HomeMy WebLinkAbout20210788 Ver 1_DiffuseFlowDoc_20210414 GREENSBORO
NORTH CAROLINA
ENGINEERING & INSPECTIONS
DIFFUSE FLOW DOCUMENTATION
The proposed project will not create concentrated flow through the riparian buffer.
Therefore, diffuse flow is not required.
PO BOX 3136 • GREENSBORO NC 27402-3136 • WWW.GREENSBORO-NC.GOV • 336-373-2302 • 336-373-CITY (2489)
El 5045