Loading...
HomeMy WebLinkAbout20210781 Ver 1_Pre-Filing Request Review_20210415DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210781 Version* 1 Raleigh Regional Office - (919) 791-4200 Rick Trone Pre -Filing Meeting Request submitted 4/15/2021 Contact Name * Kevin Martin Contact Email Address* kmartin@sandec.com Project Name * Bright Leaf Project Owner* Montecristo No. 70, LLC (Attn: Rex Vick, Jr.) Project County* Wilson Owner Address: Street Address 3434 Kildaire Farm Road, Suite 135 Address Line 2 City State / Bovine / Region Cary NC Fbstal / Zip Code Country 27518 USA Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: i7 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below and include location information. * This project proposes the construction of a single-family residential development including but not limited to roadway infrastructure, residential lots, utilities, and SCMs. The Bright Leaf project is located at the stub/end of Heritage Drive in Wilson, NC and is approximately 27 acres. Wetland impacts associated with lot fill are probable. Existing conditions onsite consists primarily of agricultural and cut land with two (2) wetland features (W1 & W2). Land use in the general vicinity of the project consists of single family residential developments along with forested and agricultural land. Please give a couple of dates you are available for a meeting. 4/16/2021 4/19/2021 4/20/2021 4/21/2021 4/22/2021 Please attach the documentation you would like to have the meeting about. Bright Leaf Wetland Impact 4-14-2021.pdf 1.12MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature xS =cb'&: e ra fliPsrnx Submittal Date 4/15/2021 Reviewer Meeting Request Decision .................... Is a meeting required or is there more info needed?* r Yes r No If rrore information is needed, please add conrrents for the errail notification below. W2 W1 W4 W3