Loading...
HomeMy WebLinkAboutSW3210401_Supplement-EZ Form_20210415SUPPLEMENT-EZ COVER PAGE FanMSI. PEI- ....................................................................................................................................................................................................................................................................................................................................................................... PROJECT INFORMATION 1 Project Name Caliber Collision Outparcel 2 Project Area (ac) 27.5 3 Coastal Wetland Area (ac) 0 4 Surface Water Area (ac) 0.11 E 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1. 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 Iffliflim'18011041C DESIGNER CERTIFICATION 27 Name and Title: Marc Momsen, P.E. 28 Organization: Land Design 29 Street address: 223 North Graham Street 30 City, State, Zip: Charlotte, NC 28202 31 Phone number(s): 704-333-0325 32 Email: mmomsen@landdesign.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. \\\\\\ 111 I I I I I I//'//// Z� CAR 0 SEAL 033804 Digitally Signed by MARC MOMSEN DR. c US MARC MOMSEN E-MMGMSE DESIGN.coM, 4/ 6/ 2 0 21 O-LANDDESIGNIGN, CN CN MARC MOMSEN R aso I have rev ewed this document Date:2921.04.06 15:32:22 04'00' Date DRAINAGE AREAS I Is this a high density projects Yes If so, number of drainage Is all/part of this project subject to previous rule versions? No I FORIVISLOADED DRAINAGEAREA INFORMATION...................................................................................................................... ......................................... ......................................Entire ..............Site .................................... ....................................................................... 1 .................................................................... 4 Type of SCM 5 Total P!ZiA in pEqj!��! (sq 662112 sf 77972 sf New BUA on subdivided lots (subject to permitting) New BUA outside of subdivided lots (subject to 7 permitting) (so 584140 sf 77972 sf § Offsiie : total area (sq !D NA NA 9 Offsite BUA (sq ft) N/A N/A 19 Breakdown of new BUA outside subdivided lots: Parking (N ft) 41050 sf Sidewalk (sq 1) 1320 sf Rog! (sq 1) 29860 s! Roadway (sq 1) 14712 s! Futures T 1584140 sf Other, please specify in the comment box below (sq 1) New infiltrating permeable pavement on 11 subdivided lots (sq ft) New infiltrating permeable pavement outside of 12 subdivided lots (sq ft) NA Exisitng BUA that will remain (not subject to 13 permitting) (sq 1) 147§1 s! 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 3894 s! 16 Percent BUA 80% 9% 17 Design storm (inches) 1 in 1 in 18 Design volume of SCM 19 Calculation method for design volume � NRCS Method NRCS Method IN NFORMATION FORMATION Please use this space to provide any additional information about the 20 ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... drainage area(s): WET POND 1 Drainage area number 1 2 Design volume of SCM (cu ft) .. 53107 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? NG 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 Does the SCM have retaining walls, gabion walls or other engineered 6 side slopes? No Are the inlets, outlets, and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? No 9 What is the method for dewatering the SCM for maintenance? Pump (prefer 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes If the SCM is on a single family lot, does (will?) the plat comply with 13 General MDC (10)? No 14 Is there an O&M Agreement that complies with General MDC (11)? Yes i5l Is there an O&M Plan that complies with General MDC (12)? Yes an 18 Method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Elevation of the excavated main pool depth (bottom of sediment 20 removal) (fmsl) 536.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 537.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 544.00 23 Elevation of the permanent pool (fmsl) 544.50 24 Elevation of the top of the vegetated shelf (fmsl) 545.00 25 Elevation of the temporary pool (fmsl) 554.00 26 Surface area of the main permanent pool (square feet) 17499 sf 27 Volume of the main permanent pool (cubic feet) 85688 cf 28 Average depth of the main pool (feet) 4.90 ft IT using equation 3, main pool perimeter �teet/ If using equation 3, width of submerged veg. shelf (feet) Volume of the forebay (cubic feet) 12798 cf Is this 15-20% of the volume in the main pool? Yes Clean -out depth for forebay (inches) 12 in Design volume of SCM (cu ft) 53107 cf Is the outlet an orifice or a weir? Orifice 40 Drawdown time for the temporary pool (days) 2.15 Are the inlet(s) and outlet located in a manner that avoids short- 41 circuiting? Yes 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance (inches) 102 in 44 Depth of forebay at exit (inches) 114 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft Does the orifice drawdown from below the top surface of the 48 permanent pool? Yes Does the pond minimize impacts to the receiving channel from the 1- 49 yr, 24-hr storm? Yes Are fountains proposed? (If Y, please provide documentation that 50 MDC(9) is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment FACW Meadow Mix 54 Has a planting plan been provided for the vegetated shelf? No ADDITIONAL INFORMATION Please use tnls s ace to rovide an additional information about the p p Y 55 wet pond(s): Wet Pond 3 11:13 AM 4/6/2021