegetation is sparse in this area due to this traffic and resulting ground compaction and associated gravel. The adjacent lot to the east of the fishhouse is the lot with the residence and man made basin. The area around the man made basin does not have any gravel and is vegetated with upland grasses that are regularly mowed. The residential lot is less developed with impervious surface and is vegetated with maintained lawn grasses and various hardwood trees mainly loblolly pines. There is an area of Coastal Wetland marsh on the east side of the man made basin on this lot. The marsh is vegetated with Juncus roemerianus, S ap rtina a� tens and Distichlis s ip cata. The man made canal is ±20' wide x ±200'long and terminates into a ±45' x ±50' basin. The property line between the applicant and the adjacent property owner to the west (C.W.Foster) is located on the western bank of the canal. The canal bank is stabilized with a bulkhead on both sides. Some of the tie backs have broken causing the bulkhead to lean into the canal. Small 25' long or less commercial fishing boats tie "side to" the bulkhead in the canal. An 8' wide concrete walkway runs along the landward edge of the bulkhead along the canal then turns to the east and follows the bulkhead along Wrights Creek terminating when it reaches the man made basin. There is a 14' wide x 60' long shelter constructed over the concrete walkway along Wrights Creek. This area serves as a loading/unloading area for both large and small vessels. There is an existing, 5' x 48' pier with a 5' x 20' L -head platform constructed into Wrights Creek. Larger trawl boats tie side to the aforementioned small platform and pier. Water depths in Wrights Creek in the riparian area of the fishhouse are deep ( -9' below NWL) consistent with those found in the Federal Channel in Wrights Creek. The Federal channel extends from the Creek mouth beyond the project site for another 0.20 mile. The Federal Channel Setback Line offshore the project site ranges from 57' on the west side of the property to 100' on the east side from the normal water level (NWL). The project site is located in a turn of the Creek. Vessels navigating in this part of Wrights Creek are predominately commercial fishing vessels ranging in size from small outboard powered center consoles to large deep draft steel hull trawlers. The man made basin has a depth of -9' at the opening to Wrights Creek. The Ernest Floyd Foster Beaufort County Page Two basin has a depth of -6' in the center then shallows to 3'at the landward end. There is a shallow shoal in Wrights Creek on the east side of the basin. Project Description The applicant proposes to improve the site as a harbor of refuge for commercial fishing boats by undertaking dock/pier construction to increase available mooring and a 12' x 20' boat ramp for launching and retrieving small outboard powered commercial fishing vessels. The boat ramp is to be pile supported ,12' wide x 20' long, constructed waterward of the existing bulkhead with a 12' x 20' long concrete slab poured landward of the bulkhead. The proposed boat ramp is to be located at the head of the man made canal. The applicant proposes to extend the existing 5' x 20' L -head platform on the existing pier in Wrights Creek another 20' for a final dimension of 5' x 40'. The applicant proposes to construct a 5' wide x 165' long dock from the existing covered dock around the perimeter of the man made basin to a new 5' wide 70' long pier into Wrights Creek. The new pier will fall short of the Federal Channel Setback by 30'. A 14' wide x 24' long ice room is proposed to be constructed between the covered dock and the block building. Anticipated Impacts The boat ramp construction will shade /fill 240 ft' of canal bottom. The enlargement of the existing L -head platform and new pier construction will shade 370 ft' of Wrights Creek bottom. The new dock around the perimeter of the man made basin will shade 825 ft' of basin bottom. The ice room construction will disturb 336 ft' of uplands. The boat ramp construction will impact 240 ft2 of uplands. The project proposal may increase commercial fishing boat traffic in the area and their associated impacts. Steve Trowell - Washington Regional Office - 5 November 2012 4 Iva rra u rc tL, A c m I . f Ale. Ce) r7 r h rayd ��s AAl app �er C, re do Scme refjai' worKgtg Im pto ve fie it is r� 1oca-fz-,J a-t :1 la � o Rio el c �Q sty sea - � op - , Q x�v��� ,�c/ , k �� �s � r�s s /,s lc,4 A boat rd M/0 W&5t ccrnee o yvty kaftd Q t die heaA c� cc,la / coh s : 7�r'n � } ! °fi t by t ions 0 cill e A4 c h �_CL11 e by bcv4 rs of r e_ pa, r ex 5 (7n A b u (k 601 e t? t o E iL C-54 � %� � �r� �- l�c�l�y r'��(aC'�ti 3 .br�K�tt ��'1 �'n�5 Q►rc� f lu In Lei- s'Gt i" � � � ' bu(kk d T� p���- � lr'n ys �(my Srde a����S,d� o-F � , b ro ke h p ; l r n � S alld 7^,o i`eh d e�C,`s t' ►'rig }� r C o� :rA 6 L, e rtp r�- roat4d 7-48 Imal -7Nade cce f-oh ttie e- Qsfs =cue 4:1 xr-if 1,ct7J lizi c exisfr'ic� covet-ed �eLK to- 165--Pf 'Around c4 7"x s-41-wt' re b e foee,,L s;de e) f` keathdwalk LV\ 6t .501tI 49P(/ dI' we- `j'vA b acs fA © j� to EP_ fibe ve 11-"o 71'e- up bea- ` s V_ east K 'Ac-ce s!�- 7a) b5a fS, 7`e but' (4 ec koem 1'1,( rn i' �t l L/ - 5hVllm' e7a --s, 72 few e d,'�� � `I c Lee 1) Kea d Dom mr -1 WFLICATION for major Development ftrmlt (last revised 12127106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant / Loodow ner lt*rr»attQn - - Business Name Spa f-eod Project Name (d applicable) Applicant 1: First Name rIj es MI Flo .d Last Name l= o s he � Applicant 2- First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address V� o �6 © f � 60d Mailing Address PO Box City bet hallelt State ; f r ZIP 8 l (9 Country 1z 5 Phone No. p� °offs " 7(J - a � I ( ext. FAX No. - - Street Address (f different from above) FAX No. City State ZIP Email City -2, i Agent%C+oh"o or lrif9rmallon Business Name c rT✓ Agent/ Contractor 1 First Name MI Last Name Agent/ Contractor 2• First Name MI Last Name Mailing Address PO Box City State ZIP Phone No 1 - - ext Phone No 2 - - ext FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> 2'1.2- 8013 -2808 -.- .. wvvw.nccoistaimariagement.net Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit Pr40d Locadon = County (can be multiple) Street Address r State Rudy# 01 c�i dQ i Subdivision Name City / Sttjate� Zip (� Phone No. % Lot No. (s) (if many, attach additional page with list) Lot oL - / b L ext 3 , ! f S+ a In which NC river basin is the project located? b Name of body of water nearest to proposed project a r Pamli W r,i1 ht 5 C leee h c Is the water body identified in (b) above, natural or manmade? Wlatural [Manmade ❑Unknown d Name the closest major water body to the proposed project site. pu ff" r- i Is the proposed project consistent with the applicable zoning? f1 q D tle e Is proposed work within city limits or planning jurisdiction? f If applicable, Ht the planning jurisdiction or city limit the proposed []Yes 934o work falls within. 4. Site 'bescdpSon - a Total length of shoreline on the tract (ft) b. Size of entire tract (sq.ft ) c. Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) 3 f (If many lot sizes, please attach additional page with Oist ❑NHW or QfIWL e Vegetation on tract �'.r.a$� W 11 Tf e e- 5 f Man -made features and uses now on tract, IC Uar1`vus StL'rira pe �4ifl�Ih�S_ Q�i��� -�4'�e Ch��jS��rS%��,5�(iiltq�7JOYS irS' d -5e(if g Identify and describe the existing land uses adiacent to the proposed project site e fx S mi h , Comm(, Yc i a V 5.5e /s T'e -L4 17tH t2g h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? (Attach zoning compfance certificate, if applicable) []Yes; []No ;NA j Is the proposed activity part of an urban waterfront redevelopment proposals ❑Yes k Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes 93No ❑NA If yes, by whom? I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes No ❑NA National Register listed or eligible property? <Form continues on next page> Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? D&Yes ONO O(Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? (Yes ONO (Attach documentation, if available) n. Describe existing wastewater treatment facilities —r–,Y Z1 s f1 ),l j Septic Ta h K 4-- Q srnck1 d fe V to 1 n b e 1 J o. Describe existing drinking water supply source. 6e . o rt Ca u K fy W10 he6^ p. Describe existing storm water management or treatment systems. A/P/ N. a. Will the project be for commercial, public, or private use? M,Commercial ❑Public(Govemment ❑Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. �?�. �� s �' r� i urr -,)& ade ath n?irei'ft! wholesc�l�', oa f sec -,foo d ; Fee d id ingy► cis Lve(C 2,s prrovj n ackag e, -zeu c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. ir/ep d N iv e r J Lt) QSh 6 Lv K pu m 10 c�- A" r 4L So 0a e 0 d. List all development activities you propose. LQ�Q j�_ DDGt�C� pl',L'rt' /�/C% hC�ev /OttE:% J?M -tJRa Ihp e. Are the proposed activities maintenance of an existing project, new work, or both? ,1 otA f. What is the approximate total disturbed land area resulting from the proposed project? q.Ft or OAcres J -^ � g. Will the proposed project encroach on any public easement, public accessway or other area OYes ENO ONA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state Su��ac e �kn --of-f i. Will wastewater or stormwater be discharged into a wetland? ❑Yes JKNo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? OYes ❑No CONA j Is there any mitigation proposed? OYes 14No ❑NA If yes, attach a mitigation proposal <Form continues on back> 252- 808 -2808 .. 1- 888- 4RCOAST :. www.nccoastalmanagement.net 0 Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Adeft ionat InfoMado» t , In addlBon to this completed eppllcahkin form. (Mfkf) the foffov V items below, Neppllcabhr, must be submftted lit older for p ba be Complete. /tams (� ele always sppGlCab� to srhr mordstrehi'pmeirt epplirattora McBSe dorrsfrltt!tib'eppltf` . ' _ ` ' instrwWri booW on hoW to property prepare the mquhW items below a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e. The appropriate application fee Check or money order made payable to DENR. 4�4 f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Naine: " t, (: (.�, !3 S j Phone -'N$. ANie&. r 1p ��:o ge c� � IJ � Name CA f' f7' S r-4- tL9/ / 1'h S Phone No. AddressU5 Loop RA, OeJ h. p7810 Neilte _ Phone No• g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. i. A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N C.G.S 113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act % C>ion•atrd�rnitlsstor� -'to Errr'on>d � - "- - . - . . • I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date /C -- /%— �IC Print Name orb C,oTI%� Signature Please indicate application attachments pertaining to your proposed project. JODCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts Jj!rDCM MP -3 Upland Development ObCM MP-4 Structures Information C Form DCM MP-2 EXCAVATION -and FILL (Except for bridges and culverts) Attach this form to Joint Application for LAMA Major Permit, Form ON MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental Information. Describe below the purpose of proposed dxcavatlon and/or rill activities. All values should be given In feet. Length vVidth 4vg. Existing 7epth :Inal Project ]epth Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groln Rock (excluding Breakwater shoreline NWL stabilization ao' NA NA r 3 NA NA t. EXCAVATION OThis section not applicable i. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. (1) Does the area to be excavated include coastal wetlands /marsh (CW), submerged-aquatic vegetation ($AV), shell bottom (SS), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. OCW OSAV " OSS OWL ❑None (ii) Describe the purpose of the excavation in'these areas: d. High - ground excavation in cubic yards. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable Location of disposal area. b. Dimensions of disposal area. (1) Oo you claim title to disposal area? Oyes ONO ONA (ii) If no, attach a letter'granting permission from the owner. (1) Does the disposal area include any coastal wetlands /marsh (CW ), submerged aquatic vegetation (SAV), shell bottom (SB). or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. OCW OSAV OSS OWL ❑None (ii) Describe the purpose of disposal in these areas: d. (1) Will a disposal area be available for future maintenance? ❑Yes ONo ONA (ii) If yes, where? f. (1) Does the disposal include any area in the water? ❑Yes ONo ONA (ii) If yes, how much water area is affected? U u 3---Ct 7; 3..SHORELINE STABILIZATION _ This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: b. Lanath. ❑bulkhead ❑Riprap ❑Breakwater /Sill ❑0ther: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill'lo be placed below water level. Bulkhead backfill Riprap Breakwater /Sill Other I. Source of fill material. Width: d. Maximum distance waterward of NHW or NWL: f. (1) Has there been shoreline erosion during preceding 12 months? []Yes ❑No ❑NA (li) If yes, state amount of erosion and source of erosion amount Information. h. Type of fill material. 4. OTHER FILL ACTIVITIES [A This section not applicable (Excluding Shoreline Stabilization) a. (i) Will rill material be brought to the site? ❑Yes ❑No If yes, (it) Amount of material to be placed in the water (ill) Dimensions of fill area (Iv) Purpose of fill b. (1) Will fill material be placed In coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. OCW ❑SAV ❑SB OWL []None (11) Describe the purpose of the fill in these areas: 15. GENERAL I a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? / backhoe. or hydraulic dredge)? Il 64�kl� Jo dr; Form DCM MP -3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures b. Number of lots or parcels. proposed. Z- 1y'x 9,y' 1(e Ri!70#21 c. Density (give the number of residential units and the units per acre). e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land- disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? []Yes ;No ❑NA (ii) If yes, list the date submitted: d Size of area to be graded, filled, or disturbed including roads, ditches, etc. I Ll I. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. a ir, �[?GZ t co rh gat �'"Pd .ce" I a-rri''tt y e uAer- Ashe -maen lyad.�ahlEj g. Give the percentage of the tract within the coastal shoreline AEC to h. be covered by impervious and/or built -upon surfaces, such as pavement, budding, rooftops, or to be used for vehicular driveways or par king. 41V2 i{/E'Lc� 1H1�JC�t^(/jcft5 �i,cUc[� i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. A/0 A fto IIMrl�a ^��a(�L Describe proposed method of sewage disposal Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes Wo ❑NA (ii) If yes, list the date submitted: k Have the facilities described in Item (Q received state or local approval? ❑Yes KNo ❑NA If yes, attach appropriate documentation I Describe location and type of proposed discharges to waters of the M. state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). Does the proposed project include an innovative stormwater design? []Yes &o ❑NA If yes, attach appropriate documentation. ,t s _Er- Wt f" m Describe proposed drinking water supply source (e g, well, community, public system, etc.) o When was the lot(s) platted and recorded? lq(OL Date Project Name Applicant Name Applicant-Signature n (i) Will water be impounded? ❑Yes [HNo ❑NA (ii) If yes, how many acres? p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes OgNo ❑NA V Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -i. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: RCommercial OPubliclGovernment OPnvate/Community c. (i) Dock(s) and/or pier(s) (ii) Number (iii) Length 7,o (iv) Width! (v) Floating []Yes ®No e. (1) Are Platforms included? OYes ONo If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ONo Note: Roofed areas are calculated from dilpline dimensions. g. (i) Number of slips proposed (ii) Number of slips existing i. Check the proposed type of siting: O Land cut and access channel OOpen water, dredging for basin and /or channel Ropen water, no dredging required ❑Other; please describe: k- Typical boat length: 3 m. (1) Will the facility have tie pilings? CYes IgNo -5 "d a "re) YLnoal %ie (ii) If yes number of tie pilings? I ❑This section not applicable b. (i) Will the facility be open to the general public? Pates ONo d. (i) Are Finger Piers included? f4Yes ONo If yes: (ID Number (iiQ Length A° k (iv) Width 5-1 (v) Floating ❑Yes ®No f. (i) Are Boatlifts included? []Yes ONo If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. O Full service, including travel lift and /or rail, repair or maintenance service Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: [� Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). 16 16 3 0' C h-a b 13oat s qS we j as"' too©den d; Steel /Ath T- ha+4)levs Z� So; - 1 (1) Will the facility be open to the general public? ®.Yes ONo 0 2. DOCKING FACILITY /MARINA OPERATIONS Whis section not applicable a Check each of the following sanitary facilities that will be included in the proposed project. C1 Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b Describe treatment type and disposal location for all sanitary wastewater. c Describe the disposal of solid waste, fish offal and trash. d How will overboard discharge of sewage from boats be controlled? e. (I) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of " Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. 1. Give the location of fuel- handling facilities, and describe the safety measures planned to protect area water quality. I. What will be the marina policy on overnight and live- aboard dockage? k Describe design measures that promote boat basin flushing? 1 If this project is an expansion of an existing marina, what types of services are currently provided? m Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No 0 Form OCA4 MPA - 's*uCtures Pne 3 of4 n. is the marina /docking facility proposed within or adjacent to any shellfish harvesting area? []Yes Vlo o. Is the marina/docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? []Yes JWNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) IrThis section not applicable I a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Govemment ❑Private/Community (ii) Number (iii) Length (Iv) Width Note: Roofed areas are calculated from dripline dimensions. 14. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) 00 This section not applicable I a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g_, wood, sheetpile, etc.) W his. section-not applicable a• Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS Whis section not applicable a. Is the structure(s): ❑Commercial ❑Public/Govemment ❑Private /Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. D o ta✓� h stretA wt f K i h 1 5t, �i /00 f f Up cF Qt-on 3 fife Vil Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body e. (i) Will navigational aids be required as a result of the project? ❑Yes oNo ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL 18. OTHER JgThis section not applicable a. Give complete description: Date V Project Name Etn N , � /= o S ts"r_ Applicant Name Applicant Signature