Loading...
HomeMy WebLinkAbout20210788 Ver 1_DiffuseFlowDoc_20210414 GREENSBORO NORTH CAROLINA ENGINEERING & INSPECTIONS DIFFUSE FLOW DOCUMENTATION The proposed project will not create concentrated flow through the riparian buffer. Therefore, diffuse flow is not required. PO BOX 3136 • GREENSBORO NC 27402-3136 • WWW.GREENSBORO-NC.GOV • 336-373-2302 • 336-373-CITY (2489) El 5045