HomeMy WebLinkAbout20210781 Ver 1_Pre-Filing Request Review_20210415DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210781
Version*
1
Raleigh Regional Office - (919) 791-4200
Rick Trone
Pre -Filing Meeting Request submitted 4/15/2021
Contact Name * Kevin Martin
Contact Email Address* kmartin@sandec.com
Project Name * Bright Leaf
Project Owner* Montecristo No. 70, LLC (Attn: Rex Vick, Jr.)
Project County* Wilson
Owner Address: Street Address
3434 Kildaire Farm Road, Suite 135
Address Line 2
City State / Bovine / Region
Cary NC
Fbstal / Zip Code Country
27518 USA
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
i7 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Stephanie Goss
Please give a brief project description below and include location information. *
This project proposes the construction of a single-family residential
development including but not limited to roadway infrastructure,
residential lots, utilities, and SCMs. The Bright Leaf project is located at
the stub/end of Heritage Drive in Wilson, NC and is approximately 27
acres. Wetland impacts associated with lot fill are probable. Existing
conditions onsite consists primarily of agricultural and cut land with two
(2) wetland features (W1 & W2). Land use in the general vicinity of the
project consists of single family residential developments along with
forested and agricultural land.
Please give a couple of dates you are available for a meeting.
4/16/2021
4/19/2021
4/20/2021
4/21/2021
4/22/2021
Please attach the documentation you would like to have the meeting about.
Bright Leaf Wetland Impact 4-14-2021.pdf 1.12MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
xS =cb'&: e ra fliPsrnx
Submittal Date 4/15/2021
Reviewer Meeting Request Decision
....................
Is a meeting required or is there more info needed?*
r Yes r No
If rrore information is needed, please add conrrents for the errail notification below.
W2
W1
W4
W3