Loading...
HomeMy WebLinkAboutNCC201663_NOT Closeout Documents_20210414North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Georgetown Estates -Phase Two Lots 74, County: Cumberland Project: 75, 142, 151 & 162 River basin: Cape Fear Person financially responsible: Armstrong Builders, LLC - George ItArmstrong, Project #: CUMBE-2020-150 President NCC201663 Address: 2709 Thorngrove Court, Suite 2, Fayetteville, NC 28303 1. Project Location: Evermay Ct/Volta DrBankswood, Rockfish Pictures: No 2. Weather and soil conditions: Dry, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent: April 09, 2021 9. Corrective action needed: Yes 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: April 08, 2021 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM cc: