Loading...
HomeMy WebLinkAboutSWA000100_Plan (Site)_20210415NOT TO SCALE < w t-,_ 55 1� Cn CD "F 1= 2,2 CD M. E F— F7 .0 ig M EXISTING WATER EXISTING SAN, SEWER PROPOSED WATER PROPOSED SAN. SEWER EXISTING STORM PROPOSED STORM PROJECT AREA (PHASE 1) 1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION. Legend 2. ALL EROSION CONTROL DEVICES SHALL BE CONSTRUCTED AND MAINIMINED IN ACCORDANCE WITH THE MOS F 518- Rebar Placed 4) CURRENT STANDARDS Of THE LAND QUALITY SECTION OF THE NCOEMLR, Iron Found (As Noted) 0 3, STABILIZATION STONE UNDER PIPING TO BE PLACED AS REQUIRED BY CITY INSPECTOR WHEN CONDITIONS Poin t X WARRANT. Boundary Line 4. AS A MINIMUM REQUIREMENT, Al I GRADED AREAS NOT UNDER PAVEMENT AND WITHIN THE RIGHT-OF-WAY Unsurveyed Line AND/OR EASEMENTS SHALL BE PREPARED, FERTILIZED AND LIMED, SEEDED, AND MULCHED IMMEDIATELY UPO N C OM P LE � 10 N Of C ONSTRUCTI ON AS FOLL OWS (APPLICATIO N RATE PER 1, 000 SQUARE FE ET): Adjoining Boundary Line Access Ebsement AE AE — TYPE I SEEDING (LAWNS OR OTHER FOCAL AREAS) Sanitary Sewer Easement — SE — SE — 100 LBS. OF LIME Right—of—fty Agreement — R/w— R/w- 20 LBS. OF 10-20-20 OR 20 LEE. OF 10-10-101 IN COMBINATION WITH 4 LBS OF 0-46-0 Sanitary Manhole (3) 5 LBS. OF, TA LL FESCUE, CON"[ MINING A BLE NO Of 2 OR M OR E TALL FESCU ES 1 LB. OF KENBLUE OR KENTUCKY BLUEGRASS Lamp 14 I LB. OF WINI ER ANN UA L RYE (NOVEM BEA I TO MARCH 1) Power Meter TYPE 11 SEEDING (GENERAL OR LOW MAINTENANCE Utility Pole Aerial Utility AU ..... - AU — 100 LBS. OF LIME Guy Wire 15 LES. OF 10-20-201 OR 15 LBS. OF ID-10-10 IN COMBINATION WITH 3 LBS. OF 0-46-0 4 LBS, OF TALL FES�CUE, CONTAINING A BLEND OF 2 OR MORE TALL RESCUES Utility Pedestal W I LB� DF SERICEA LESPEDEZA (USE UNSCARMED SEED AUGUST 15 TO FEBRUARY 1) U Telephone Line /G I T —, 1/4 I.B. OF GERMAN MILLET (MAY 1 TO AUGUST 15) 1 LB. OF RYE GRAIN (PRIOR TO MAY 1 OR AFIER AUGUST 15) Yard Inlet Storm Pipe 4-­ SO, SD SEEDING MIX I URES OTHER I I IANTTIOSE LISTED ABOVE MUST BE APPROVED BY THE CfTY INSPECTOR PRIOR TO Water Valve SEEDING Water Meter 5. PRIOR TO REQUESTING A FINAL INSPECTION, THE OWNER MUST SUBMIT RECORD DRAWINGS AND, ENGINEEWS Fire Hydran t �cl C CER nAcAi IGNI 10 THE ENGINEERING DIVISION'S RECORD CENTER, THE OWNER MUST ALSO SUBMFTTHE CONSTRUCTION CHECKLIST TO THE CITY INSPECTOR. Well 0 Mailbox 16 6. ALL WORK MUST CARRY A ONE-YEAR WARRANTY TO COVER ALL DEFECTS IN MATERIALS AND WORKMANSHIP. Fence X 7. PRIOR TO BEGINNING ANY WORK WITHIN NCDO"fRIGHT-OF-WAY,. I HE CON TRACI OR MUS I HAVE A COPY OF THE Creek THREE -PARTY ENCROACHMENT AGREEMENT ON THE JOB SITE, Wetiond Line WL WL — 8. PRIOR TO BEGINNING ANY WORK, THE CONTRACTOR MUST NOTIFY THE CITY AT LEAST THREE (3) BUSINESSIDAYS, Floodway Line BEFORE THE PLANNED START OF WORK. ANY WORK PERFORMED PRIOR TO NOTIFYING THE CITY IS SUBJECT TO 100 Year Flood Line REJECTION BY THE CITY. THE CONTRACTOR MUST ALSO CONTACT PIE ENGINEERING FIELD OFFICE (33�6-727-2362): TO A FRANC E FOR CO NSTR U C TION INSPECTION. Test Bore WATER AND/08 SANITARY SEWER Exist Roadside Ditch —0 0 Gas Main G —G— I . THE MOSTCURRENI EDITION OF THE THE CITY OF WINSTON-SAILEM TECHNICAL SPECIFICATIONS AND DETAIL DRAWINGS FOR WATER, LINE AND SANITARY SEWER LINE CONSTRUCTION WILL GOVERN ALL WATER AND SANITARY SEWER CONSTRUCTION. 2. WATER AND SEWER CONNECTIONS SHALL BE BESIDE EACH OTI IER ATTHE CENTER OF EACH LOT. CONNECTIONS VE ARE TO BE SPACED NOT MORE THAN 30'CENTER TO CENTER AND HA' WOODEN STAKES PLACED ON EACH SIDE. STAKES SHOULD BE FLAGGED OR PAINTED FOR VISIBILITY, AS DIRECTED BY THE CITY INSPECTOR AT 3. DENSITY TESTS BY AN INDEPENDENT TESTING LAB ARE TO BE MADE THE OWNER'S EXPENSE. FINAL INSPECTION PFIOCEDURE� TIOIN TO THE ENGINEERING DIVISION'S RECORD I . OWNER SUBMIT S RECORD DRAWINGS ENGINEERS CERTIRCA CENTER. 2. UPON ARROVAL BY THE RECORD, CENTER, OWNER MAY REQUEST FINAL INSPECTION FOR WATER AND/OR SANITARY SEW ER. OVVNE R SHALL TH E N SU BM IT THE GO N STIR U CTION C H E C KUST TO R WAIT ER AN D/O R SAM[TARY SEWER TO THE C" INSPECTOR. GENERAL NOTES 1� EXISTING SITE FEATURES, AND PROPERTY DATA FROM SURVEY PROVIDED BY ENCOMPASS SURVEYING. 2. OBTAIN ALL APPLICABLE PERMITS AND PLAN APPROVALS PRIOR TO BEGINNING WORK 1 CONTRACT OR IS RESPONSIBLE FOR VERIFYING ALL DOSTING FEATURES PRIOR TO START OF CONSTRUCTION. CALL 811. ANY DISCREPANCY IN LOCATION, SIZE, OR DESCRIPTION OF EXISTING FEATURES SHOWN ON T'HE PLANS SHALL BE BROUGH IG THE ATTENTION OF THE ENGINEER IMMEDIATELY, 4. 1 HE CONTRACTOR WILL BE REGUIRED TO DO ALL WORK NECESSARY TO PROVIDE SUITABLE CONNECTIONS WITH ALL R,OADS, STORM DRAINS, AND UTILITIES ENTERING THIS PROJECT. 5, NO SUB SU RFAC E INVEST IGNTIONS OF DE I ER MI NAT ION HAS BEEN MADE BY THE EN GI N EER. THE CONTRACTOR S HOULD MAKE HIS OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS, 6, CONTRACTOR SHALL IBE RESPONSIBLE FOR LOCATING, RELOCATING, AVOIDING, AND PROTECTING ALL EXISTING UTILITIES AND FEATURES ON'SITE. 7. PRIOR TO FINAL ACCEPTANCE THE CONTRACTOR SHALL ULTIMATELY BE RESPONSIBLE FOR CORRECTING OR SEEING TO THE CORRECTION OF ALL PROBLEMS ASSOCIATED WITH THE PROJECT, INCLUDING THOSE ITEMS NOT NECESSARILY COVERED BY THE PLANS, TO ENSURE THE SATISFACTORY COMPLETION OF THE TOTAL, FROJEC I. 8�. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE REMOVAL AND/OR RELOCATION OF ANY EXISTING UTILITY POLES, GUY WIRES, AND/OR ANY OTHER EXISTING FEATURES AS REQUIRED. 9, CONTRACTORMUST CONSTRUCI ALL WORK UNDERTHE SUPERVISIONIOF A QUALIFIED GEOTECHNICAL FIRM. 10� ALL WORKMANSHIP AND MATERIALS TO CONFORM WITH NCO10T SPECIFICATIONS AND DRAWINGS UNLESS OTHERWISE NOTED. 111� CORNER I OT DRfVFWAYS MUST BE AT LEAST 15 FEET FROM THE TANGENCY OF THE CURB RADII OF THE INTERSECTING STREET. ADDITIONALLY, THE DRIVEWAY MUST BE CONSTRUCTED ALONG THE 'STOP' CONTROLLED STREET AT LEAST 20 FEET FROM THE BACK OF CURD FROM THE THROUGH GUILE TTO PREVENT ENCROACHMENT INTO THE MIGHT DISTANCE TRIANGLE. 12. LOT GRADING. INCLUDING DRAINAGE EASEMENTS,, WILL NEED TO BE SHOWN ON THE L07 PLANS OR ATTACHED TO THE LOT PLANS S 06 M ITTED FOR RU ILDING PERM ITS. v DMNO 6' DI WAM? NO ALM PNE Iff DRX 07Y OF NNSTON S4UW PROJECT 18445 2 e, N tK � t2A p ILI :44 �, I -82 b :�: N 0� Ego- 6 z �01�PHASE 1 en Z co W �3 z PROJECT AREA GRASSED ;�_ LL a FIRE HYDRANT LL SWALE QC NMI 19yqF1 MMI19r, IV" R, --Vm— — P" PM— S rr 29 ; 30 1� 28 27 24 1, . I 1 11 2 , 6 " 25 1 "" ( ", 1? -1 , , 1, .4-1 " 0 W:r— W__ W M W W_ rLII A It VINt UK OTIOLIG L I '4_ .... . ...... 37 23 38 P, 9 ]� � 36 17 94 22 04,97' 39 o 21 �� J��" r 15 ., -i J4 1- , J LIJ 210 q, LU 1 41 !�2 14 IL 0 2� I ( . W PHASE I PROJECT AREA 42 11113 EXISTING GAS MAIN FROM SURVEY 1 R_ rl,- RECEIVED FROM ENCOMPASS 11 U2' SURVEYING ON 4113/21 FLUSH CURB 43 12 1�7 � Y - I , f2l T7' __', : I ­ . .. ....... MAIL 108.35,� � 1 6, _AI, ': OPENING OUTLET KIOSK t 1: JL ............ 101 R/W DEDICATION 101.4ty - :;%' _1 51 WIDE ROCK DUST 10 � o 11314 - 45 WALKING TRAIL 70-7-A-31- J. BENCH 46, THOROUGHFARE IOU' C111'.1 117,79' OPEN SPACE EA TYPE III Now W Form CtJoMorate Ph*,=q, lno� ag 1. 1 1 NTING 3 8 1 1 I AIJFFFRYARD _-2.1 D ok 267a Pa w 906 ENCH PIN 5897-95-7 96 48' 4 1 � 1* PHASE1 WWT Q* 1 +0 1+04 PROJECT AREA 49 _T, 7, A. AV. Ak AL A, �u A� A� A& A& �L AL A, A� 4� A, IJU A, 77�:� - 3� ; , P'l it, 50 "1' 3& A& �L A, -AL �IL A& AL xlk A& AL A& AL �L AL At AL J)A AL 5 2 101 x 70� SIGHT A4 �& A� �b A& �U �U A� AL A4 A& A& A� A& A� A� A& A& A& A� JA 117.36' 1 ­_ I 10A . 21 EASEMENT (TYP) A, dk %L A- A- -IL �L A, A� U A, J� 511 4 3 10' X 30, SIGN EASEMENT 'Ai LL AL sL aAk Jk Jk Jk �k �k Jk dk AL AL j& AL AL i& AL AL iL A& iL aL AL I& A& A& JL AIL IL I�L AL �21 _JL 44 ALI ��I .17 Ak 4. A� �u 4L �u A� �u �G �u A, ak A4 FIR HYDRANT ItO fR I LSEA DRPV' A& A& JL AL AL AL JL �L MIR 11r. RIP N 1 10`1 x 301 SIGN EASEMENT A"l i A� A� i& A& A& U& IL �L J& A& IL 41L �L A, Now or Fonnetly 57,W(w* Fcrms LP FIRE HYDRANT SA GRASSED SWALE `00, 4& JA AL AL J, AL JA AL At A4 & ak &2, 'A" Deed Book 1954, Page 1903 U. URB OUTLET Deed Book 7191 Page 1.394 �L 4k A� A& &, �U AL �L AL �L A& A� ,)L %& C �5! Deed Book 507, Page 358 A� AL �& L �L & �A, A, AA AA PIN 6807-04-3 J2 Z-1 Elm 0 Alk 3& A& I& AL A� A. 1AL LIL �JL LI�L .1IL �& 11L �L AL �L �L 1JL U_ 345 1IIk U � 1, 9� I,,- GRASSED .61 In P I �r — — SWALE IAMWAA ` ` A' 3JU A4 14 1 1 - #1 1& JL A, .11L 11L .41 Eldrid 4"., A. Now -or 4 34 �u A& etku)0=& J&nedIL Jk AL J4 2%p ,W?k 56 LL �� �& �& 4 �& 17; A. A. it. A, a Q�, �14 �& U. 10 5%fle qleV N t9l*- 3Y'& IN PHASE 1 47 GRASSED IV AL ak AL AL a& �L dDead aaqW8&3, 1 165 PW 5897-8,5RW_ 4 0 17 STREET TREES OWVMLr 174 1 343 PHASE1 ONETREE / LOT -9 12127' t AL I& jk� AL JL k& au AL PROJECT AREA UI (TYPICAL) tel Vu W A� 3& AL %1L A& A& �L A& & XIL XL 3& �L AL AL U sum—musm—M $TREE I TREES . ..... IVE ACCES A& �& 4& A A& �Ik AU AL IL AL JA 31L JJ. AL JA A& 1& IL Im VA 1' NE T ONE TREE)'LOT 166 htU �U �U A, 'L �L AL Ju Jk lik A, I& A, AL 12. �JL AL 13L �L �L AL A� -z—Al (TYMCk) EASEMENT 175 FLUSH CURB 4 .6, 4, %M & J� %& ALP 40 �& &L �� A. i& A& A. .4t A, U A. �14 .4� .44- .94 A� �U U 44 At it, %dk �M U �U I'SWEINALK 1yok, A& A� A& A� x& A� JV A4 A� AU A4 &L A& A& AA & �L Jk A, A, JL �L & 'I& �L a, IJL �k �L & I& A4 AA A4 'L & 'L MAIIIAMNAINCE "OPEN OUTLET ;,0,7 EASEMEN 180 f4r, M.—full 4, �& �U 4, �U A� 4, 4k �U �& A4 A, A4 A& L A4 A, A. A4 i& A, L A, A. L A. A, A� -& A� A, �9, A, Ti, — 1 '11­ 244.12, 44 1A 1 401"' 00 VEGETATED LL PHASE 1 A, A4 A4 A4 A& A� %& A& A� A� A4 �& A& Ju A& A, i& Aft, &. �d- �L �L A- �L A, A� �& �U A, A, 1L 1, -1L 44 A� R/W ? q, _�� -- --& ASMIALT I SWALE & �U .1k A' �U .04 �U �U Al A4 �U 4& 44 �& 41L �L AL �& A4 AA A& AL A� At A, &L xL X . . . . �L, h& �L & VALLEY CURB FLUSH CURB PROJECT AREA BUTTIA 167 1 fT OPEN OUTLET PHASE E07ING, ACCESS 44 lu iz� A� 44 A� .41. �u 4A A& *W %W AM ub �14 �44 t& k& M %91 %w I& &W Jk 176 PRGJ 0 AM 10 179 1, TO BE R9# NUNN T�, GRASSED PROJECT WGRASSS�RIP GRASSED, 1� 101 W DEDICATION NMI= 10, r 0 SWALE AREA 100 �u A� A4 A4 A& A4 A4 4& & &L �L J& �& A� &IL UL AL AIL IL AL AL &L IL A, �& & �& �u �& �u �& $& UU ITY 51 UTILITY SWALE 26U VEGETATE tons Wmas aplauL *44 �& �u & 'A, , AL �L �L JL .9, J� �Ik JL �L �JL �L �JL �& A, A� Jk .0�, .4� A, A, A, A, �L �L "L M.'I �u & *, & I& EASIMENF FW FLOW �G "-N - FW �& �& 'Z &N IAL I& IIII, 1& 4. 44 _IV10 FW 44WZ V -X­-MF%,,A_X.WA__U F4V 0 1VW &VEGETATED 6. u I I � I I I '"' , bm 0 I 3.2,V —1 - 108" FLOW PATH FW F FIV — 7 178 �u A� .1�4 44 lu A, U 4� 4� A� 44 -A� .14 �u 4, A4 ,Ik �& �M �&"71 XW=j�& �U A, �STORIA J6 I A 177 SEWER PAVEMENT SECTION: �ip 1AL AL AL AL A& AL &U A& Au A& jk At 12, JIL �IL �11 A, A, �L �& AL �L �L �& 1� I& Ak, A& AL AL 111I WATFR 1�� ?Ono P PROJECT AREA IN PHASE 1 1,036,033.97 SF A AL'111 `4 -%%% L.:� . ... . & UAIN F TV, M S, MOW it I I JIII 1 " S 9.513 PROII 0 ---- I ), f I,& & A� 4�, -U & -U -U 44 -U 4, U �U �U A4 A4 A� A� �L A� �U A4 A& AL �& A4 AL A4 �b A, A, �& �4 A� Ak A& A& IL AND PMVER SHAU BE I 5ANrTARy=-' 240'VEGETATED 4; � OCATFFT) WrFRN THE 10' SPHER TYPE I I I N * J1ILffYEASEMW$ 2" S 95B SEWER FLOW PATH I 1 0 11y, �& A At AL J, dL AL A, AL AS� A4 AU �U AA� At AL 4& AL A4 A& A� & i& A& A& JA A4 A� A, iL AA �& AL �& JA iL �L A. A. & �L I& A' A� AL J4 A& AL UL AA �JL A, L EFERY Rn 1�11_ 71, ABC 240'VEGETATED A, �& & - .4 U 4�, ��Z m- aN -a;� 4,11 1 �u �u U .4, 4, �& �u �u �& 4, �u �L A4 4u lu A4 �& A& &L A& A& A� QL �& �L A, 4& .11L h& I& 4u �u AL A, A� A4 �& �L && �u A94 J& AL ku A AL U �& X& A& A I& AL AL AL 1!L AL �JL I& I& I& A, A, 12� I& I& _JL I& I& �IL �& 44 A, A& 414 & JA AU A4 A& 4L AL i& A4 A& A& A& Ag x& 3& 3& && iL &L a, iIL .2, ig. o, JA A, 4L A, I& IL �IL �JL U A� s& A& ,AL �k �k �L :L �L �L L & AL �L IL �L �L �&, A, �� fi, �L A, A, & �L A, �& �U Ak �& AU �U 3& AL AU 4L AU A� iL I&, iL �L �L A, �JL A, A� A, �L AL A, A. �& A, A, �& 4, �A� A. A� �& �U A. �L Al -4 1& �& IL 4L Al Al Al Al I& I& �L �& 12A �L 14� 41 IL 141 M A. U .4- 4, A- 4- A,� & A, A, 4, A, 4, i� AL Ak AL �L L '11L �u A, &L AL A& IL �L AL �L 1JL �L �IL IL �& A.. �L I 'S �U A& �& Jk A& 4A AL AL JA �Jk a& & AA AL �& A� AL �L �L �L �L �Jk �L AU &L �U AL AL �& �L Ahe I �u .006& Bdak �0594 Auge&29" 44 44 4& A4 A& A4 A� A& �& J, 4, A. A, AA A, At L U1. �%ef 74A 0 A& AA A& A& &L &L At i& AL s& ,JL AL �U A4 A& A' �� IU Alk �& JA J� dIll �L IL A. LUL A, A� �U �U SW -A. SIM- 4,tU A� At, A�, A� L& L& 4 — - _ Naw or Formerly 9)4ark Forms, [P Deed Book 1960, lax 3309 FIN "97-95- 79 Now or FarmeHy Fams, LP Deed 9 k*1954,, Page 1903 Deed Book 1191 Page 1394 Geed Book 60�, Pa5e J58 AMVM47F LONRON OF PIN 6807-04-3 32 WA TER MAIN FROM Cff OF WI SAL& PMECT 86,65-p iYJST 2' PL40C W AM ALONC SAMWW DRW. EASEMENT (REM DR4WWG SHEU I OF 4 DAIED 09110118) & PROI ATM 8445 (RECIM DRAWING WM OF 2 D 0712 1O'R/W DEDI CATION S A LEGEND W W W N . .......... �(S sr v v PHASE1 PROJECT AREA PHASE 2 t i ON a eaL-, 1 PHASE3 FIRE HYDRAN I GRASSED SWALE GRASSED SWALE SWALE GRASSED 17, LANDSCAPE - EASEMENT to �JR Cog PHASE1 PROJECT AREA FIRE HYDRANT 1 67 11 8.25�_ _ 65 MAT 64 138 44"' 62 61 I� 60 L f 133AT LIU: 57 �J �� two — '�_7 138.20 C < a- 4- 172 171 N IS �11 1_� � 0 a Z:S- GRASSED SWALE _11 I T� 0 '� .W— FLOW PATH 390, VEGETATED 50' THOROJHFARE , 11 �, I- ,* 10 FLOW PATH" nPFN q, rF FW 0 2,0' SO, SW 30'VEGETATED S9WH BUFFER T SE _sE _SE SF PHAS, _SE *__1 �eo? se SE SE SE 11 1 7 5 PROJECTAREA SE' st—GE SE N , '011 —SE Sf mm 7=." R" PM SE ___ '4� — , A, 230'VEGETATED C) FLOW PATH lv� I 1 SE __.Vworl�A I 9 km 75458 0'1� - SE. 155- — , % SF se DMG SAN SEWMY OUMALL EXISTING BILL BRANCH STREAM I W OF WNSM S4M' 30IVEGETAT�DAI PR0J9T 1865,5 BUFFER I r I d 2=63 30'VEGETATED t Alt 73;'.67 210VEGETATED k �& BUFFER DaMNG 6' DI WATER M4W fill � �t' WL FLOW PATH L Jl�� WL CflY OF K%TM L I C S4M WL AL A& A& AU A24 A4 44 A& AL A& A& AL AL ak ak JL &L &L it A& A& Lk J, 4L Az IL �u $L As, Al� 44 �k J4 A& A& A& J4 A& A&I A4 at A& A& A4 A&L 424 AL Lk IL AL ilk I& A4 44 A& A& A& A& XL AAL AL AL lik 12L A& 44 3L A4 AL 3L AL 4& A& U& LL 19L AU IL Ak Ak Ak A& Jk AL 1IL �& I& IL Ak & AL ilk I& a, Iik Ak ak �L �& �11 ak 41, AL UL &U A& ak �L A. I& AL AL �& Ak �k Ak �L AL AL �& .1L 12, AL I'll 4k 44 41 Awl Ak �Ak Au. 196 11L 4k �44 U .04 404 A& 4& A& AIII` &W ,,a& 112� au au JIL AAL 10L lu 4AL 44 1� 114L A� ISL Au hu 1� AIIk &L 4IL JIL -S� -10L AL AL dL It, JL JL 19L 19L AL .1k AL �u .21 4L 4k 44 3 LL LL IL IL IL AL A41 4k AL IL 3& AL JJL Alk IL JL IL AL 41k 4& A& A& A, 4L A� 4& Jk A& AL AL A� ak 3& JL all. 0, Fff hMI 44 AL AL AL A� 0 Ak 4L �& A& A& A& �L -% Ak -0 �U �U -1U -9� A& 4& �& e4 JA A& A& Al. A& AL �A4 �M. A& I& Ak Ak AA� A0, AL AL AL IL 1� �L �L �L A, �L �& AL & dL .21 44 Zk 3jk 1Q14 4L 4L JL �u 41, U �& U& A& Ak Ak & A, & Nt&� If J 101 R/W DEDICATI10�1 5001 THOROUGHFARE �T. M"4&r OMW, -22EN, SPACE TYPE III —VNEGATIVE ACCESS EASEMENI 101 x 70'SIGHT (TYP) EASEMENI 1Ux 30'SIGN EASEMENT A_91WLT WIVE 10' x 30' SIG N EASE M E N T 100 VNEGATIVE ACCESS EASEMENT PHASE I PROJECT AREA PROJECT AREA IN PHASE 1 16,583.95 SF 11'Q W*W[M ;g =11IIIS Im _ FLOOR PLANS PLAN NAME CITY KERSHAW A 12 DORCHESTER B 8 MERIWETHER B 33 McDOWELL B 1 PALMER A 4 VICTOR A 20, NO FIELD SURVEYING BY LABELLA; INFORMATION FROM: ENCOMPASS SURVEYING. PRELIMINARY VVETLAND FEATURES WERE �ESTIMATED BY PILOT ENVIRONMENTAL INC. & ENCOMPASS SURVEYING. 01 0 so 100 (IN FEET 1 Irich = 100 It. 2,00 0 M m LaBeLLa Powered by partnership. 93�9 Burke Street, St. H Winston-Salem, NC 27103 (704) 560-8514 C#043�O Email.- pstimpson@labellapc.com NA C A t�) 22052 46 -5, 0 GIN i�a­ 'Ile I 0 2021 LaBella Associates Water & SoNver Utilities Direclor Date Approval by the Iftilities Director of the water and sewer irifnistructure depieled in these plans does not consaitute approval for any other purpose than that set forth in Section 64 of the Water Systcrn Poticy ind Section 36 of aw Smer Systorn Poliq of the City/Counfy Utility (' oinjuission. To the extent other enn ts, I s or the like rnust lic obtained to complotc this projoct, such WV s7ccifically 1104 grazaad by this; approval and must be obtahied by the I)cvctcvper aiuVor his dcsignm Apprmal of tlwsz water & simitaly smer Plans (loc- not constitute approvat for construction. Approval of cowstruction must he in to; I �vriftcn agreement. Failure to obtain such agrccnI Prior to bcginning of constniction, mill relieve the City of any financial participation in this project vilmatsfiever. CITY OF WINSTON-SAIEM BY: 4 4/1 al2l NICIDECT STORMWAIER BUA COMMENTS 3 4/13/21 GAS MARJI SURVEY INFORMATION 2 3/26/21 NCOOT COMMENTS 1 ...... 3/26/21 CITY WINSTON SALEM UTILITY CO MMENITS NO: DESCRIPTION: LE�ISIONS PROJECT NUMBER 2210366 DRAWN BY, B,WS FILMEWED BY� PAS ISSUED FOR� CONSTRUCTION DNI E, 1/1 ?_/21 DRAWING NAME: DRAWING NUMBFR: