HomeMy WebLinkAbout20140554 Ver 2_PreFiling Acknowledgement Email_20210413Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, April 13, 2021 7:35 AM
To: bzarzecki@sandec.com
Cc: Trone, Rick V
Subject: Pre -Filing Meeting Request Acknowledgement - Hinton Oaks Industrial Park (East) -
20140554 Ver 2
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Hinton Oaks
Industrial Park (East) that you submitted on 4/9/2021. The ID number for that project is 20140554, Version 2.
Reviewer Contact Information:
Reviewer: Rick Trone
Email: rick.trone@ncdenr.gov
Reviewing Office: Raleigh Regional Office - (919) 791-4200
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been
reached and you are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
For internal use only: Non Transportation
1
WR Pre -Filing Meeting Request Form
ID#*
Regional Office *
Reviewer List*
20140554
Version *
2
Raleigh Regional Office - (919) 791-4200
Rick Trone
Pre -Filing Meeting Request submitted 4/9/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Bob Zarzecki
bzarzecki@sandec.com
Hinton Oaks Industrial Park (East)
Wake Stone Property Company (Attn: Bose Bratton, Director of Real
Estate)
Project County* Wake
Owner Address: Street Address
PO Box 190
Address Line 2
City State / Bovine / Region
Knightdale NC
Fbstal / Zip Code Country
27545 USA
Is this a transportation project?* ( Yes (' No
Type(s) of approval sought from the DWR:
I� 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
Yes c No
Please list all existing project ID's associated with this projects.*
DWR#14-0554
Do you know the name of the staff member you would like to request a meeting with?
Stephanie Goss
Please give a brief project description below and include location information.*
Proposed warehouse building and associated infrastructure, east of
the existing Hinton Oaks Boulevard, requesting 0.0322 acres of
permanent wetland lot fill. Mitigation will be provided. We do not have
any questions, don't feel the need to hold a pre -filing meeting, and
are ready to submit the application pending DWR approval to do so.
Please give a couple of dates you are available for a meeting.
4/12/2021
4/13/2021
Please attach the documentation you would like to have the meeting about.
Hinton Oaks Industrial Park (East)_Impact
829.94KB
Maps.pdf
Hinton Oaks Industrial Park (East)_DWR
1.06MB
RRO19-222 (reduced).pdf
Hinton Oaks Industrial Park (East)_USACE
3.13MB
Email Verification of PJD_07-31-2019.pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date
4/9/2021