Loading...
HomeMy WebLinkAbout20190288 Ver 1_Monitoring Correspondence Response_20210412Strickland, Bev From: Daniel Davis <bmus@townofbeechmountain.com> Sent: Monday, April 12, 2021 2:47 PM To: Homewood, Sue Subject: [External] RE: Monitoring Correspondence Attachments: Buckeye Lake Reservior Info 2020 (BBT).xlsx; TOBM DWR Sue Homewood (response to 3-3-21 letter).docx Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Please find the data attached as requested in your letter. Also, we had some discussion on the phone about the format you are currently receiving the quarterly reports in. I have this quarters report due for you on April 15th. Should I send that report in format as normal, or would you prefer me to switch to the format in this attached spreadsheet? Thanks! Daniel Davis Public Utilities Director 510 Beech Mountain Pkwy. Beech Mtn, NC, 28604 BMUS@TownofBeechMountain.com Office 828-387-9282 Aoiii MOUNTAIN NORTH CAROLINA €citem Mrarfrak Hthaat Tokn BEECH Pursuant to North Carolina General Statutes, Chapter 132, Public Records, this e-mail and any attachments, as well as any e-mail messages(s) that may be sent in response to it, may be considered public records and therefore are subject to public records requests for review and copying. From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Wednesday, March 3, 2021 2:22 PM To: Daniel Davis <bmus@townofbeechmountain.com> Cc: Brady, Harold M. <harold.m.brady@ncdenr.gov>; Amanda.Jones@usace.army.mil; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Tarver, Fred <fred.tarver@ncdenr.gov>; Goudreau, Chris J. <chris.goudreau@ncwildlife.org> Subject: Monitoring Correspondence Hi Daniel, Please see attached correspondence which we discussed last week. Hard copies will not be sent unless requested. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Pursuant to North Carolina General Statutes, Chapter 132, Public Records, this e-mail and any attachments, as well as any e-mail messages(s) that may be sent in response to it, may be considered public records and therefore are subject to public records requests for review and copying. 2 DATE 1/1/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) 0.525 HIGHEST WITHDRAWAL RATE (GPM) 800 START TIME DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 HOUR HOUR HOUR HOUR STOP TIME PRIOR PRIOR(CFS) AFTER AFTER(CFS) 330am 400pm 1.99 RESERVOIR SURFACE ELEVATION (feet below spillway) 4.94 1.93 3.92 flowing over spillway 1/2/2020 1/3/2020 1/4/2020 1/5/2020 0.53 0.439 0.539 0.422 800 800 800 230am ■ 315pm linallaL 3.92 530am 345pm 2.11 7.76 430am 445pm 2.12 8.05 300am 100pm 2.23 12.0 1.94 2.14 2.28 2.23 4.07 6.94 14.3 12.0 ,flowing over spillway flowing over spillway flowing over spillway flowing over spillway 'flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway 1/6/2020 0.412 800 400am 200pm 2.24 12.0 2.21 11.2 1/7/2020 0.380 800 215am 1130am 2.21 10.8 2.24 12.4 1/8/2020 0.362 800 430am 100pm 2.18 10.0 2.13 8.35 1/9/2020 0.376 800 1/10/2020 0.340 800 1/11/2020 0.389 800 1/12/2020 0.397 800 1/13/2020 0.341 800 1/14/2020 0.352 800 1/15/2020 1/16/2020 1/17/2020 1/18/2020 1/19/2020 1/20/2020 1/21/2020 1/22/2020 1/23/2020 1/24/2020 1/25/2020 1/26/2020 1/27/2020 1/28/2020 1/29/2020 1/30/2020 1/31/2020 0.404 800 0.513 800 0.441 800 0.433 800 0.442 0.452 0.439 0.505 0.396 0.357 0.528 0.498 0.328 0.409 0.307 0.376 0.384 800 800 800 800 800 800 800 800 800 800 800 800 800 430am 500am 415a m 430am 500am 630am 445am 500am 445am 600am 445a m 445am 515am 400am 500am 445am 530am 330am 115pm 100pm 130pm 145pm 100pm 300pm 200pm 445pm 300pm 330pm 300pm 315pm 330pm 345pm 215pm 100pm 530pm 330pm 2.13 2.11 2.12 2.73 2.58 2.46 2.43 2.42 2.36 2.31 2.32 2.22 2.17 2.12 2.09 2.07 2.25 2.22 500am 1245pm 2.21 500am 230a1111.2.20 515am 1230pm 2.15 530am 215pm 2.13 530am 230pm 2.11 8.35 7.76 8.05 59.5 40.4 26.7 24.0 23.1 18.7 15.8 16.4 11.6 9.66 8.05 7.21 6.69 12.9 11.6 11.2 10.8 8.98 8.35 7.76 2.10 2.09 2.22 2.66 2.53 2.47 2.40 2.38 2.34 2.29 2.25 2.18 2.14 2.10 2.06 2.20 2.22 2.21 2.21 2.16 2.12 2.10 2.11 7.48 7.21 11.6 50.0 34.2 27.7 21.5 20.0 17.5 14.8 12.9 10.0 8.66 7.48 5.13 10.8 11.6 11.2 11.2 9.32 8.05 7.48 7.76 2/1/2020 0.497 800 300am 245pm 2.11 7.76 2.08 6.94 2/2/2020 0.513 800 300am 315pm 2.10 7.48 2.07 flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway flowing over spillway 6.44 flowing over spillway flowing over spillway 8.35 flowing over spillway 16.9 flowing over spillway 2/3/2020 0.370 800 600am 245pm 2.07 6.69 2.05 6.21 2/4/2020 2/5/2020 0.397 0.389 800 800 525am 230pm 2.11 500am 200pm 2.16 7.76 2.13 9.32 2.33 WATER RESTRICTION STAGE Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary we leave our stage setting on "Voluntary" all year round as we make widespread public notice or our water concerns and ask all residents to save water whenever possible. DATE 2/6/2020 2/7/2020 2/8/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) HIGHEST WITHDRAWAL RATE (GPM) 0.422 800 0.510 800 0.441 800 START TIME DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 RESERVOIR SURFACE HOUR HOUR HOUR HOUR ELEVATION (feet below STOP TIME PRIOR PRIOR(CFS) AFTER AFTER(CFS) spillway) WATER RESTRICTION STAGE 445am 230pm 2.65 48.7 3.33 185 flowing over spillway Voluntary 500am 445pm 3.33 192 ¥ 2.92 Mr88.4 "'flowing over spillway Voluntary 500am 315pm 2.78 65.4 2.67 49.6 flowing over spillway Voluntary 2/9/2020 0.486 800 545am 500pm 2.57 36.4 2.50 27.5 2/10/2020 0.432 800 2/11/2020 0.470 800 2/12/2020 0.384 800 2/13/2020 0.429 800 2/14/2020 2/15/2020 2/16/2020 2/17/2020 2/18/2020 2/19/2020 2/20/2020 2/21/2020 2/22/2020 2/23/2020 2/24/2020 2/25/2020 2/26/2020 2/27/2020 2/28/2020 0.451 800 0.567 800 0.471 800 0.490 0.410 0.426 0.399 0.474 0.543 0.426 0.408 0.441 0.368 0.389 0.494 800 800 800 800 800 800 800 800 800 800 800 800 2/29/2020 0.414 800 3/1/2020 3/2/2020 3/3/2020 3/4/2020 3/5/2020 0.402 0.350 0.396 0.402 0.337 800 800 800 800 800 3/6/2020 0.415 800 3/7/2020 0.376 800 3/8/2020 0.393 800 3/9/2020 0.436 800 3/10/2020 0.373 800 3/11/2020 3/12/2020 3/13/2020 3/14/2020 3/15/2020 3/16/2020 3/17/2020 0.322 0.388 0.383 0.393 0.368 0.364 0.389 800 800 800 800 800 800 800 500am 500am 330am 545am 445am 415am 330am 530am 530am 525am 445a m 500am 415am 430am 500am 500am 500am 530am 1245am 530am 600a m 430am 530am 430am 500am 500am 600a m 800am 500am 515am 500am 500am 500am 500am 500am 500am 500am 300pm 315pm 1245pm 330pm 315pm 515pm 200pm 500pm 245pm 300pm 200pm 345pm 430pm 200pm 230pm 315pm 145pm 230pm 1215pm 400pm 330pm 1245pm 245pm 200pm 100pm 245pm 245pm 645pm 315pm 145pm 1230pm 200pm 200pm 215pm 130pm 130pm 215pm 2.44 2.45 2.62 2.76 2.79 2.60 2.46 2.35 2.26 2.24 2.16 2.06 2.08 2.07 2.06 2.38 2.30 2.39 2.34 2.29 2.21 2.19 2.21 2.43 2.40 2.34 2.25 2.19 2.15 2.10 2.11 2.05 2.18 2.11 2.11 2.11 2.10 22.4 22.2 41.7 61.1 65.5 39.3 23.1 15.4 11.2 10.4 7.76 6.69 5.75 5.54 5.33 17.1 12.9 17.1 14.9 12.4 9.32 8.66 9.32 20.5 18.4 14.9 10.8 8.66 7.48 6.21 6.44 5.13 8.66 6.44 6.44 6.44 6.21 2.45 2.62 2.59 2.88 2.67 2.52 2.41 2.29 2.22 2.17 2.16 2.08 2.07 2.04 2.07 2.30 2.29 2.34 2.31 2.25 2.21 2.17 2.48 2.43 2.37 2.30 2.22 2.16 2.11 2.07 2.05 2.02 2.14 2.09 2.10 2.08 2.07 lflowing over spillway Voluntary 22.2 flowing over spillway Voluntary 41.7 flowing over spillway Voluntary 39.3 flowing over spillway Voluntary 80.5 flowing over spillway Voluntary 48.1 flowing over spillway Voluntary 29.1 flowing over spillway Voluntary 19.0 flowing over spillway Voluntary 12.4 flowing over spillway Voluntary 9.66 flowing over spillway Voluntary 8.05 flowing over spillway Voluntary 7.76 flowing over spillway Voluntary 5.75 flowing over spillway Voluntary 5.54 flowing over spillway Voluntary 4.94 flowing over spillway Voluntary 5.54 flowing over spillway Voluntary 12.9 flowing over spillway Voluntary 12.4 flowing over spillway Voluntary 14.9 flowing over spillway Voluntary 13.3 flowing over spillway Voluntary 10.8 flowing over spillway Voluntary 9.32 flowing over spillway Voluntary 8.05 'flowing over spillway Voluntary 24.9 flowing over spillway Voluntary 20.5 flowing over spillway Voluntary 16.5 flowing over spillway Voluntary 12.9 flowing over spillway Voluntary 9.66 flowing over spillway Voluntary 7.76 flowing over spillway Voluntary 6.44 flowing over spillway Voluntary 5.54 flowing over spillway Voluntary 5.13 flowing over spillway Voluntary 4.57 flowing over spillway Voluntary 7.21 flowing over spillway Voluntary 5.98 flowing over spillway Voluntary 6.21 flowing over spillway Voluntary 5.75 I flowing over spillway Voluntary 7.48 flowing over spillway Voluntary DATE 3/18/2020 3/19/2020 3/20/2020 3/21/2020 3/22/2020 3/23/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) i 0.368 0.374 0.386 0.382 0.353 0.344 HIGHEST WITHDRAWAL RATE (GPM) 800 800 800 800 800 800 START TIME 3/24/2020 3/25/2020 3/26/2020 0.345 0.394 0.414 800 800 800 3/27/2020 3/28/2020 0.319 0.358 800 800 DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 RESERVOIR SURFACE HOUR HOUR HOUR HOUR ELEVATION (feet below STOP TIME PRIOR PRIOR(CFS) AFTER AFTER(CFS) spillway) WATER RESTRICTION STAGE 500am 145pm 2.12 6.69 2.09 5.98 flowing over spillway Voluntary 500am 100pm 2.10 6.21 2.07 5.54 flowing over spillway Voluntary 500am 130pm 2.10 6.21 2.10 6.21Mflowing over spillway Voluntary 545am 245pm 2.39 17.8 2.37 16.5 flowing over spillway Voluntary 600am 200pm 2.35 15.4 2.33 14.3 flowing over spillway Voluntary 500am 100pm 2.31 13.3 2.42 19.0 flowing over spillway Voluntary 500am 100pm 2.35 15.4 2.33 14.3 flowing over spillway Voluntary 530am 245pm 2.70 52.4 2.66 46.7 flowing over spillway Voluntary 500am 230pm 2.61 40.5 2.57 35.1 flowing over spillway Voluntary 445am 1215pm 2.50 26.9 2.44 21.4 flowing over spillway Voluntary 500am 130pm 2.39 17.8 2.35 15.4 flowing over spillway Voluntary , 500am 100pm 2.30 12.9 2.25 10.8 flowing over spillway Voluntary 500am 130pm 2.20 8.98 2.17 8.05 flowing over spillway Voluntary 500am 1230pm 2.14 7.21 2.14 7.21 flowing over spillway Voluntary 500am 115pm 2.18 8.35 2.14 7.21 flowing over spillway Voluntary 500am 1215pm 2.13 6.94 2.09 5.98 flowing over spillway Voluntary 500am 130pm 2.11 6.44 2.07 5.54 flowing over spillway Voluntary 445am 1200pm 2.08 5.75 2.04 4.94 flowing over spillway Voluntary 445am 1200pm 2.05 5.13 2.02 4.57 flowing over spillway Voluntary 500am 100pm 2.03 4.75 2.00 4.23 flowing over spillway Voluntary flowing over spillway Voluntary 430am 200pm 2.01 4.40 1.99 4.07 flowing over spillway Voluntary 500am 1230pm 2.34 14.9 2.38 17.1 ,flowing over spillway Voluntary 500am 130pm 2.34 14.9 2.31 13.3 flowing over spillway Voluntary 445am 1245pm 2.29 12.4 2.26 11.2 flowing over spillway Voluntary 500am 1215pm 2.23 10.0 2.18 8.35 flowing over spillway Voluntary 500am 245pm 3.60 N/A 3.10 125 flowing over spillway Voluntary 500am 130pm 2.80 67.9 2.68 50.7 flowing over spillway Voluntary 500am 1245pm 2.56 35.4 2.50 28.4 ,flowing over spillway Voluntary 500am 1215pm 2.42 21.0 2.38 18.2 flowing over spillway Voluntary 500am 1230pm 2.31 14.3 2.27 12.4 flowing over spillway Voluntary 500am 130pm 2.25 11.6 2.35 16.4 flowing over spillway Voluntary 500am 1200pm 2.27 12.4 2.24 11.2 flowing over spillway Voluntary 500am 130pm 2.25 11.6 2.38 18.2 flowing over spillway Voluntary 500am 330pm 2.33 15.3 2.32 14.8 flowing over spillway Voluntary 500am 1145am 2.30 13.8 2.27 12.4 flowing over spillway Voluntary 500am 100pm 2.25 11.6 2.28 12.9 flowing over spillway Voluntary 500am 1245pm 2.25 11.6 2.28 12.9 flowing over spillway Voluntary 500am 1230pm 2.25 11.6 2.25 11.6 flowing over spillway Voluntary 500am 145pm 2.34 15.9 2.28 11.6 flowing over spillway Voluntary 500am 1245pm 2.36 17.0 2.33 15.3 flowing over spillway Voluntary 3/29/2020 3/30/2020 3/31/2020 4/1/2020 4/2/2020 4/3/2020 4/4/2020 4/5/2020 4/6/2020 0.327 0.367 0.326 0.354 0.312 0.368 0.313 0.321 0.340 800 800 800 800 800 800 800 800 800 4/7/2020 0.317 800 500am 1215pm 2.01 4.40 2.03 4.75 4/8/2020 0.394 800 4/9/2020 4/10/2020 4/11/2020 4/12/2020 4/13/2020 4/14/2020 4/15/2020 4/16/2020 0.328 0.371 0.347 0.320 0.418 0.357 0.333 0.305 800 800 800 800 800 800 800 800 4/17/2020 0.222 800 4/18/2020 4/19/2020 4/20/2020 4/21/2020 4/22/2020 4/23/2020 4/24/2020 4/25/2020 0.456 0.306 0.366 0.444 0.286 0.343 0.334 0.301 800 800 800 800 800 800 800 800 4/26/2020 4/27/2020 0.370 0.329 800 800 DATE 4/28/2020 4/29/2020 4/30/2020 5/1/2020 5/2/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) 0.398 0.344 mill 0.424 0.310 0.381 HIGHEST WITHDRAWAL RATE (GPM) 800 800 800 800 800 START TIME 5/3/2020 0.406 800 5/4/2020 0.453 800 5/5/2020 0.411 800 5/6/2020 5/7/2020 5/8/2020 5/9/2020 5/10/2020 5/11/2020 5/12/2020 5/13/2020 5/14/2020 5/15/2020 5/16/2020 5/17/2020 5/18/2020 5/19/2020 0.431 0.398 0.461 0.356 0.425 0.425 0.403 0.445 0.457 0.454 0.387 0.437 0.390 0.437 800 800 800 800 800 800 800 800 800 800 800 800 800 800 DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 I FLOW 1 l HEIGHT 1 FLOW 1 RESERVOIR SURFACE HOUR HOUR I HOUR HOUR ELEVATION (feet below STOP TIME PRIOR 1PRIOR(CFS)1 AFTER AFTER(CFS) spillway) 500am 215pm 2.32 14.8 2.30 13.8 500am 100pm 2.28 12.9 ¥ 2.25 1p 11.6 500am 245pm 3.05 114 2.85 75.9 500am 1215pm 2.73 57.9 2.66 49.4 600am 300pm 2.57 36.7 2.51 29.5 530am 300pm 2.46 24.5 2.41 20.3 500am 330pm 2.38 18.8 2.31 14.3 500am 230pm 2.27 12.4 2.25 11.6 500am 300pm 2.25 11.6 2.28 8.98 500am 215pm 2.24 11.2 2.21 10.0 515am 400pm 2.19 9.32 2.19 9.32 500am 115pm 2.24 11.2 2.20 9.66 500am 300pm 2.19 9.32 2.16 8.35 500am 230pm 2.18 8.98 2.13 7.48 500am 230pm 2.12 7.21 2.08 6.21 500am 330pm 2.09 6.44 2.07 5.98 500am 345pm 2.06 5.75 2.02 4.94 445am 315pm 2.03 5.13 1.98 4.23 500am 215pm 1.99 4.40 1.95 3.77 500am 330pm 1.97 4.07 1.92 3.35 500am 200pm 1.94 3.62 1.95 3.77 flowing over spillway Voluntary 500am 300pm 2.58 38.1 2.54 32.4 flowing over spillway Voluntary 515am 200pm 2.70 53.6 3.01 105 flowing over spillway Voluntary 500am 430pm 3.03 109 2.88 81.1 _,flowing over spillway Voluntary 500am 300pm 2.74 59.3 2.69 52.2 flowing over spillway Voluntary 545am 400pm 2.58 38.1 2.51 29.5 'flowing over spillway Voluntary 600am 500pm 2.44 22.7 2.41 20.3 flowing over spillway Voluntary 430am 330pm 2.35 16.4 2.55 34.2 flowing over spillway Voluntary 500am 230pm 2.39 18.8 2.35 16.4 flowing over spillway Voluntary 500am 315pm 2.30 13.8 2.25 11.6 lflowing over spillway Voluntary 500am 515pm 2.24 11.2 2.17 8.66 flowing over spillway Voluntary 500am 145pm 2.15 8.05 2.11 6.94 flowing over spillway Voluntary 430am 430pm 2.16 8.35 2.07 5.98 flowing over spillway Voluntary 500am 300pm 2.06 4.75 2.02 3.92 flowing over spillway Voluntary 500am 400pm 2.01 4.07 1.96 3.35 flowing over spillway Voluntary 500am 230pm 1.97 3.62 1.92 2.63 flowing over spillway Voluntary 530am 430pm 1.94 3.21 1.86 2.33 flowing over spillway Voluntary 500am 500pm 1.91 2.97 1.83 2.14 flowing over spillway Voluntary 500am 330pm 1.89 2.85 1.81 1.89 flowing over spillway Voluntary 500am 400pm 1.88 2.42 1.70 1.53 iflowing over spillway Voluntary 500am 430pm 1.84 2.06 1.73 1.08 flowing over spillway Voluntary 5/20/2020 5/21/2020 5/22/2020 5/23/2020 5/24/2020 5/25/2020 5/26/2020 5/27/2020 5/28/2020 5/29/2020 5/30/2020 0.366 0.496 0.419 0.443 0.474 0.469 0.414 0.441 0.530 0.381 0.463 800 800 800 800 800 800 800 800 800 800 800 5/31/2020 0.433 800 6/1/2020 6/2/2020 6/3/2020 6/4/2020 6/5/2020 0.470 0.412 0.472 0.520 0.452 800 800 800 800 800 6/6/2020 6/7/2020 0.476 0.495 800 800 WATER RESTRICTION STAGE flowing over spillway Voluntary lflowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary flowing over spillway Voluntary DATE 6/8/2020 6/9/2020 6/10/2020 6/11/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) i 0.483 0.467 0.479 0.665 • HIGHEST WITHDRAWAL RATE (GPM) 800 500 500 450 START TIME DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 HOUR HOUR HOUR HOUR STOP TIME PRIOR I PRIOR(CFS) I AFTER AFTER(CFS) RESERVOIR SURFACE ELEVATION (feet below spillway) 500am 400pm 1.80 1.97 1.53 1.14 flowing over spillway 415am 545pm 1.79 1.67 1.67 1.47 flowing over spillway 530am 1200am 1.75 2.23 1.70 1.14 7flowing over spillway 515am 1200am 1.82 1.74 1.72 0.72 flowing over spillway 6/12/2020 0.503 500 515am 1130pm 1.76 1.41 1.59 0.31 6/13/2020 6/14/2020 6/15/2020 6/16/2020 6/17/2020 6/18/2020 6/19/2020 6/20/2020 6/21/2020 6/22/2020 6/23/2020 6/24/2020 6/25/2020 6/26/2020 6/27/2020 6/28/2020 6/29/2020 6/30/2020 7/1/2020 0.526 0.552 0.538 0.467 0.479 0.543 0.531 0.537 0.447 0.477 0.658 0.474 0.532 0.638 0.645 0.525 0.501 0.492 0.508 500 800 800 500 500 500 700 600 500 800 800 500 500 600 600 500 500 500 500 7/2/2020 0.484 500 7/3/2020 0.513 500 7/4/2020 0.562 800 7/5/2020 7/6/2020 7/7/2020 0.683 0.810 0.413 500 800 500 515am 515am 530am 515am 545am 500am 600a m 430am 530am 545am 500am 530am 600am 545am 530am 600am 500am 500am 500am 500am 500am 545am 445a m 530am 500am 1200am 945pm 600pm 945pm 1000pm 1145pm 900pm 800pm 830pm 600pm 930pm 1100pm 1145pm 1200am 1200am 1130pm 1030pm 1015pm 1100pm 1145pm 1145pm 1015pm 1200am 1200am 515pm 1.71 1.64 1.94 1.85 1.94 2.05 2.02 2.08 2.04 2.02 1.96 1.98 1.90 1.99 1.93 2.05 2.44 2.41 2.40 2.29 2.20 2.10 2.04 2.03 1.95 0.97 3.62 2.53 3.62 5.54 4.94 6.21 5.33 4.94 3.92 4.23 3.09 4.40 3.48 5.54 22.7 20.3 19.5 13.3 9.66 6.69 5.33 5.13 3.77 3.21 1.47 2.09 1.87 1.96 2.07 2.01 2.01 1.97 2.01 1.93 2.00 1.87 1.96 1.86 1.90 2.44 2.42 2.46 2.29 2.19 2.09 2.01 2.02 1.91 1.89 WATER RESTRICTION STAGE flowing over spillway 6.44 flowing over spillway 2.74 flowing over spillway 3.77 flowing over spillway 5.98 flowing over spillway 4.75 flowing over spillway 4.75 flowing over spillway 4.07 flowing over spillway 4.75 flowing over spillway 3.45 flowing over spillway 4.57 flowing over spillway 2.74 flowing over spillway 3.92 flowing over spillway 2.63 flowing over spillway 3.09 flowing over spillway 21.9 flowing over spillway Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary 21.0 flowing over spillway Voluntary 24.5 flowing over spillway Voluntary 13.3 ,flowing over spillway Voluntary 9.32 flowing over spillway Voluntary 6.441eflowing over spillway Voluntary 4.75 flowing over spillway Voluntary 4.94 flowing over spillway Voluntary 2.33 flowing over spillway Voluntary 2.97Iflowing over spillway Voluntary 3.21 flowing over spillway Voluntary flowing over spillway Voluntary 7/8/2020 0.500 500 530am 1030pm 1.91 3.09 1.90 1.74 7/9/2020 7/10/2020 7/11/2020 7/12/2020 7/13/2020 7/14/2020 7/15/2020 7/16/2020 0.566 0.516 0.419 0.472 0.578 0.543 0.516 0.499 500 500 500 500 500 500 500 500 7/17/2020 7/18/2020 0.602 0.572 500 500 500am 1200am 1.90 2.42 1.76 1.67 flowing over spillway Voluntary 500am 1200am 1.84 2.06 1.75 1.14 flowing over spillway Voluntary 500am 1015pm 1.80 1.74 1.68 1.02 flowing over spillway Voluntary 500am 1115pm 1.76 1.47 1.65 0 flowing over spillway Voluntary 515am 1200am 1.72 0.86 0.85 0.15 flowing over spillway Voluntary 500am 1030pm 1.62 0.86 1.31 0.05 flowing over spillway Voluntary 500am 1200am 1.62 1.08 1.26 0 flowing over spillway Voluntary 500am 1145pm 1.66 0.91 0.62 3.04 flowing over spillway Voluntary 545am 1115pm 1.63 1.74 1.90 0 flowing over spillway Voluntary 545am 1200am 1.76 0 N/A 12.7 Alflowing over spillway Voluntary DATE 7/19/2020 7/20/2020 7/21/2020 7/22/2020 7/23/2020 7/24/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) 0.470 0.700 1 0.468 0.604 0.449 0.561 HIGHEST WITHDRAWAL RATE (GPM) 500 800 800 800 500 500 START TIME DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 RESERVOIR SURFACE WATER HOUR HOUR HOUR HOUR ELEVATION (feet below RESTRICTION STOP TIME PRIOR PRIOR(CFS) AFTER AFTER(CFS) spillway) STAGE 200am 545pm N/A 14.8 3.11 4.07 flowing over spillway Voluntary 500am 1145pm 2.29 4.57 V 1.94 ip 2.745flowingover spillway Voluntary 500am 515pm 1.97 2.85 1.84 6.69 flowing over spillway Voluntary 430am 1000pm 1.85 5.33 2.07 5.13 Mlflowing over spillway Voluntary 400am 400pm 2.01 27.7 2.00 30.8 flowing over spillway Voluntary 345am 445pm 2.47 24.0 2.50 43.8 flowing over spillway Voluntary 500am 715pm 2.43 21.5 2.61 16.9 flowing over spillway Voluntary 800am 900pm 2.43 16.9 2.33 12.9 flowing over spillway Voluntary 415am 315pm 2.33 11.6 2.25 8.05 flowing over spillway Voluntary 400am 515pm 2.22 7.76 2.12 5.98 flowing over spillway Voluntary 400am 315pm 2.11 5.54 2.03 4.49 flowing over spillway Voluntary 400am 315pm 2.02 6.94 1.99 4.94 flowing over spillway Voluntary 330am 515pm 2.08 6.94 1.99 4.94 flowing over spillway Voluntary 500am 515pm 2.10 7.48 1.93 3.92 flowing over spillway Voluntary 500am 515pm 1.96 4.40 1.94 4.07 flowing over spillway Voluntary 430am 715pm 1.98 4.75 2.65 48.7 flowing over spillway Voluntary 400am 615pm 2.58 40.4 2.45 25.7 flowing over spillway Voluntary 400am 400pm 2.42 23.1 2.30 15.3 flowing over spillway Voluntary 430am 615pm 2.27 13.8 2.18 10.0 flowing over spillway Voluntary 400am 415pm 2.17 9.66 2.09 7.21 flowing over spillway Voluntary 415am 430pm 2.10 7.48 2.01 5.33 flowing over spillway Voluntary 415am 430pm 2.02 5.54 1.92 3.37 flowing over spillway Voluntary 400am 600pm 1.95 4.23 1.89 3.35 flowing over spillway Voluntary 400am 300pm 1.94 4.07 1.83 2.63 flowing over spillway Voluntary 400a m 300pm 1.91 3.62 2.02 5.54 flowing over spillway Voluntary 400am 345pm 1.97 4.57 1.83 2.63 'flowing over spillway Voluntary 400am 430pm 1.93 3.77 2.48 28.7 flowing over spillway Voluntary 400am 500pm 2.27 13.8 2.53 34.2 flowing over spillway Voluntary 800am 745pm 2.37 17.5 2.29 14.8 flowing over spillway Voluntary 400am 445pm 2.29 14.8 2.22 11.6 flowing over spillway Voluntary 430am 130pm 2.20 10.8 2.12 8.05 flowing over spillway Voluntary 400am 515pm 2.11 7.76 2.02 5.54 flowing over spillway Voluntary 400am 245pm 2.04 5.98 1.98 4.75 flowing over spillway Voluntary 600am 515pm 1.98 4.75 1.95 4.23 flowing over spillway Voluntary 515am 345pm 1.95 4.23 1.88 3.21 flowing over spillway Voluntary 545am 415pm 1.94 4.07 1.84 1.89 flowing over spillway Voluntary 415am 915pm 1.88 3.21 1.77 2.06 flowing over spillway Voluntary 400am 1000pm 1.87 3.21 1.72 1.67 flowing over spillway Voluntary 400am 930pm 1.83 2.63 1.68 1.41 flowing over spillway Voluntary 500am 545pm 1.81 2.42 1.72 1.67 (flowing over spillway Voluntary 600am 1130pm 1.79 1.53 1.67 1.35 flowing over spillway Voluntary 7/25/2020 7/26/2020 7/27/2020 0.624 0.553 0.476 800 800 800 7/28/2020 7/29/2020 0.576 0.494 800 800 7/30/2020 7/31/2020 8/1/2020 8/2/2020 8/3/2020 8/4/2020 8/5/2020 8/6/2020 8/7/2020 8/8/2020 8/9/2020 8/10/2020 8/11/2020 8/12/2020 8/13/2020 8/14/2020 8/15/2020 8/16/2020 8/17/2020 8/18/2020 8/19/2020 8/20/2020 8/21/2020 8/22/2020 8/23/2020 8/24/2020 8/25/2020 8/26/2020 0.463 0.594 0.534 0.533 0.588 0.539 0.511 0.584 0.529 0.526 0.544 0.607 0.478 0.480 0.510 0.540 0.570 0.514 0.539 0.396 0.564 0.421 0.492 0.440 0.484 0.603 0.394 0.470 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 500 500 8/27/2020 8/28/2020 0.342 0.477 500 500 DATE 8/29/2020 8/30/2020 8/31/2020 9/1/2020 9/2/2020 9/3/2020 9/4/2020 9/5/2020 9/6/2020 9/7/2020 9/8/2020 9/9/2020 9/10/2020 9/11/2020 9/12/2020 9/13/2020 9/14/2020 9/15/2020 9/16/2020 9/17/2020 9/18/2020 9/19/2020 9/20/2020 9/21/2020 9/22/2020 9/23/2020 9/24/2020 9/25/2020 9/26/2020 9/27/2020 9/28/2020 9/29/2020 9/30/2020 10/1/2020 i TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) 0.520 0.412 0.478 0.487 0.446 0.543 0.449 0.498 0.559 0.543 0.488 0.512 0.450 0.547 0.429 0.487 0.671 0.449 0.477 0.516 0.461 0.552 0.512 1 HIGHEST WITHDRAWAL RATE (GPM) 800 800 800 500 500 500 500 500 500 500 500 500 500 500 500 500 800 500 500 500 800 800 800 0.430 800 0.485 800 0.417 800 0.446 800 0.496 800 0.530 800 0.585 800 0.538 800 0.403 800 0.377 800 0.528 800 START TIME 400am 415am 400am 400am 400am 400am 345am 530am 315am 400am 1200am 1200am 100am 400am 100am 400am 345am 345am 345am 100am 515am 445 a m 515am 430am 400am 430am 400am 400am 500am 500am 345am 345am 400am 415a m DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 HOUR HOUR HOUR HOUR STOP TIME PRIOR 1PRIOR(CFS)1 AFTER AFTER(CFS) 615pm 445pm 430pm 745pm 400pm 1015pm 815pm 1145pm 1145pm 1200am 530pm 530pm 515pm 1200am 615pm 715pm 715pm 815pm 1200am 545pm 415pm 545pm 515pm 515pm 330pm 345pm 330pm 330pm 515pm 615pm 430pm 115pm 100pm 430pm 1.79 1.84 1.78 1.80 1.89 1.79 1.71 1.69 1.61 1.43 N/A 1.38 1.59 1.78 1.17 1.93 1.74 1.78 1.73 1.53 2.04 1.98 1.95 1.92 1.87 1.85 1.82 1.96 1.98 1.91 1.88 1.85 2.04 1.95 2.23 2.74 2.63 2.33 3.35 2.23 1.67 1.47 0.97 0.29 0 0.19 0.86 2.14 0 3.92 1.82 2.14 1.74 0.59 5.98 4.75 4.23 3.77 3.09 2.85 2.53 4.40 4.75 3.62 3.21 2.85 5.98 4.23 1.83 1.69 1.76 1.93 1.67 1.65 1.58 1.53 0.6 N/A N/A 0.56 1.59 1.17 1.90 1.65 1.56 1.54 1.53 2.27 1.96 1.93 1.88 1.84 1.75 1.70 1.79 2.04 1.87 1.81 1.79 2.03 1.93 1.84 RESERVOIR SURFACE ELEVATION (feet below spillway) 2.63 flowing over spillway 1.47 flowing over spillway 1.97 flowing over spillway 3.92 flowing over spillway 1.35 flowing over spillway 1.21 flowing over spillway 0.82 flowing over spillway 0.59 flowing over spillway O flowing over spillway O flowing over spillway O flowing over spillway 0 flowing over spillway 0.86 flowing over spillway 0.003 flowing over spillway 3.48 flowing over spillway 1.21 flowing over spillway O flowing over spillway 0.63 flowing over spillway 0.59 flowing over spillway 13.8 flowing over spillway WATER RESTRICTION STAGE Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary 4.40 flowing over spillway Voluntary 3.92 flowing over spillway Voluntary 3.21 flowing over spillway Voluntary 2.74 Iflowing over spillway Voluntary 1.899flowing over spillway Voluntary 1.53 flowing over spillway Voluntary 2.23 flowing over spillway Voluntary 5.98 flowing over spillway Voluntary 3.09 flowing over spillway Voluntary 2.42 flowing over spillway Voluntary 2.23 flowing over spillway Voluntary 5.75 flowing over spillway Voluntary 3.92 flowing over spillway Voluntary 2.74 flowing over spillway Voluntary flowing over spillway Voluntary 10/2/2020 0.512 800 345am 330pm 1.92 3.48 1.81 2.42 10/3/2020 10/4/2020 10/5/2020 10/6/2020 0.478 800 0.484 800 0.536 800 0.459 500 10/7/2020 10/8/2020 0.635 800 0.433 500 345am 245pm 1.90 3.48 1.83 2.14 flowing over spillway Voluntary 345am 300pm 1.88 3.21 1.74 1.82 flowing over spillway Voluntary 345am 645pm 1.85 2.85 1.76 1.97 flowing over spillway Voluntary 400am 700pm 1.83 2.63 1.65 1.21 flowing over spillway Voluntary 330am 615pm 1.79 2.23 1.49 0.46 flowing over spillway Voluntary 400am 745pm 1.77 2.06 1.59 0.86 .flowingover spillway Voluntary DATE 10/9/2020 10/10/2020 10/11/2020 10/12/2020 10/13/2020 10/14/2020 10/15/2020 10/16/2020 10/17/2020 10/18/2020 10/19/2020 10/20/2020 10/21/2020 10/22/2020 10/23/2020 10/24/2020 10/25/2020 10/26/2020 10/27/2020 10/28/2020 10/29/2020 10/30/2020 10/31/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) HIGHEST WITHDRAWAL RATE (GPM) 0.476 500 0.529 1 500 0.568 800 0.465 • 800 0.470 800 0.627 800 0.493 800 0.476 800 0.612 800 0.505 800 0.496 800 0.417 0.626 0.537 0.542 0.476 0.524 0.496 0.542 0.610 0.654 0.494 0.423 800 800 800 800 800 800 800 800 800 800 800 800 START TIME 11/1/2020 0.482 800 11/2/2020 0.414 800 11/3/2020 0.460 800 11/4/2020 0.442 800 11/5/2020 0.439 800 11/6/2020 11/7/2020 11/8/2020 0.459 800 0.454 800 0.476 800 11/9/2020 0.552 800 11/10/2020 0.393 800 11/11/2020 0.413 800 11/12/2020 11/13/2020 11/14/2020 11/15/2020 11/16/2020 11/17/2020 11/18/2020 0.560 0.447 0.462 0.508 0.488 0.435 0.473 800 800 800 800 800 800 800 DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 I FLOW 1 l HEIGHT 1 FLOW 1 RESERVOIR SURFACE HOUR HOUR I HOUR I HOUR ELEVATION (feet below STOP TIME PRIOR PRIOR(CFS) AFTER AFTER(CFS) spillway) 300am 630pm 1.72 330am 800pm 1.84 330am 500pm 2.26 400am 230pm 2.33 330am 230pm 2.27 345am 615pm 2.20 415am 400pm 2.14 330am 230pm 2.09 315am 515pm 2.05 330am 315pm 2.01 330am 300pm 1.98 330am 100pm 1.95 400am 615pm 1.92 400am 445pm 1.90 415am 445pm 1.90 500am 445pm 1.88 500am 530pm 1.88 400am 315pm 1.85 345am 415pm 1.83 400am 600pm 1.83 400am 700pm 2.22 400am 315pm 2.83 400am 145pm 2.67 330am 230pm 2.50 400am 130pm 2.37 400am 230pm 2.28 400am 215pm 2.20 400am 215pm 2.14 400am 245pm 2.09 400am 230pm 2.05 400am 300pm 2.02 345am 430pm 1.99 400am 100pm 1.97 400am 130pm 1.98 400am 445pm 2.76 345am 230pm 2.66 230am 130pm 2.51 330am 345pm 2.40 400am 315pm 2.30 345am 145pm 2.23 400am 245pm 2.16 w 1.67 2.74 13.3 16.7 13.3 10.2 8.01 6.53 5.50 4.62 4.03 3.51 3.04 2.75 2.74 2.53 2.53 2.23 2.06 2.06 9.32 71.4 47.5 26.2 16.0 11.6 8.66 6.94 5.75 4.94 4.40 3.92 3.62 3.77 60.6 46.0 27.1 17.7 12.2 9.46 7.29 1.44 0.31 flowing over spillway 1p 2.29 ¥ 14.811.flowing over spillway 2.31 16.8 flowing over spillway 2.27 13.4 'flowing over spillway 2.21 10.6 flowing over spillway 2.14 8.07 flowing over spillway 2.07 6.10 flowing over spillway 2.01 4.77 flowing over spillway 1.90 3.69 flowing over spillway 1.92 3.21 flowing over spillway 1.88 2.68 flowing over spillway 1.83 2.14 flowing over spillway 1.73 1.84 flowing over spillway 1.79 1.74 flowing over spillway 1.70 1.14 flowing over spillway 1.71 1.21 flowing over spillway 1.71 1.21 flowing over spillway 1.64 0.82 flowing over spillway 1.58 0.56 flowing over spillway 1.95 3.35 flowing over spillway 2.62 41.1 flowing over spillway Voluntary 2.74 57.08 flowing over spillway Voluntary 2.58 35.7 flowing over spillway Voluntary 2.42 19.2 flowing over spillway Voluntary 2.31 12.9 flowing over spillway Voluntary 2.21 8.98 flowing over spillway Voluntary 2.14 6.94 flowing over spillway Voluntary WATER RESTRICTION STAGE Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary 2.07 5.33 flowing over spillway Voluntary 2.02 4.40 flowing over spillway Voluntary 1.98 3.77 IP flowing over spillway Voluntary 1.94 3.21 flowing over spillway Voluntary 1.90 2.74 flowing over spillway Voluntary 1.88 2.53 flowing over spillway Voluntary 2.13 6.69 flowing over spillway Voluntary 2.73 56.3 flowing over spillway Voluntary 2.56 32.9 flowing over spillway Voluntary 2.44 20.5 flowing over spillway Voluntary 2.33 13.7 flowing over spillway Voluntary 2.17 9.48 flowing over spillway Voluntary 2.17 7.58 I flowing over spillway Voluntary 2.09 5.59 flowing over spillway Voluntary DATE 11/19/2020 11/20/2020 11/21/2020 11/22/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) 0.460 0.376 • HIGHEST WITHDRAWAL RATE (GPM) 800 800 START TIME 0.384 800 0.515 800 DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 RESERVOIR SURFACE HOUR HOUR HOUR HOUR ELEVATION (feet below STOP TIME PRIOR 1PRIOR(CFS)1 AFTER AFTER(CFS) spillway) 400am 245pm 2.11 6.02 2.05 4.78 flowing over spillway 415am 115pm 2.07 5.15 2.00 3.92 flowing over spillway 415am 130pm 2.04 4.57 1.96 3.33Mflowing over spillway 530am 545pm 1.99 3.74 1.94 3.06 flowing over spillway flowing over spillway 230pm 1.97 3.43 1.87 2.29 flowing over spillway flowing over spillway 745pm 1.97 3.40 1.85 2.08 flowing over spillway flowing over spillway 500am 745pm 1.91 2.65 1.79 1.61 flowing over spillway 345am 345pm 1.91 2.64 1.75 1.35 flowing over spillway 400am 215pm 2.07 4.94 1.98 3.48 flowing over spillway 315am 215pm 2.01 5.92 1.90 2.53 flowing over spillway 400am 215pm 1.97 3.35 1.88 2.33 flowing over spillway 400am 415pm 1.97 3.35 1.92 2.74 flowing over spillway 345am 415pm 2.00 3.77 2.06 4.75 flowing over spillway 415am 430pm 2.61 38.4 2.51 25.9 flowing over spillway 530am 615pm 2.48 22.9 2.43 18.8 flowing over spillway 400am 330pm 2.40 16.8 2.33 13.0 flowing over spillway 445am 445pm 2.29 11.2 2.24 9.32 flowing over spillway 200am 230pm 2.23 8.98 2.18 7.48 fIowing over spillway Voluntary 400am 315pm 2.19 7.76 2.14 6.44 flowing over spillway Voluntary 400am 430pm 2.16 6.94 2.10 5.54 flowing over spillway Voluntary 345am 615pm 2.11 5.75 2.07 4.94 flowing over spillway Voluntary 345am 415pm 2.09 5.33 2.05 4.57 'flowing over spillway Voluntary 200am 300pm 2.07 4.94 2.57 32.8 flowing over spillway Voluntary 430am 930pm 2.55 30.3 2.48 22.9 flowing over spillway Voluntary 100am 315pm 2.49 23.9 2.48 22.9 flowing over spillway Voluntary 400am 800pm 2.45 20.3 2.40 16.8 flowing over spillway Voluntary 130am 815pm 2.40 16.8 2.33 13.0 flowing over spillway Voluntary 315am 930pm 2.32 12.5 2.27 10.4 flowing over spillway Voluntary 230am 515pm 2.27 10.8 2.24 9.32 flowing over spillway Voluntary 245am 345pm 2.23 8.98 2.18 7.48 flowing over spillway Voluntary 145am 1200am 2.18 7.48 N/A 3.92 flowing over spillway Voluntary 1200am 830pm N/A 4.07 2.07 4.94 flowing over spillway Voluntary 330am 1200am 2.10 5.54 N/A 13.0 flowing over spillway Voluntary 1200am 200pm N/A 17.5 2.30 13.0 flowing over spillway Voluntary 245am 615pm 2.33 13.0 2.32 12.5 flowing over spillway Voluntary 1230am 415pm 2.32 12.5 2.29 11.2 flowing over spillway Voluntary 245am 500pm 2.28 10.8 2.29 11.2 flowing over spillway Voluntary 300am 630pm 2.31 12.0 2.28 8.98 .flowingover spillway Voluntary 11/23/2020 0.553 800 400am 430pm 2.04 4.53 1.91 2.70 11/24/2020 0.467 800 330am 11/25/2020 0.500 800 345am 330pm 1.94 3.03 1.84 2.01 11/26/2020 0.689 800 400am 11/27/2020 0.553 800 400am 445pm 1.94 2.88 1.83 1.91 11/28/2020 11/29/2020 11/30/2020 12/1/2020 12/2/2020 12/3/2020 12/4/2020 12/5/2020 12/6/2020 12/7/2020 12/8/2020 12/9/2020 12/10/2020 12/11/2020 12/12/2020 12/13/2020 12/14/2020 12/15/2020 12/16/2020 12/17/2020 12/18/2020 12/19/2020 12/20/2020 12/21/2020 12/22/2020 12/23/2020 12/24/2020 12/25/2020 12/26/2020 12/27/2020 0.653 0.519 0.449 0.474 0.448 0.510 0.535 0.531 0.544 0.503 0.538 0.541 0.490 0.549 0.652 0.545 0.556 0.849 0.618 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 1000 800 0.648 800 0.696 0.771 0.784 0.650 0.828 0.884 0.531 0.693 0.721 0.694 700 700 800 1000 800 1000 975 800 850 850 12/28/2020 12/29/2020 0.716 0.830 1000 1000 WATER RESTRICTION STAGE Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary Voluntary DATE 12/30/2020 TOWN OF BEECH MOUNTAIN BUCKEYE LAKE RESERVIOR INFORMATION 2020 TOTAL RAW WATER WITHDRAWN (MG) 0.690 HIGHEST WITHDRAWAL RATE (GPM) 1000 START TIME DS GAGE DS GAGE DS GAGE DS GAGE HEIGHT 1 FLOW 1 HEIGHT 1 FLOW 1 HOUR HOUR HOUR HOUR STOP TIME PRIOR PRIOR(CFS) AFTER AFTER(CFS) 1230am 300pm 2.29 11.2 RESERVOIR SURFACE ELEVATION (feet below spillway) WATER RESTRICTION STAGE 2.29 11.2 Iflowing over spillway Voluntary 12/31/2020 0.649 I♦ 1000 315am 315pm 2.33 ` 13.0 2.35 14.O1.Iflowingover spillway Voluntary RE: Buckeye Lake Reservoir Water Quality Certification #1756 Dear Ms. Homewood: In response to your letter of March 3, 2021, I am providing the requested information as follows. 1. In a letter to the Town dated August 19, 2020 the resource agencies recommended that the Town install a means to "pump around" in order to meet minimum downstream flows. Please provide information regarding what efforts has the Town made with regards to this recommendation. Response: In 2020 the Town had West Consultants, PLLC study this, to recommend a method of creating such a "pump around." A preliminary design using the existing raw water pump station was provided. The cost of the project is estimated to be $250,000. This project has been added to the latest recommended Capital Improvements Plan (CIP). The CIP is being considered now for adoption by the Town Council. If adopted, the project is scheduled to be implemented in 2023. Since there are so many projects that need to be completed to address the Town's water supply issues, not all of them can be constructed the same year. Other projects have taken a higher priority since they would provide separate source water and reduce demand, thus enabling the Town to discontinue or reduce withdrawals from Buckeye Lake during low stream flows. A pump around system would help meet minimum downstream flows for a few days, but due to the small volume of Buckeye Lake, the stored water would soon be depleted. In that case, downstream flows would be out of compliance and the water system would be unable to meet demand. By developing new sources of water, withdrawal from Buckeye Lake can be reduced or stopped when needed so that flow over the spillway meets the minimum. The higher priority projects that help meet this goal are the groundwater wells, the replacement of leaking water mains and services, and the construction of another reservoir (Lake Coffey) in the short- term. The Watauga River intake project will likely be the best long-term solution, but it is more feasible to implement these other projects sooner. 2. Please provide the following data for the calendar year of 2020 in spreadsheet format: a. Daily Water Use Data: Total daily volumes (gallons), highest estimated instantaneous withdrawal rate (gallons/min) daily, beginning and ending times of withdrawal, and the downstream gate reading one hour prior and one hour following daily withdrawal. b. Daily reservoir elevations (provide lowest level record per day). c. Daily Water Restriction Stage A spreadsheet with the requested data has been prepared and is attached to address A. and C. We do not currently have any reservoir measurement device installed. Visual record of this kept as "overflowing spillway" or "not overflowing" listed on the attached spreadsheet. Please let me know if you need other information or have any questions. Thank you for your assistance. Sincerely, Daniel Davis, Director of Utilities