Loading...
HomeMy WebLinkAboutSW6210201_Ryan's Run_Calculations_20210416Storm water Management Report April 14, 202 1 Ryan's Run Calloway Road Hoke County, NC Prepared for: Double D Engineering, PLLC 150 S. Page Street Southern Pines, NC 28387 910-684-8646 Prepared by: Triangle Site Design, PLLC 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 License#P-0619 TRIANGLE S I T E D E S I G N 0�'��u 11111 ritrry��r ��`� ►� C A R 0 rrrr . SEAL 051571 - TABLE OF CONTENTS OVERVIEW FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP WATER SURFACE CLASSIFICATIONS HUC NOAA POINT PRECIPITATION FREQUENCY ESTIMATES SHWT REPORT WATER QUANTITY -INFILTRATION BASIN #1 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION WATER QUANTITY -INFILTRATION BASIN #2 DRAINAGE AREA MAP DESIGN SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME-FLOW SUMMARY SCM SUMMARY TIME OF CONCENTRATION OVERVIEW This report contains the storm water management calculations for the proposed residential development Ryan's Run on Calloway Road in Hoke County. The project site is currently un—developed wooded area. The proposed site consists of 35.777 ac and approximately 8.474 ac will be disturbed as part of this project for the construction of the site improvements. There is approximately 1.524 acres of surface water area which results in approximately 34.253 acres of total project area. The majority of the proposed site is located in Flood Zone `X' as shown on FEMA FIRM Panel 3710848600J with an effective date of 10/17/06. The northern portion of the proposed site (approximately Lots 22-29) is adjacent to Flood Zone `AE' with a base flood elevation of 299.95 feet as shown on FEMA FIRM Panel 3710848600J with an effective date of 10/17/06. Flood zones are subject to change by FEMA. There are existing stream or wetland features on the proposed property. The proposed storm water management facilities (two infiltration basins) outlined in this report have been designed for post —development peak attenuation to treat the impervious areas of the development. Infiltration Basin#1 is designed to capture a drainage area of 22.50 ac with an impervious area of 5.57 ac. Infiltration Basin#1 is designed to receive existing off —site impervious areas along Calloway Road, 0.56 ac out of the 5.57 ac. Infiltration Basin#2 is designed to capture a drainage area of 12.71 ac with an impervious area of 5.82 ac. Infiltration Basin#2 is designed to receive 100% BUA for the existing off — site residential property areas along Calloway Road, 3.59 ac out of the 5.82 ac. The balance of the site is wooded and will by—pass the proposed SCM. The SCM is designed to treat a 1.0" storm event. Soils The County Soils Survey indicates that Autryville Loamy Sand, Blaney Loamy Sand, Candor Sand and Johnston Loam soils are present on the site. Impervious Area Summa[y Total Impervious Infiltration Basin #1 On -Site SF Acres Road 57,959 1.33 Sidewalk 12,026 0.28 Lots (37) (@4,00sf/Lots) 148,000 3.40 Total On -Site 217,985 5.01 Off -Site SF Acres 100% Build Out 24,393 0.56 IA 1 242,378 5.57 Total Impervious Infiltration Basin #2 SF Acres Road 23,142 0.53 Sidewalk 2,464 0.06 Lots 18) (@4,00sf/Lots) 72,000 1.65 Total On -Site 97,606 5.01 Off -Site SF Acres 100% Build Out 156,550 3.59 IA 254,156 5.82 Total Impervious SF Acres Road 81,101 1.86 Sidewalk 14,490 0.33 Lots (55) (@4,00sf/Lots) 220,000 5.05 Total On -Site 315,591 5.01 Off -Site SF Acres 100% Build Out 180,943 4.15 IA 496,534 11.39 FIGURES 35" 1'4YN E11&WE-Id P Hydrologic Soil Group —Hoke County, North Carolina 3 3 N iy Map Sole: 1:4,0901f pdnted on A pabat (8S' X 11') sheet. N . I Metiers 0 50 100 20D 300 Feet 0 150 300 600 900 k Map pmJedlon: Web Mercator Gxner madnates: WGS84 Edge tics: UTM Zme 17N WGSM 35° 1'4Y'N 35" 1' W N "W' Natural Resources Web Soil Survey 4/122021 Conservation Service National Cooperative Soil Survey Page 1 of 4 G z w w J a O O O (h 7 m o v d N m 10 M Vi (D 'O MC>, O _° O 1/1 O_ mZ V 0 U O L N 7 E 03 N O 70 C C E d �p U j 0 E N-0 N w N � a N = y N 0. C U 0] N .n w C •� U l6 E rq N l0 E N a °a E N l0 07 -p E MO' � 10 N .L-� (D (0 N O' C a N 7 d (n U M � O 75 N 0/ U N cc C N C 0) L Z p O N N` Q' O O .L. �L-' 3 0) EO 3 O C.LO,t a C d N- N 10 Q UN O -� t d QO fop Q3 Co E U w m aL�F O m L u�,� p U 10 t N L In C 41 f0 o O 3 O C N N 0) O Q ° > woo w aMi �w d T N U �I a N ° O ma nE E m •� 0) d _ C> _ C 07 O L C ° O N r2 01 ._ C U C Z N A E p O L C p v O. M a, E Ul 0) 10'aN 7 to U O fn C N L N L p ° >. M 01 O p ° y f` 2 O` U N aC ° N N l`0— Y N O> N d N a L C L l0 E N.L- E O. 6 O l0 .7,J W Q' (°n L Q U C 0) w = 10 N 01 O 0 N 0 d (p O E C .L-. .0 Z >` d aw L W N f0 c 01 rn E 7 y C Z N— IO p� m 0 V >. o a m O (n C l0 N N y E O p M 7 (n (� °' 7 .O 7 Q 0) w '� 7 v L C a m E w i �' —' E d _ E m c�i v ° v Eq v Q O a0 0 ° pO O c rn�$� ; o> L >>. �_ mg E_ N °� Z0, N C N 0) C 07 C O U 0) N 7 07 ° O O M O y U p Ul L" Z 0 7 O O LO w M O v E 05 L O L �r rj W E_ U'o a E (nU O. 'OQ 10 H O (O(n (nr ON UM m m m 0 N m m U 3 rn n O C = N '0 U o o �° a 0 NEo N N N O U (J 6 o Z fn C o OfD Co.m 2 -j 9 Q � c ° ■ ■ ■ o w LL r c 1Co C B > 0 0 N N C O C O O O 6 S C a a)mQ N C mQ a m m C) C)o z m< a m m () C)o z a m m W C C C 0 o t o.... w �o�o❑❑❑e©❑ N N Z 7 CO Hydrologic Soil Group —Hoke County, North Carolina Hydrologic Soil Group Map unit symbol I Map unit name �T AuA Autryville loamy sand, 0 A to 2 percent slopes Blaney loamy sand, 2 to C 8 percent slopes BaB BaD Blaney loamy sand, 8 to 15 percent slopes C CaB Candor sand, 1 to 8 percent slopes A JT Johnston loam A/D W Water Totals for Area of Interest Natural Resources Conservation Service Rating Web Soil Survey National Cooperative Soil Survey Acres in AOI Percent of AOI 27.1 69.4% 4.5 11.5% 5.0 12.7°6 1 0.21 0.4% J 0.9 2.3% y 1.4 3.6% 39.1 100.0% 4/12/2021 Page 3 of 4 yts !y okOJ �V � ,ml .11-j Fiv� - ' pia . �'��EOs►�YRC I x + C 70 m N m O _O LL m m d m c a N C E m a X m m C E m w m 2 NL Wa3mmm N�oe•GN Tm° LLC mmc oLm C0N m moS m ��fm mWyo = m' UmO II°I iI I I z tQOE am ymY E 0 mJmo m0>(p0 N.n m mY�m a n c m J LL C; O m z as W. dw m c m Nd HcVmO c j C ID ID 0 w0 °0 Co 2R oY oo : a 8p A LL a2R -1aN N O c O O E O `am2 U LL (aLCC mc m LE > 'Q a aQ m m m m C E p— am2O E N.0 0- cm 62. ORUmmmm_ CD CL Lcm N �aE�wo w o a mo cmmWLfLOO i 0 m m pIWL m U ON L ° m P CL IO m 1� � C E m U m E a > m 10 > ° anm m N cN m > m Om O 2 O C N m �LLmQO Oa m LL U Q 2 Z Or- W O EM2 c C LUE L 0-0 am L E mcm(m?a m m a a ID a '2 m a Mn m 9 p y Z u a m N m pQ LLcO JmuJ EJa g Ea NZ `c Lu mOw WW Eomcm E Za 0 w o -U Z O. o m >-0 am m N a 0 m 21 , ca yi wOQ d 4~)rcL io w 0� " Q t .m t� t 3 m w E m s m noLr C '0 w W OOa. r a m ~ m 3 m n H m m LL J mx ri o 0 0 0 10 N O 0 LO 0 0 0 0 0 LO 0 LO N fl Cb m c t 2 � s &� Iqo v� m § § .! 7� a }\ )©co \ E E- N k } I ƒ ƒ } / LL Nmrace, 10 x 9 Q b b o g 8 , p o ❑ n 8 i ❑ s ❑ d ❑Lw 06 ad 1 u ❑ � 1/11/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA* Latitude: 35,01110, Longitude:-79.3159* � M Elevation: 390.38 ft** ' source: ESRI Maps " source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M Bonnin, D, Martin, B. Lin, T Parcybok, M Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 t7uration Average recurrence int(years) �,�� 100 200 500 1000 7427F-20-0 5allin -797 (0 398-0482 Q.4$70.0 569 0.547-O..663 0.604.0532] 0.6071-0 815 (0 874) l(U.76 -0 931 .803E-098G 0.850--1.05 0.886-1 11 10{rlin 80 0 636 0 769 0.75 91❑ 0.877-1 06 0.967---16.17 1.0711830 1. 5-21739 1.213548 1 274356 1.345267 (1 0---1.74) 15{rlin 0.79 -0 962 0 946 14.14 1.11-1.34 1. 2--31548) 1.36--1065 1 5--1,7fi 1.531,87 1.6181.97 (1.699110) I(1 75 2.19 1.20 1.43 1.73 1.95 2.22 2.42 2.62 2.80 3.04 3.22 30�TIin 1 09-1.32 1.31-1.58) (1.58-1.91) (1 77-2 15) (2 01-2.44 2 19-2 66 (2.35-2 87) (2.50-3.07 (2 69-3.34) (2.84-3.54 1.49 1.80 2.22 2.64 2.96 3.28 3.60 7 3.93 4.37 4.71 60�rlin 1 36-1 64 (1 64-1 98) 1 (2 02-2.5) 2.31-2 79 12.67.3.2 2 96-3 60) 11 (3.23-3 95) (3 51-4.30) (3 86-4.79) (4 14-5 17 7-1-.74-71 2.11 1 2.65 7 3.06 3.62 4.06 7 4.50 7 4.96 5.57 6.06 2-hr 1 58-1 94 1,91-2 35) (2.40-2.95) (2 76-3 41) (3 25-4 02 3,63-4.51 4.00-5.00 (4,37-5.50 4 87-6 1B ) 5.25-6.72 1.84 2.23 2.82 3.28 3.92 4.45 4.99 5.56 6.36 7.00 3-hr (1 67-2.06) (2.02-2.50) (2.55-3.14 (2 96-3,66) (3 51-4 36 ) ( 3 96-4 94 ) ( 4.41-5 53 ) ( 4.87-6.16 ) ( 5.51-7 05 6.00-7.76 ] 9 2 2 4 6-hr 1 99 244 2 2-2 95) 3.05 3672 154 434 4. 2 5.19 (4 8 589) (5.32 6 62) 5. 9�7..39) 6.688 48 7 0.9 38 9 6 45 12-hr 2.34 288) (2.84-3.49 .3.60-4.42 40 5 . 18 � 4 5. 4 624 5. 11 3 &.41 8.04 4-9.04 8. 5--10.5 8.96.111 7 3.05 3.69 4.67 5.45 6.52 7.37 8.25 9.17 10.4 11.4 24-hr 2.83-3 30) 3 42-4.00 4.32-5.06 5 02-5 89 5 99-7 04 (6 76-7 96) 1 (8 36-9.90) 9 46-11.3 10.3-12 4 29-7 2�ay 7- 2 3. 0--r8 82) 3.98 4861 4 95779) (5. 8-6 71) 6. 647.99 7 781-9.01) 8,59 0 1) 9.48-141.2 10 ,7 11.7---13.9) 3 day 3.51 4603 4.23.4-M 5 27.6.06 (6 9---7501 7 0 8732 8 9 9.37 t8.99-0.51 (9 91--111 6) (11 2-13.1 (1212- 4.41 3.98 4.79 5.94 6.86 8.12 9.13 10.2 11.2 T-1-2--77I 13.9 4{tay 3 73-4 25 (4 48-5 11) 11 (5 55-6 34) (6 40-7.31) 1 (7 55-8 66 8.46-9 73 9,39.1 0.$ (10 3-12 0) 11 6-13.6 (12 6-14 8 4.61 5.51 6-16 7.75 9.11 10.2 11.3 12.5 14.0 15.3 7�ay (4 31-4 93) (5.16-5.89) (6.32-7.23 7 23-8 29) (8.48-9 74) (S 46-10.9) 10 5-12.1 (T1.5-13.3) (12.9-15.0) (14.0-16.4) 10�Jay 4.98 5962 5,93 6.70 7. 6 8,00 8. 8 941 T 9 (39-10 6 10 4- 1.8 11 4�13.0 12,4- 42 13,74--15.8 14,8-107 1 ] 7.11 8.41 10.00 11.2 12.9 14.2 15.5 16.9 18.7 20.1 20�ay 6.72-7.53 7.95-8.91 9.43.10.6 10.6-11.9 12 1-13.7 13.3-15 1 14 5-15.5 15.7-17 9 17.3.19.9 18 6-21.4 30{iay 4 B 5 -9.34 (9 85--141.0 1115-12.9 i 2.8- 4.3 14 6.2 15,7617 6 16.9- 9.1 (1 29 0.5) (19 8, 2.5 21-0- 4 0 11.2 13.1 15.1 16.6 18.5 20.0 21.4 22.8 1 24.7 26.1 45�ay (10 6 11.8) (12.4-13.8) 14 3-15 9) 1 (15 7-17 5) (17.5.19.5) 1 (18 B-21 1) 20.2-22 6) 21.5-24.1 23 1-26.1j (24.4--27 7) 5.7 60�ay 12,73 4.1 1419 16.5) (1619- B 7) (1819 0 5 20 4, 22 7) 21?9-24 41 23.426 0) (242627.7 26�5- 9 8) (2728-31 4 t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values Please refer to NOAA Atlas 14 document for more information Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0116&Ion=-79.3159&data=depth&units=english&series=pds 1/4 Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 Double D Engineering, PLLC Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines, NC 28387 April 7, 2021 Re: Seasonal High -Water `fable Identification and Soil Infiltration Rates: Ryans Run; Hoke County NC Calloway Road Soil conditions and infiltration rates were evaluated and measured on the above -referenced property within the proposed storm water BMP devices. Work was conducted in accordance with Parts A-2 and C- 1 of the North Carolina Department of Environmental Quality Stormwater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with a chroma of 2 or less (in Munsell color notation) in mottles or the horizon matrix. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table (SHWT). SATURATED HYDRAULIC CONDUCTIVITY KS , Soils evaluated on this property are typical of those within the Blaney Loamy Sand series (BaB, BaD) and the Vaucluse Loamy Sand series (VaB). These soil series consist of deep, well drained soils with varying rates of permeability. Infiltration rates were measured to determine if soil conditions were suitable for the installation of stormwater infiltration trenches. Infiltration rates were measured using a Johnson Constant Head Permeameter. Measurements were recorded at varying intervals until equilibrium was reached. A summary of observations within the proposed Stormwater BMP Device is shown in the table below. BMP Device Site #1 SHWT Munsell Color KS„ K�at K_sal (inches below Notation (0-30"; SL) (30-48"; SCL) (48-96"; SCUSC ground surface mixed mineralogy) with capillary fringe ad'ustment 90" (7.5') (SHWT 2.5Y 8/1 18" / hour .8" / hour Not Measured elevation 292.5') 2.5Y 7/1 Scott Cole, NCLSS 312 Copples Road Ext Ashehoro, NC 27205 (336) 460-4554 BW Device Site #2 SHWT Munsell Color Ksa( Ks.t &.1 (inches below Notation (0-48"; SL) (48-80"; SCL) (80-100"; SCL/SC ground surface mixed mineralogy) with capillary frin a adjustment 96" (8') (SHWT 2.5Y 8/1 18" / hour .8" / hour Not Measured elevation 300') 2.5Y 7/1 CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however, methods used to measure these rates can influence the results. Side walls of the bore hole are "smeared" by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on -site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank _yau, C —Q- Scott Cole North Carolina Licensed Soil Scientist ) 26 1 r00 } 0j 8 .ESJL:A UWE SE4280001008 1276-592 20Q;ED R20 P* \ eO \ P COUNTY `=5 SIGN S1�'� EASENa7i{� SO' R. F1T•. 10' x 70, SIGE1� DWANCE (TYP.) - W.W CAMDTON 5e4R60OM237 900-238 7ONEO R20 INL e' ', RAnIAe£ IONS. i1471 ANC IOUE O 5 �R rn N sK PW.k5 STORk O ALIAV TA5Eli'n'F +er tl t37ensver: �ttcrA�o Stlu t �1- t BMP Site #1 SHWT: 90" (7.5') bgs \ SHWT Elevation: 292.5' Ksat 0-30" SU 18" I hour f Ksat 30-48"" SCL: .8" 1 hour 9 Ksat 48-96" SCL mixed min: Not Measured +;+i /Z ifai�AWA IRl;ca�d L��� tl 8'STll7E{ O�Ii6T��'1N I "- i 3 y' r r G9E-f�1 2OIIFA R7J /r BMP Site #2 SHWT: 96" (8') bgs SHWT Elevation: 300' Ksat 0-48" SL: 18" 1 hour Ksat 48-80" SCL: .8" 1 hour Ksat 80-100" SCL mixed min: Not Measured tv 3 f.ORTH \ say%epnDlpn NSLLN TURIWR ` OPEN,3J1 SPACE 've 190vnullpy OSI 7aL-167 7m+i0 R2C yfANLtY \ 55"GCl1 rT W-0Gf]]3[na 1/,Ipy 17'LLUNi t[ n Rio 42$-N071117 AYc2 wiff R t0 42D DRUNA:E —CA9E71 ENT AND P[ MAHT %t VAM .;RkLE rm OLUERT tlUFFROAN 91149 50071150 W-141 ZONED R20 x 2T r� LOPS 1e-2- SHALL NANTAIN A 30' WCOATL0 ewER —DLTIM 9U17FAa wATwm AND ALL UPERVC-3 SIRFACLS AND HfD7F p+An['. FERYW=I+: 5!ORV DRAMAS- 11,, h,¢rnlrO %roil 1 '`{ FERhfAryENI ST1CRQ DRAWCE �SY ->: ASrJ1aAr SWuEauurthr swE wF* ' ``;40&' ; scl SHWT 4, WIpFIII HL7FFIA`I riYRE LAMA• SBa9filDOtl.11 '71]-797 � � iDIF,O hEL [dPAl 'CrA: ;E{7! iO22 I!i-1 I•]Il[O A.p 1ouble - o1 inch = 200 feet RY RUN �� 1 nr-,iriacmkir�r�i ri i t� n n 78.a HOKE COU Y. NO TH CAROLINA A WATER QUANTITY -INFILTRATION BASIN #1 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Ryan's Run 2 Project Area ac 35.777 3 Coastal Wetland Area ac - 4 Surface Water Area ac 1.524 5 Is this project High or Low Density? High 6 jDoes this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks 2rovided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on thisproject? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 2 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 Bayfilter 0 _225 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 1 Name and Title: Carlo Pardo, PE 28 Organization: _ _ Street address: Triangle Site Design, PLLC 29 4004 Barrett Drive, Suite 101 30 City, State, Zip: Phone number(s): Email: Raleigh, NC 27609 31 919-553-6570 32 cpardo@trianglesitedesign.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ,j X1111nrirrlll 1 C A Rn�. oe SEAL _ 051571 91 Signature of Designer --� I 1� Date DRAINAGE AREAS 1 Is this a hi h density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - Infiltration Basin Infiltration Basin 5 Total drainage area (sq ft 1533633 979923 553710 6 Onsite drainage area (sq ft 1352690 955530 397160 7 Offsite drainage area (sq ft 180943 24393 156550 8 Total BUA in 2roject (sq ft 496534 242378 sf 254156 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 315591 217985 sf 97606 sf 10permitting) New BUA not on subdivided lots (subject to s 11 Offsite BUA (sq ft 180943 24393 sf 156550 sf 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft - Sidewalk (sq ft 14490 12026 sf 2464 sf - Roof (sq ft 220000 148000 sf 72000 sf - Roadway s ft 81101 57959 sf 23142 sf _ -Future (sq ft) - Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided lots (sq ft 13 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15 Existing BUA that will remain (not subject to permittinW.s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 32% 25% 46% 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM cu ft 22261 cf 21369 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the draina a area(s): INFILTRATION SYSTEM 1 Drainage area number 1 2 2 1 Minimum reauired treatment volume (cu ft) 22261 cf 21369 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10 ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 jDoes the SCM follow the devicespecific MDC? Yes Yes 17 lWas the SCM designed by an NC licensedprofessional? Yes Yes NFII TR ATIDN GVSTFM MDr FRr1M n7i4 l n97 sooff- 18 jProposed slope of the subgrade surface (%) 0% 0% 19 1 Are terraces or bafflesprovided? No No 20 Type of pretreatment: Forebay Forebay I tnilc Dnta 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes Yes 22 SHWT elevation fmsl) 292.50 300.00 23 Depth to SHWT per soils report in 90.00 96.00 24 Ground elevation at boring in soils report (fmsl) 300.00 308.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes Yes 26 Soil infiltration rate (in/hr) 18.00 18.00 27 Factor of safety (FS) (2 is recommended): 2.00 2.00 IElevations I For Trenches Onlv 34 Length (ft) 35 Width (ft 36 Perforated pipe diameter, if applicable inches 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosi %) 41 Is stone free of fines? 42 Is the stone wrappedin geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 IDesign volume of SCM (cu ft 22261 cf 21369 cf 45 1 Time to draw down hours 72 hrs 72 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 2:17 PM 4/14/2021 r- .r L� Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #1 Drainage Area (acresZ 22.50 Existin4 soil Groups: Soil Group Map Symbol Soil Descriotion Acres Percent of DA A AuA Autryville Loamy Sand 20.11 89% A CaB Candor Sand 0.20 1% C BaD Blaney Loamy Sand 1.33 6% A/D IT Vaucluse Loamy Sand 0.86 4% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted GN Wooded - Good Stand A 19.98 50 44.4 Wooded - Good Stand C 1.33 73 4.3 Impervious - Dirt Road A 0.63 77 2.2 Off -Site Calloway Road A 0.56 98 2.4 Cumulative Curve # = 53.3 Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions to Infiltration Basin #2 Oraina e�(acres): 22.50 Existing Soil Groups: Soil Grout/ Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 20.11 89% A CaB Candor Sand 0.20 1% C BaD Blaney Loamy Sand 1.33 6% A/D IT Vaucluse Loamy Sand 0.86 4% Proposed Land Uses Land Use Description Existing Soil Group Acres Curve # Weighted CN Impervious Area -Residential Lots A 3.40 98 14.8 Impervious Area-Sidewalk/Road A 1.61 98 7.0 Open Space - Good A 15.60 45 31.2 Open Space - Good C 1.33 74 4.4 Off -Site Calloway Road A 0.56 98 2.4 Cumulative Curve # = 59.8 Infiltration Basin lesion Site Information Sub Area Location: Drainage To Infiltration Basin #1 Drainage Area (DA) = 22.50 Acres 979923 sf Impervious Area (IA) = 5.57 Acres 242378 sf Percent Impervious I = 24.7 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.27 in/in Water Quality Volume = 0.511 ac-ft Water Quality Volume = 22,261 cf Water Quality Volume = 0 273 inches of runoff NOAA 1- ear, 24-hour event = 3.05 inches Minimum Surface Area SA = (12-FS"DV)/(K"T) Factor of Safety (FS) = 2 Design Volume (DV) = 22261.4 cf Hydraulic Conductivity of Soil = 18.00 in/hr Max Dewatering Time = 72 hours SA = 412.2 sf STAGEZSTORAGE TABLE INFILTRATION BASIN STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 299.0 19495 0 0 1.0 300.0 22100 20798 20798 2.0 301.0 24770 23435 44233 3.0 302.0 27490 26130 70363 4.0 303.0 30270 28880 99243 STORMWATER MANAGEMENT DESIGN INFILTRATION BASIN RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: LUMBER MOUNTAIN CREEK 14-2-16-(2) C 03040203 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 22.5 ACRES SITE IMPERVIOUS AREA TO POND: 5.01 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.56 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 5.57 ACRES PRE -DEVELOPED POST -DEVELOPED DRAINAGE AREA: 22.5 AC 22.5 AC CURVE NUMBER: 53.3 59.8 INFILTRATION RATE: 18.0 IN/HR 1.0" STORM EVENT: 0.000 CFS 1-YEAR STORM EVENT: 0.905 CFS 6.741 CFS 2-YEAR STORM EVENT: 3.573 CFS 15.46 CFS 10-YEAR STORM EVENT: 19.20 CFS 48.11 CFS 100-YEAR STORM EVENT: 57.39 CFS 112.60 CFS POST DEVELOPED 0.000 CFS 0.000 CFS 0.000 CFS 0.000 CFS 67.12 CFS Hydrograph Report 8 Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name Max. Elevation = 302.10 ft Max. Storage Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A (hrs) cfs ft cfs cfs cfs cfs cfs Wednesday, Apr 14, 2021 = 67.12 cfs = 12.13 hrs = 80,641 cuft = BMP Pond = 72,822 tuft ( Printed values - 1 00% of Op ) Wr B Wr C Wr D Exfil Outflow cfs cfs cfs cfs cfs 11.97 102.53 301.08 ----- ----- ----- ----- 3.977 ----- ----- ----- 10.41 3.977 12.00 112.50 301.46 -- ----- ----- ----- 22.02 --- ----- ----- 10.85 22.02 12.03 112.60 << 301.78 ---- - --- ----- ----- 42.95 ----- ----- ----- 11.20 42.95 12.07 103.23 301.99 ----- -- - ----- ---- 59.12 ---- ----- ----- 11.44 59.12 12.10 88.17 302.08 ----- ----- ----- ----- 66.59 ----- ----- ----- 11.55 66.59 12.13 71.67 302.09 << ----- ----- ----- ----- 67.12 ----- ----- ----- 11.55 67.12 << 12.17 56.34 302.03 ----- ---- ---- _---_ 62.78 ----- ----- ----- 11.49 62.78 12.20 42.89 301.94 ----- ----- ----- --- 55.29 ----- ----- ---- 11.39 55.29 12.23 32.09 301.83 ----- ----- ----- -__-- 46.49 ----- ----- ----- 11.26 46.49 12.27 24.85 301.71 ----- ----- ----- ----- 38.11 ----- ----- ----- 11.13 38.11 12.30 21.07 301.61 ----- ----- --- ---_- 31.02 ----- -_--- ----- 11.01 31.02 12.33 19.47 301.52 ----- ----- ----- ----- 25.51 ----- ----- ----- 10.91 25.51 12.37 18.62 301.45 ----- ----- ----- ----- 21.35 ----- ----- ----- 10.83 21.35 12.40 17.76 301.39 ----- ----- ----- ----- 18.10 ----- ----- ----- 10.77 18.10 12.43 16.89 301.35 ----- ----- ---- ----- 15.63 ----- ----- ----- 10.71 15.63 12.47 16.00 301.31 ----- - -- ----- ----- 13.51 ----- ----- ----- 10.67 13.51 12.50 15.11 301.27 ----- ----- ----- ----- 11.83 ----- ----- ----- 10.63 11.83 12.53 14.22 301.24 - - ----- ----- ----- 10.34 ----- ---- ----- 10.59 10.34 12.57 13.38 301.21 ----- ----- ----- ----- 8.979 ----- ----- ----- 10.56 8.978 12.60 12.61 301.18 ----- - _ ----- ----- 7.845 ----- ----- ----- 10.53 7.845 12.63 11.95 301.16 ----- ----- -.-.- ____ 6.848 ----- --- ----- 10.50 6.848 12.67 11.42 301.13 ----- ----- ----- ----- 5.922 ----- ----- -- 10.47 5.921 12.70 10.98 301.11 ----- ----- ----- ----- 5.071 ----- ----- ----- 10.45 5.071 12.73 10.63 301.09 ----- -- ----- ----- 4.375 ----- ----- - -- 10.42 4.375 12.77 10.35 301.07 ----- ----- - -- ---- 3.820 ----- ---- ----- 10.40 3.820 12.80 10.11 301.06 ----- ----- ----- ----- 3.305 ----- ---- ---- 10.38 3.306 12.83 9.898 301.04 ----- ---- ----- ----- 2.831 ----- --- - - --- 10.37 2.831 12.87 9.694 301.02 ----- ----- ----- ----- 2.392 ----- ----- ----- 10.35 2.393 12.90 9.490 301.01 ----- ----- ---- ----- 1.987 ----- ----- ----- 10.33 1.987 12.93 9.284 301.00 ----- ---- ----- ----- 1.622 ----- ----- --- 10.32 1.622 12.97 9.076 300.99 ----- ----- ----- ----- 1.399 ----- ----- --- 10.30 1.400 13.00 8.868 300.97 ----- ----- ----- ----- 1.179 ----- ----- ----- 10.29 1.179 13.03 8.660 300.96 ----- ----- ----- ----- 0.961 ----- ----- ----- 10.27 0.962 13.07 8.459 300.95 ---- ----- --- ----- 0.746 ----- ----- ----- 10.26 0.746 End )I, \I fyNa- A-D `oak 13,09 hr7 -1V99 hrs= 1-� 1ic-S -`.1 o a > rs Z O H Q W J W 3 M J J d N f— Z W M Y Z Z <O O M W W O M LA- J O W d O h Z Z Q a �L� W 3=v z 3h y MCC C-i Q ti N N iv 3 ca N m N S, C� W Z Cl- O OJ (J 1n LNG 3 c c� OJ N Li C cp zt r _o 3 ~ >' C-3 J N 1�� z H 3 O OO � Q C.7 Z_ J_ Z � J N O LL- Z O W W s� a� T 2 L7� J H W Q Q ;T; m V) Q Q Or W Q 0 W mo J r 2 Q CN O O Z p QW O m z J d N LW Z a- O O N O W V) p N 0 CD 4/14/2021 ECMDS 7.0 NORTH AMERICAN GREEN SPILLWAY ANALYSIS > > > Grass Spi1v�a _ Name Grass Spillway#1 Discharge 67.12 Peak Flow Period 1.2 Channel Slope 0.5 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 I Normal Permissible Calculated Safety Staple j Phase Reach I Discharge Velocity Mannings NI Remarks) J Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 67.12 cfs 15.44 ft/s 0.22 ft 0.024 8.5 Ibs/ft2 6.79 Ibs/ft2 1.25 STABLE G P550 Unvegetated Underlying Straight 67.12 cfs 15.44 ft/s 0.22 ft 0.024 8.05 Ibs/ft2 6.64 Ibs/ft2 1.21 STABLE G Substrate Shoremax w/ Straight 67.12 cfs 16.19 ft/s 0.21 ft 0.022 14 Ibs/ft2 6.46 Ibs/ft2 2.17 STABLE G P550 Reinforced Vegetation Underlying Straight 67.12 cfs 16.19 ft/s 0.21 ft 0.022 8.5 Ibs/ft2 6.33 Ibs/ft2 1.34 STABLE G Substrate https://ecmds.com/project/142852/spillway-analysis/202385/show# 1/1 Pond Report 5 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Wednesday, Apr 14, 2021 Pond No. 1 - BMP Pond Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 299.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 299.00 19,495 0 0 1.00 300.00 22,100 20,798 20,798 2.00 301.00 24,770 23,435 44,233 3.00 302.00 27,490 26,130 70,363 4.00 303.00 30,270 28,880 99,243 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrtRsr] [A] [B] [C] [D] Rise (in) Inactive Inactive Inactive Inactive Crest Len (ft) = 2000.0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 300.90 0.00 0.00 0.00 No. Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 18.000 (by Contour) Multistage = n/a No Yes No TW Elev. (ft) = 0.00 Stage (ft) 4.00 3.00 2.00 We 0.00 0.0 20.0 Total Q Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 40.0 60.0 80.0 100.0 120.0 140.0 160.0 Elev (ft) 303.00 302.00 301.00 300.00 299.00 180.0 Discharge (cfs) 1 H yd ro g ra p h Summary Re pcaflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Peak Time Time to HI No. type flow interval peak Vol (origin) (cfs) (min) (min) (ci 1 SCS Runoff 0.905 2 746 2 SCS Runoff 6.741 2 724 3 Reservoir 0.000 2 764 5 SCS Runoff 0.000 2 n/a 6 1 Reservoir 0.000 2 n/a 13, 29,1 0 0 0 Infiltration1.gpw I Rei Hydrograph Report 2 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs SCM Pre -Developed Wednesday, Apr 14, 2021 Peak discharge = 0.905 cfs Time to peak = 746 min Hyd. volume = 13,455 cuft Curve number = 53.3 Hydraulic length = 0 ft Time of conc. (Tc) = 25.60 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 1.00 I 1.00 0.90 I - 0.90 0.80 0.80 0.70 0.70 0.60 - 0.60 0.50 - 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs wc 5.00 4.00 3.00 2.00 1.00 SCM Post -Developed Hyd. No. 2 -- 1 Year Wednesday, Apr 14, 2021 Peak discharge = 6.741 cfs Time to peak = 724 min Hyd. volume = 29,058 cuft Curve number = 59.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Q (cfs) 7.00 N. 11 5.00 4.00 K M 2.00 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD@ Civil 3D0 2009 byAutodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow mm 5.00 4.00 3.00 2.00 1.00 4 Wednesday, Apr 14, 2021 Peak discharge = 0.000 cfs Time to peak = 764 min Hyd. volume = 0 cuft Max. Elevation = 299.23 ft Max. Storage = 4,771 cuft Post Through SCM Hyd. No. 3 -- 1 Year Q (cfs) 7.00 . IX 5.00 4.00 3.00 t• I X 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 4,771 cult Hydrograph Report HydraFlow Hydrographs Extension forAutoCAD® Civil 3DO 2009 byAutodesk, Inc v6.066 Hyd. No. 5 1.0 Post -Developed to SCM Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 1.00 in Storm duration = 6.00 hrs Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 Wednesday, Apr 14, 2021 Peak discharge = 0.000 cfs Time to peak = n/a Hyd. volume = 0 cuft Curve number = 59.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = SCS 6-Hr Shape factor = 484 1.0 Post -Developed to SCM Hyd. No. 5 -- 1 Year 20 40 60 80 100 Hyd No. 5 Q (cfs) - 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 120 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for AUtoCAD® Civil MID 2009 by Autodesk, Inc. v6.066 Hyd. No. 6 1.OinPost Through SCM Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 5 - 1.0 Post -Developed to SCM Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 600 Hyd No. 6 Wednesday, Apr 14, 2021 Peak discharge = 0.000 cfs Time to peak = n/a Hyd. volume = 0 cuft Max. Elevation = 299-00 ft Max. Storage = 0 cuft 1.0inPost Through SCM Hyd. No. 6 -- 1 Year Q (cfs) 0.10 - 0.09 0.08 0.07 0.06 - 0.05 0.04 0.03 - 0.02 --� 0.01 0.00 1200 1800 2400 3000 3600 4200 4800 5400 6000 Hyd No. 5 ® Total storage used = 0 cult Time (min) 9 Hydrograph Summary Re p aflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 3.573 2 734 28,208 - - -- SCM Pre -Developed 2 SCS Runoff 15.46 2 722 51,083 ----- ---- ------ SCM Post -Developed 3 Reservoir 0-000 2 804 0 2 299.52 10,818 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 ----- ---- ------ 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 299.00 0.000 1.OinPost Through SCM I Infiltration1.gpw Return Period: 2 Year Wednesday, Apr 14, 2021 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency 2 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.69 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 0.00 0 120 240 Hyd No. 1 SCM Pre -Developed Hyd. No. 1 -- 2 Year 360 480 600 720 840 IT, Wednesday, Apr 14, 2021 Peak discharge = 3.573 cfs Time to peak = 734 min Hyd. volume 28,208 cuft Curve number = 53.3 Hydraulic length = 0 ft Time of conc. (Tc) = 25.60 min Distribution = Type II Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 31DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.69 in Storm duration = 24 hrs SCM Post -Developed Hyd. No. 2 -- 2 Year 15.00 12.00 • wl . M 3.00 Wednesday, Apr 14, 2021 Peak discharge = 15.46 cfs Time to peak = 722 min Hyd. volume = 51,083 cuft Curve number = 59.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Q (cfs) 18.00 15.00 12.00 M 3.00 0.00 I I I r 1 1. _ I , I I-- - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 r Hyd No. 2 Time (min) Hydrograph Report 12 Hydraf low Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Wednesday, Apr 14, 2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 804 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post -Developed Max. Elevation = 299.52 ft Reservoir name = BMP Pond Max. Storage = 10,818 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 18.00 15.00 12.00 • el H. 11 3.00 Post Through SCM Hyd. No. 3 -- 2 Year Q (cfs) 18.00 15.00 12.00 • IR II 1 3.00 0.00 -1 1 1 1 1 1L I -.. . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 3 Hyd No. 2 ® Total storage used = 10,818 cult 15 Hydrograph Summary Re p4 lyflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No, type flow interval peak volume hyd(s) elevation strge used description ` (origin) (cfs) (min) (min) (cuff) (ft) (tuft) 1 SCS Runoff 19.20 2 730 88,227 - — — ------ SCM Pre -Developed 2 SCS Runoff 48.11 2 722 131,112 — - - - - - SCM Post -Developed 3 Reservoir 0.000 2 738 0 2 300.82 40,045 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 — - 6 Reservoir 0.000 2 n/a 0 5 299.00 0.000 1.0 Post -Developed to SCM 1.OinPost Through SCM Infiltration1.gpw Return Period: 10 Year Wednesday, Apr 14, 2021 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 5.45 in Storm duration = 24 hrs 18.00 15.00 12.00 M Ma 3.00 SCM Pre -Developed Hyd. No. 1 -- 10 Year 16 Wednesday, Apr 14, 2021 Peak discharge = 19.20 cfs Time to peak = 730 min Hyd. volume = 88,227 cuft Curve number = 53.3 Hydraulic length = 0 ft Time of conc. (Tc) = 25.60 min Distribution = Type II Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 M . �� 3.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD® Civil 3D® 2009 byAutodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 5.45 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 20.00 10.00 120 '240 Hyd No. 2 SCM Post -Developed Hyd. No. 2 -- 10 Year 360 480 600 720 840 17 Wednesday, Apr 14, 2021 Peak discharge = 48.11 cfs Time to peak = 722 min Hyd. volume = 131,112 cuft Curve number = 59.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow. 40.00 30.00 20.00 10.00 w Post Through SCM Hyd. No. 3 -- 10 Year 120 240 360 480 Hyd No. 3 Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wednesday, Apr 14, 2021 = 0.000 cfs = 738 min = 0 cuft = 300.82 ft = 40,045 tuft 600 720 840 960 1080 Total storage used = 40,045 cuft Q (cfs) 50.00 40.00 30.00 10.00 0.00 1200 Time (min) 21 Hydrograph Summary Re p -'Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Hydrograph type (origin) SCS Runoff Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) -- Hydrograph description SCM Pre -Developed 57.39 2 730 222,447 •----- 2 SCS Runoff 112.60 2 722 294,724 — ------ --- SCM Post -Developed 3 Reservoir 67.12 2 728 80,641 2 302.10 72,822 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 - ------ --- 1.0 Post -Developed to SCM 6 Reservoir 0.000 2 n/a 0 Return Period: 5 100 299.00 0.000 1.0inPost Through SCM Infiltration1.gpw Year Wednesday, Apr 14, 2021 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Wednesday, Apr 14, 2021 Hyd. No. 1 SCM Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 57.39 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 222,447 cuft Drainage area = 22.500 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 25.60 min Total precip. = 8.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 1 MO 0.00 0 120 240 — Hyd No. 1 SCM Pre -Developed Hyd. No. 1 -- 100 Year 360 480 600 720 840 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 SCM Post -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 22.500 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.25 in Storm duration = 24 hrs 100.00 .1 I1 40.00 20.00 SCM Post -Developed Hyd. No. 2 -- 100 Year 23 Wednesday, Apr 14, 2021 Peak discharge = 112.60 cfs Time to peak = 722 min Hyd. volume = 294,724 cuft Curve number = 59.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Q (cfs) 120.00 100.00 .M1 40.00 20.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Storage Indication method used. Exfiltration extracted from Outflow. 100.00 F� KOX8141 0.00 0 120 - — Hyd No. 3 Post Through SCM Hyd. No. 3 -- 100 Year Wednesday, Apr 14, 2021 Peak discharge = 67.12 cfs Time to peak = 728 min Hyd. volume = 80,641 cuft Max. Elevation = 302.10 ft Max. Storage = 72,822 cuft 240 360 480 600 720 —• Hyd No. 2 Total storage used = 72,822 cuft Q (cfs) 120.00 100.00 80.00 AM 40.00 20.00 0.00 840 Time (min) !f | +. �# ! 2 {` | !- | }2 !2 k§(k{!! I} � k\ � �■ k # 2 ■ of B � §$/ !�a � ! (-� 22 k �! & k | � . ( §| | � � WATER QUANTITY -INFILTRATION BASIN #2 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Ryan's Run 2 Project Area ac 35.777 3 Coastal Wetland Area ac - 4 Surface Water Area ac 1.524 5 Is this pr2ject High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) IL 7 Width of ve etated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 2 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface DIS 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Carlo Pardo, PE 28 Organization: Triangle Site Design, PLLC 29 Street address: 4004 Barrett Drive, Suite 101 30 City,State, Zip: Raleigh, NC 27609 31 Phone numbers : Email: 919-553-6570 32 cpardo@trianglesitedesign.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ♦ � J SEAL 05157i r ' .......� 0IN 11� Signature of Designer 'AlHIRI Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - Infiltration Basin Infiltration Basin 5 Total drainage area (sq ft 1533633 979923 553710 6 Onsite drainage area �sq ft 1352690 955530 397160 7 Offsite drainage area (sq ft 180943 24393 156550 8 Total BUA in project (sq ft 496534 242378 sf 254156 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 315591 180943 217985 sf 24393 sf 97606 sf 156550 sf 10permitting) New BUA not on subdivided lots (subject to (sf) 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 14490 12026 sf 2464 sf Roof (sq ft 220000 148000 sf 72000 sf Roadway s ft 81101 57959 sf 23142 sf Future (sq ft Other, please specify in the comment box below Lsg ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 32% 25% 46% 19 Design storm inches 1.0 in 1.0 in 20 Design volume of SCM cu ft 22261 cf 21369 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Offsite DA - 100% Build -Out Potential for residentail homes along Calloway Road for DA#2. INFILTRATION SYSTEM f 1 Drainage area number 1 2 f 2 1 Minimum reauired treatment volume (cu ft) 22261 of 21369 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical" for trenches)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC 12 ? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes 18 Proposed slope of the subgrade surface (%) 0% 0% 19 Are terraces or bafflesprovided? No I No 20 [Type of pr treatment: Forebay Forebay WIC Data 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes Yes 22 SHWT elevation (fmsl) 292.50 300.00 23 Depth to SHWT per soils report in 90.00 96.00 24 Ground elevation at borino in soils report (fmsl) 300.00 308.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes Yes 26 Soil infiltration rate in/hr 18.00 18.00 27 Factor of safe FS 2 is recommended): 2.00 2.00 I Flpvafinns 29 Bottom elevation (fmsl) 299 ft 307 ft 30 Istorage elevation (fmsl) 301. ft 309. ft f 31 1 Bypass elevation (fmsl) 301.4 ft 310.9 ft For Basins only 32 Bottom surface area ft2 19495 ft 11530 ft 33 Storage elevation surface area(ft) 24770. ft 14290. ft For Trenches Only 34 Length ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity (%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port beenprovided? Vo/umes/Drawdown 44 IDesign volume of SCM (cu ft) 22261 cf 21369 cf 45 1 Time to draw down hours 72 hrs 72 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 1:54 PM 4/14/2021 Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Pre -Developed Conditions #2 Drainage Area (acresZ 12.71 ExistinQSoil Groups: Soil Grouo Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 6.27 49% A CaB Candor Sand 0.00 0% C BaB/BaD Blaney Loamy Sand 6.44 51% Existino Land Uses: Land Use Description Existing Soil Groff Acres Curve # Weighted CN Wooded - Good Stand A 5.23 50 20.6 Wooded - Good Stand C 0.16 73 0.9 Wooded - Fair Stand C 3.73 80 23.5 Off -Site 100% Build Out+Calloway C 3.59 98 27.7 Cumulative Curve # = 72.7 Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Post -Developed Conditions to Infiltration Basin #2 Drainage Area (acres): 12.71 Existing Soil Groups: Soil Grouo Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 6.27 49% A CaB Candor Sand 0.00 0% C BaB/BaD Blaney Loamy Sand 6.44 51% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Impervious Area -Residential Lots A 0.73 98 5.6 Impervious Area-Sidewalk/Road A 0.35 98 2.7 Open Space - Good A 4.15 45 147 Impervious Area -Residential Lots C 0.92 98 7.1 Impervious Area-Sidewalk/Road C 0.23 98 1.8 Open Space - Good C 2.74 74 16.0 Off -Site 100% Build Out+Calloway C 3.59 98 27.7 Cumulative Curve # = 75.5 Infiltration Basin Design Site Information Sub Area Location: _ Drainage To Infiltration Basin #2 Drainage Area (DA) = 12.71 Acres 553710 sf Impervious Area (IA) = 5.82 Acres 254156 sf Percent Impervious I = 45.9 % Required Water Quality Volume Design Storm = 1 inch Determine Rv Value = 0.05 + .009 (1) = 0.46 in/in Water Quality Volume = 0 491 ac-it Water Quality Volume = 21,369 cf Water Quality Volume = 0.463 inches of runoff IVOAA 1- ear, 24-hour event = 3.05 inches Minimum Surface Area SA = (12-FS-DV)/(K`T) Factor of Safety (FS) = 2 Design Volume (DV) = 21368 8 cf Hydraulic Conductivity of Soil = 18.00 in/hr Max Dewatering Time = 72 hours SA = 395.7 sf PLAN VIEW 1 M = ]D nLT STAGE/STORAGE TABLE INFILTRATION BASIN STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) AREA SF STORAGE CF STORAGE CF 0.0 307.0 11530 0 0 1.0 308.0 12880 12205 12205 2.0 309.0 14290 13585 25790 3.0 310.0 15760 15025 40815 4.0 311.0 17280 16520 57335 5.0 312.0 18860 18070 75405 STORMWATER MANAGEMENT DESIGN INFILTRATION BASIN RIVER BASIN: RECEIVING STREAM: STREAM INDEX: STREAM CLASS: HUC: LUMBER MOUNTAIN CREEK 14-2-16-(2) C 03040203 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 12.71 ACRES SITE IMPERVIOUS AREA TO POND: 2.23 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 3.59 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 5.82 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED THROUGH POND DRAINAGE AREA: 12.71 AC 12.71 AC CURVE NUMBER: 72.7 75.5 INFILTRATION RATE: 18.0 IN/HR 1.0" STORM EVENT: 0.168 CFS 0.000 CFS 1-YEAR STORM EVENT: 8.516 CFS 18.24 CFS 0.000 CFS 2-YEAR STORM EVENT: 13.23 CFS 26.67 CFS 0.000 CFS 10-YEAR STORM EVENT: 27.96 CFS 52.57 CFS 0.000 CFS 100-YEAR STORM EVENT: 54.03 CFS 96.89 CFS 71.72 CFS ■ ( ( E ■ . 9 1�| �. � �� ||B§ ! ! | 4 §E S 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Wednesday, Apr 14, 2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 71.72 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 63,024 cuft Inflow hyd. No. = 2 - SCM Post -Developed Reservoir name = BMP Pond Max. Elevation = 311.70 ft Max. Storage = 69,623 cuft Storage Indication method used. Exfltration extracted from Outflow. Hydrograph Discharge Table (Printed values >=100%ofQp) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs .' 1Rmo 96.89 << 311.20 -_- _ - ----- ----- 17.39 ----- -_ -- 7.334 17.39 1 94.93 311.55 ----- ----- 54.76 ----- -_ ----- 7.563 54.76 12.07 85.60 311.68 << --_-- ---- ----- ----- 71.72 -- -- ----- 7.648 71.72 << 12.10 72.10 311.68 --- - - ----- _- 71.40 -- - ---- - 7.646 71.40 12.13 57.81 311.61 ----- ----- ----- -_ - 62.69 - - ----- ----- 7.604 62.69 12.17 44.78 311.52 --- ----- ----- ----- 51.42 -- --- ----- 7.545 51.42 12.20 33.57 311.43 ---- --- -- - - - 40.28 ---- ----- ----- 7.483 40.28 12.23 24.76 311.34 ----- __-- __-- _-- 30.46 ----- ----- -- - 7.424 30.46 12.27 18.97 311.26 ----- --- ----- _- - 22.59 ----- ----- ----- 7.371 22.59 12.30 15.99 311.20 ----- ----- -- - -- 16.79 ----- ----- __- 7.329 16.79 12.33 14.73 311.15 ---- - - --- 13.20 ----- ----- -__- 7.299 13.19 12.37 14.04 311.12 - - --- ----- ----- 10.69 ----- ----- -- 7.277 10.69 12.40 13.36 311.10 ----- ----- ----- ----- 9.007 ----- ----- ----- 7.263 9.008 12.43 12.68 311.08 ----- ----- --- - ----- 7.927 ----- ----- ----- 7.251 7.927 12.47 11.99 311.06 --- ----- ----- ----- 6.981 ----- ----- ----- 7.240 6.981 12.50 11.30 311.05 ----- ----- -- - ----- 6.124 ----- ----- ----- 7.231 6.124 12.53 10.61 311.03 ----- ----- - -- ----- 5.326 --- - ----- - -- 7.222 5.326 12.57 9.966 311.02 ----- ----- -- - 4.576 ----- ----- ----- 7.214 4.575 12.60 9.379 311.01 ----- ----- ----- ----- 3.873 ----- ----- ----- 7.206 3.872 12.63 8.877 311.00 ----- ----- ---- ----- 3.247 ----- ---- - -- 7.199 3.247 12.67 8.466 310.99 ----- ----- ----- ----- 2.869 ----- ----- ----- 7.192 2.869 12.70 8.133 310.98 ----- ----- ----- ----- 2.494 ----- ----_ ---- 7.185 2.494 12.73 7.863 310.97 ----- ----- ----- ----- 2.136 ----- ----- ----- 7.178 2.136 12.77 7.643 310.95 ----- ----- ----- ----- 1.804 ----- ----- ----- 7.171 1.804 12.80 7.457 310.95 ---- ----- ----- ----- 1.500 ----- ----- ----- 7.166 1.500 12.83 7.293 310.94 ----- ----- ----- ----- 1-225 ----- ----- - 7.160 1.225 12 7 7.135 310.93 ----- ----- ----- ----- 0.976 ----- ----- - - 7.155 0.976 6.977 310.92 ----- ----- ----- ----- 0.747 ----- -- -- -__-- 7.151 0.747 ...End 1 , Me +,C> Ft3::i1/ r - 1,Q C)c_-> hr = 0 ^ 1.0 his 4/14/2021 NORTH AMERICAN GREEN' SPILLWAY ANALYSIS > > > Grass Spillway#2 ECMDS 7.0 Name Grass Spillway#2 Discharge 71.72 Peak Flow Period 1 Channel Slope 0.5 Channel Bnttom Width 40 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam (GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated safety Remarks Staple Depth j I Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 71.72 cfs 11.85 ft/s 0.15 ft 0.025 8.5 Ibs/ft2 : 4.73 Ibs/ft2 1.8 STABLE F P300 Unvegetated Underlying Straight 71.72 cfs 11.85 ft/s 0.15 ft 0.025 5.68 Ibs/ft2 4.69 Ibs/ft2 1.21 STABLE F Substrate Shoremax w/ Straight 71.72 cfs 11.79 ft/s 0.15 ft 0.025 14 Ibs/ft2 4.73 Ibs/ft2 2.96 STABLE F P300 Reinforced Vegetation Underlying Straight 71.72 cfs 11.79 ft/s 0.15 ft 0.025 8.5 Ibs/ft2 4.7 Ibs/ft2 1.81 STABLE F Substrate https://ecmds.com/projecUl42852/spillway-analysis/202379/show# 1/1 Z O F= >Q W J W } O J3 M J d N H z W m Y Z Z m 0 O LLa N LLaaJJ M W J O W 0- O O I--- O z ZQa w 3= V z 3ti y �n (n M to 3 co v m 2 v W Z 0 O OJ N N En 3 c C-) OJ N n � _O ct- 3 N Z N O rn _N G M M Z W O Y Q Z > m J � W W � 0 3 J_ C O a 1- N 0 oQ Z d J N p L.L. Z O p z W Z J W ZZ Q 3 = U J Of W Q p m C> 2 � Q V) O O Z p QLLJ O m Z J L.LJ Cl 3 J_ (/) W O m N O Lj U) p (N N p �z¢ !{ ! \\ § § }t } �f f1 i6 ! 2 t� !� i K !� # k §i®E J! @ /# k & ; ■ (( � (2 }k� 2 ■ m $f� �! 2 {� � ■ ■ �� � §�■ � §|! ! K§| � � | | § H lit