HomeMy WebLinkAbout20210404 Ver 1_Deep River Revised Raparian Buffer Impacts_20210412
Wanucha, Dave
From:Moore, Della R
Sent:Wednesday, April 14, 2021 9:43 AM
To:Wanucha, Dave; Parker, Jerry A
Subject:Re: Bridge 67_401 permit application
Attachments:Deep River Revised Raparian Buffer Impacts.pdf
Good Morning Dave,
The riparian buffer impacts for Deep River summary sheet have been revised and is attached. As for the
Critical Area parameters from West Fork to Deep River, 17(110) details include:
*Critical Supply Watershed
Index No. WS-IV:* 17-3-(1.5)
15 A NCAC 2B .0248
Randleman Lake
This project is situated within a CA. Please let me know if you need anything else.
Thanks,
Della Moore
NCDOT-Division 7
DEO's Environmental Assistant Engineer
1101 East Wendover Ave, Suite 200
Greensboro, NC 27405
336-334-3515P | 443-983-1580 C
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Tuesday, April 13, 2021 8:44 AM
To: Moore, Della R <drmoore2@ncdot.gov>; Parker, Jerry A <japarker3@ncdot.gov>
Subject: Bridge 67_401 permit application
Della and Jerry,
Please confirm that the proposed project is or is not located within the critical area (CA) of a water supply raw
water intake. It does not appear that it does, but the PCN provides information stating that West Fork Deep
River (at the proposed project location) does reside with the CA. Please confirm so that we can prepare a 401
Certification. Thanks.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
1
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2
I
RIPARIAN BUFFER IMPACTS SUMMARY
IMPACTS
BUFFER
Site Station Structure TYPE ALLOWABLE MITGABLE REPLACEMENT
No. (From/To) Size/Type ROAD BRIDGE PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
CROSSING IMPACT (ft) (ft2) (ft2) (ft) (ft2) (ft2) (ftZ) (ft2)
1 -L- 14+58 TO 16+08 33" BOX BEAM, 1 SPAN @ 85' X 2693 1361 4054
X 3934 1824 5758
X 135 135
X ' X 6207 6783 12990
TOTALS*: 12834 10103 22937 0 0 0 0 0
NOTES;
NC DEPARTMENT OF TRANSPORTATION
DM5ION OF HIGHWAYS
JANUARY 27, 2021
GUILFORD COUNTY
17BP.7.R.127
n.dwla,erm SHEET 6 OF 7