HomeMy WebLinkAboutWQ0018126_Regional Office Historical File Pre 2018PPP'
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Kerr T. Stevens, Director
March 27, 2000
CARL L. FARMER, MAYOR
TOWN OF HARRISBURG
POST OFFICE BOX 100
HARRISBURG, NC 28075
NCDENR
NORTH CAROLINA DEPARTMENT OF
E NVUR ON MENT AND NAttfRALI,,attotiatzces
Y YlrlYYY
Subject: Permit No, WQ0018126
Town of Harrisburg
Coventry Subdivision
Wastewater Collection System
Cabarru.s County
Dear Mr. Parmer:
In accordance with your application received March 6, 2000, attached is .Permit. No.
WQ0018126, dated March 27, 2000, to the Town of Harrisburg for the construction and operation of the
subject wastewater collection extension.
This permit shall be effective from the date of issuance until rescinded and you shall be subject
to the conditions and limitations as specified in the North Carolina Gravity Sewer Design Criteria
adopted February 1.2, 1996 and the attached permit.
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted
for the construction and operation of approximately 6,808 linear feet of 8-inch gravity sewer to serve
137 three -bedroom houses as part of the Coventry Subdivision project, and the discharge of 49,3.20
GPD of collected domestic wastewater into the Water & Sewer Authority of Cabarrus County's existing
sewerage system, pursuant to the application received March 6, 2000, and in conformity with the North
Carolina Gravity Sewer Design Criteria.
The sewage and wastewater collected by this system shall be treated in the Water & Sewer
Authority of Cabarru.s County Wastewater Treatment Facility (NPDES Permit No. NC0036269) prior to
being discharged into the receiving stream.
This permit shall become voidable unless the agreement between the Town of Harrisburg and
Water & Sewer Authority of Cabarrus County for the collection and final treatment of wastewater is in
full force and effect.
if any parts, requirements, or limitations contained in this permit: are .unacceptable, you have the.
right to request an a.djudicatory hearing upon written request within thirty (30) days following receipt of
this pemiit. This request must be in the form of a written petition, conforming to Chapter .150B of North
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919) 715-6048
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
Carolina General Statutes, and filed with the Office of Adm nistrative Hearings, 6'714 Mail Service
Center, Raleigh, NC .99-71, Unless such demands are made this permit shall be finial and binding.
The issuance of this permit does not preclude the Perrnmee from corn.plir g with any and all
statutes, rules, regulations, or ordinances which may be imposed by other guvert ra ent agencies (local,
state, and federal) which have jurisdiction,
if you need additional inforrrtation, concethis rriatter, please contact stitr ligue, a
(919)733-5083 extension 524,
Since
cc: Cabarrus County Health Department
Mooresville Regional Office, Water Qual
ESP Associates
en ° T es ens
ectatti
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES'
RALEIGH
GRAVITY SEWER COLLECTION SYSTEMS PERMIT
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
following specified conditions and limitations:
1. This permit shall become voidable unless the facilitiesare constructed in accordance with the
conditions of the Division of Water Quality Gravity Sewer Design Criteria adopted February 12,
1996.
2. This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data,
3. The facilities must be properly maintained and operated at all times.
4. This permit is not transferable. In the event there is a desire for the facilities to change ownership,
or there .is a name change of the Permittee, a formal permit request must be submitted to the
Division of Water Quality (Division) accompanied by an application fee, documentation from the
parties involved, and other supporting materials as may be appropriate. The approval of this request
will be considered on its merits and may or may not be approved.
5. Construction of the gravity sewers shall be scheduled so as not to interrupt service by the existing
utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the
State,
6. Upon completion of construction and prior to operation of this permitted facility, a certification
and a copy of the record drawings (i.e., as constructed plans) must be received from a professional
engineer certifying that the permitted facility has been installed in accordance with the Division of
Water Quality Gravity Sewer Design Criteria adopted February 12, 1996, and other supporting
materials. If this project is to be completed in phases and partially certified, you shall retain the
responsibility to track further construction approved under the same permit, and shall provide a final
certificate of completion once the entire project has been completed.. A copy of the record
drawings, indicating the facilities constructed in the phase being certified, shall be submitted with
each partial certification.. Mail the Certification and one (1) copy of the "Record Drawings" to the
Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617.
7. A copy of the Record Drawings shall be maintained on file by the Perrnittee for a minimum of five
years from the date of the completion of construction.
Failure to abide by the conditions and lirnitations contained in this general sewer peiitiit or the
North Carolina Gravity Sewer Design Criteria may subject the Permittee to an enforcement action
by the Division, in accordance with North Carolina General Statute 143-215..6A to 143-215.6C.
1
ch In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required
by this Division, such as the construction of additional or replacement wastewater collection
I ft Noncompliance Notification:
The Permittee shall report by telephone to the 'Mooresville Regional Office, telephone number (704)
663-1699, as soon as possible, but in no case more than 24 hours or on the next working day,
following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable
of adequate wastewater transport, such as mechanical or electrical failures of pumps, line
blockage or breakage, etc,; or
b. Any failure of a sever line resulting in a by-pass directly to receiving waters without treatment
of all or any portion of the influent to such station or facility.
Pet -sons reporting such occurrences by telephone shall also file a written report in letter fon» within
five (5) days following first knowledge of the occurrence. This report must outline the actions
taken or proposed to be taken to ensure that the problem does not recur.
Permit issued this thiwentysseventh day of March,2000
NORTH CAROLINA -, NMENTAL MAN &(JEMFNT COMMISSION
ken T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Cornmissicm
Permit Number 11:00018126
Permit No. WQ0018126
March 27, 2000
ENGINEER'S CERTIFICATION
Partial
as a duly registered. Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, •full time) the construction of the
project,
for the
Project Arame Location and tor:
Permittee hereby states that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance of this permit, the certificate of coverage, the North Carolina Gravity Sewer Minimum
Design Manual, and other supporting materials.
North Carolina Professional Engineer's seal, signature, and date:
The above Engineer's Certification must be completed and submitted to the address below with one (1)
copy of the "Record. Drawings" (i.e., as-constmcted plans) of the wastewater collection system. This
project shall not be considered complete nor allowed to operate until this Engineer's Certification and the
,.Record Drawings" plans have been submitted. Any wastewater flow made tributary to the wastewater
collection system prior to completion of this Engineer's Certification shall be considered a violation of
the permit and shall subject the Permittee to appropriate enforcement actions.
NORTH CAROLINA DIVISION OF WATER QUAL
WATER QUALITY SECTION
NON -DISCHARGE PERMMITTING UNIT
1.617 MAIL SERVICE CENTER
RALEIGH, NORTH CAROLINA .276.99-1617
T