Loading...
HomeMy WebLinkAboutWQ0018126_Regional Office Historical File Pre 2018PPP' State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director March 27, 2000 CARL L. FARMER, MAYOR TOWN OF HARRISBURG POST OFFICE BOX 100 HARRISBURG, NC 28075 NCDENR NORTH CAROLINA DEPARTMENT OF E NVUR ON MENT AND NAttfRALI,,attotiatzces Y YlrlYYY Subject: Permit No, WQ0018126 Town of Harrisburg Coventry Subdivision Wastewater Collection System Cabarru.s County Dear Mr. Parmer: In accordance with your application received March 6, 2000, attached is .Permit. No. WQ0018126, dated March 27, 2000, to the Town of Harrisburg for the construction and operation of the subject wastewater collection extension. This permit shall be effective from the date of issuance until rescinded and you shall be subject to the conditions and limitations as specified in the North Carolina Gravity Sewer Design Criteria adopted February 1.2, 1996 and the attached permit. In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the construction and operation of approximately 6,808 linear feet of 8-inch gravity sewer to serve 137 three -bedroom houses as part of the Coventry Subdivision project, and the discharge of 49,3.20 GPD of collected domestic wastewater into the Water & Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received March 6, 2000, and in conformity with the North Carolina Gravity Sewer Design Criteria. The sewage and wastewater collected by this system shall be treated in the Water & Sewer Authority of Cabarru.s County Wastewater Treatment Facility (NPDES Permit No. NC0036269) prior to being discharged into the receiving stream. This permit shall become voidable unless the agreement between the Town of Harrisburg and Water & Sewer Authority of Cabarrus County for the collection and final treatment of wastewater is in full force and effect. if any parts, requirements, or limitations contained in this permit: are .unacceptable, you have the. right to request an a.djudicatory hearing upon written request within thirty (30) days following receipt of this pemiit. This request must be in the form of a written petition, conforming to Chapter .150B of North 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919) 715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Carolina General Statutes, and filed with the Office of Adm nistrative Hearings, 6'714 Mail Service Center, Raleigh, NC .99-71, Unless such demands are made this permit shall be finial and binding. The issuance of this permit does not preclude the Perrnmee from corn.plir g with any and all statutes, rules, regulations, or ordinances which may be imposed by other guvert ra ent agencies (local, state, and federal) which have jurisdiction, if you need additional inforrrtation, concethis rriatter, please contact stitr ligue, a (919)733-5083 extension 524, Since cc: Cabarrus County Health Department Mooresville Regional Office, Water Qual ESP Associates en ° T es ens ectatti NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES' RALEIGH GRAVITY SEWER COLLECTION SYSTEMS PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilitiesare constructed in accordance with the conditions of the Division of Water Quality Gravity Sewer Design Criteria adopted February 12, 1996. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data, 3. The facilities must be properly maintained and operated at all times. 4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there .is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality (Division) accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State, 6. Upon completion of construction and prior to operation of this permitted facility, a certification and a copy of the record drawings (i.e., as constructed plans) must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the Division of Water Quality Gravity Sewer Design Criteria adopted February 12, 1996, and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed.. A copy of the record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification.. Mail the Certification and one (1) copy of the "Record Drawings" to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 7. A copy of the Record Drawings shall be maintained on file by the Perrnittee for a minimum of five years from the date of the completion of construction. Failure to abide by the conditions and lirnitations contained in this general sewer peiitiit or the North Carolina Gravity Sewer Design Criteria may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statute 143-215..6A to 143-215.6C. 1 ch In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater collection I ft Noncompliance Notification: The Permittee shall report by telephone to the 'Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc,; or b. Any failure of a sever line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Pet -sons reporting such occurrences by telephone shall also file a written report in letter fon» within five (5) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Permit issued this thiwentysseventh day of March,2000 NORTH CAROLINA -, NMENTAL MAN &(JEMFNT COMMISSION ken T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Cornmissicm Permit Number 11:00018126 Permit No. WQ0018126 March 27, 2000 ENGINEER'S CERTIFICATION Partial as a duly registered. Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, •full time) the construction of the project, for the Project Arame Location and tor: Permittee hereby states that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, the certificate of coverage, the North Carolina Gravity Sewer Minimum Design Manual, and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: The above Engineer's Certification must be completed and submitted to the address below with one (1) copy of the "Record. Drawings" (i.e., as-constmcted plans) of the wastewater collection system. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and the ,.Record Drawings" plans have been submitted. Any wastewater flow made tributary to the wastewater collection system prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. NORTH CAROLINA DIVISION OF WATER QUAL WATER QUALITY SECTION NON -DISCHARGE PERMMITTING UNIT 1.617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA .276.99-1617 T