HomeMy WebLinkAbout20190210 Ver 2_Site Inspection Non Compliant_20210415Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190210 NCDOT - NC 69 Widening (A-0011C) Clay NCDOT - NC 69 Widening (A-0011C) NC DOT Division 14 - Sylva 4/12/2021 Routine Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-83° 49' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 4/12/2021 Blazer, Keith Site Inspection (DOT)Routine Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on April 12, 2021. Reid Whitehead and Nick Adams were present during the inspection. A sediment release had previously been reported on March 26, 2021 after a large rain event (~3.5 inches in 24 hours. The following are items that need attention in order to get the site back into compliance: - ~ Station L 193+00 LT (Next to Rib Country). Need additional measures to prevent sediment loss into existing culvert system. - ~ Station L 180+00 RT (Blair). Need groundcover. - ~ Station L 168+00 LT. Maintain measure next to JS. - ~ Station L 131+50 RT (Site 9). Remove sediment from pipe. Okay to install coir log at outlet to capture residual in pipe. Follow up inspection scheduled for 4.26.21. - ~ Station L 129+00 RT (Anderson). Sediment observed in a JS and wetland. Sediment requires removal and stabilization on site. Upland areas with sediment impacts can be stabilized in place with mulch and native seed mix. Follow up inspection is scheduled for April 26, 2021. - ~ Station L 68+00 LT. Small amount of sediment directly above culvert inlet needs to be removed. page:2 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 4/12/2021 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Sediment loss was reported on March 26, 2021. Additional sediment removal is required in a JS and wetland at ~ Station L 129+00 RT (Anderson Property). Comment: page:3