Loading...
HomeMy WebLinkAbout20210791 Ver 1_Riparian Buffer Authorization Request_20210409Buffer Authorization Application Form 15ANCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Onlin Update 10/23/2018 Water Resources ENVIRONMENTAL QUALITY Original Submittal 4/9/2021 A. Owner/Applicant Information General Information Primary Contact Email:* Who is submitting the application?* Is there an agent working on this application but not submitting it? 1. Property Owner Information: la. Name on Recorded Deed:* Jeffrey Kaylor Rease list the contact person's email for questions or payrrent on this project if needed. ✓ Owner r7 Applicant other than Owner ✓ Agent r Yes C No KIRBY RALPH H REVOCABLE TRUST AGREEMENT 1b. Responsible Party: (for Corporations) lc. Mailing Address:* Id. Telephone:* 8282172398 Street Address 5405NCHWY16N Address Line 2 Oty State / R-ovince / F�gion Claremont NC Fbstal / Zip Code Country 28610 United States le. Email Address:* jkaylornc@gmail.com 2. Applicant's Information (if different from owner): 2a. Name: Jeffrey Kaylor / Kelli Kirby Kaylor 2b. Company Affiliation: 2c. Mailing Address: Street Address 5405 NC HWY 16 N Address Line 2 aty State / Province / Region Claremont NC Fbstal / Zip Code Country 28610 United States 2d. Telephone: 8282172398 n 2e. Email Address: jkaylornc@gmail.com B. Project Information and Prior Project History ............................................................................................. 1. Project Information ............................................................................................. la. Name of Project:* Seawall repair at Kirby residence (Subdivision, facility, or establishrrent nacre) 1b. Is this a publicly -funded transportation project?* 1d. Subdivision Name: le. Nearest Municipality: Conover, NC 1f. Property Size: acres lg. County (or Counties) where the project is located:* Catawba 1h. Property ID# 6071 / 8044 Tax RN or Parcel id 1 i. Deed Information Type of Book Deed !Map Date of Purchase Book# 2196 10220 01017 J Page# 1544 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Cick the upload button or drag and drop files here to attach docunent IJF only 1k. How would you like to provide the Latitude and Longitude information?* F Address Lookup r Manually Address Lookup Latitude * 35.8125931 Street Address Address Line 2 ary R stal / Zip Code State / Province / Fegion Country Longitude *-81.2172645 11. Is the project located in any of North Carolina's twenty coastal counties?* r Yes C• No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Lake Hickory 2b. Water Quality Classification of nearest receiving water:* WS-V-B 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 586 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Soil behind the seawall 196' is eroding into the lake, permanent residence of owner. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach docurrent FDF only 3c. Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach docunent FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* Dig out from behind the wall add geosynthetic fabric and back fill, replace soil and replant the lawn. Will use a mini excavator Attach a site plan as applicable to the project: aick the upload button or drag and drop files here to attach docunent FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* ✓ Yes r No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C' Yes ( No 7. Future Project Plans ^, 7a. Is this project a phased project?* C. Proposed Impacts Inventory ....................................................................................................................................... Buffer Impacts ..................................................................................................................................... Project is in which protected Basin?* r Yes r No ✓ Neuse River Basin (15A NCAC 02B.0233) C' Catawba River Basin (15A NCAC 02B.0243) ✓ Randleman Lake Watershed (15A NCAC 02B.0250) C Tar -Pamlico River Basin (15A NCAC 02B.0259) ✓ Jordan Lake Watershed (15A NCAC 02B.0267) ✓ Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type * Zone 1 Zone 2 Seawall back fill repair Nap label (e.g. R ad Crossing 1) Lake Hickory Temporary (T) F2rmor Terrp Allowable 0.00 Square Feet 0.00 Square Feet Total Zone 1 Impacts: Total Zone 2 Impacts: Total Buffer Impacts: Comments: 0.00 0.00 0.00 Will be removing old backfill dirt and adding Geo fabric at base of wall then replacing the backfill dirt. A tree that is encroaching on seawall and endangering structures due to erosion will be removed. Yard will be replanted with grass. This will impact an area of about 5' behind wall and approximately 196' long. Project duration will be about 10 days. D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* The existing wall is between the water and yard, will be working on 10-20-ft sections at a time. Remove dirt, install Geo Fabric and replace dirt. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Same as above E. Diffuse Flow Plan la. What type of SCM are you providing?* I— Level Spreader I— Vegetated Conveyance (lower SHWT) I— Wetland Swale (higher SHWT) 17 Proposed project will not create concentrated stormwater flow through the buffer I— Other SCM that removed minimum of 30% nitrogen lc. Diffuse Flow Documentation* F. Supplementary Information Environmental Documentation Click the upload button or drag and drop files here to attach docun ent Diffuse Water flow.pdf FWF only 35.68KB la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? r Yes fr No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r Yes C No 2b. Is this an after -the -fact buffer authorization application? C Yes C' No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Additional Comments: aickthe upload button or drag and drop files here to attach docunent FCF only This property is the permanent residence of Betty Jo Kirby age 90, daughter Kelli Kirby Kaylor and husband Jeffrey Kaylor are submitting this application. The seawall has been eroding for many years and Jo's late husband Ralph Kirby was trying to get this repaired before his death last year. It is very un-safe and Jo cannot go into the yard near the lake without risk of falling into eroded areas and holes that are behind the wall. Caldwell Landscaping will be doing the work. The pictures attached show some of the areas that are eroding into the lake. This project is all behind the existing seawall and includes no new construction or destruction. H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Jeffrey W Kaylor Signature Submission Date: 4-9-21 (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project? * O Yes O No O Yes C' No ID#* 20210791 Version:* 1 Select Reviewer: Alan Johnson:eads\adjohnsonl Select Reviewing Office * Mooresville Regional Office - (704) 663-1699 Has payment been received?* ( No Payment Needed ✓ Fee Received ✓ Need Fee - send electronic notification Not sure what to use here. As there is a wall between the water and are we are repairing.