HomeMy WebLinkAbout20042031 Ver 1_Contengency Closeout Report_20120523OLI,;0-5
Zacks Fork Creek Stream Restoration
EEP ID (IMS #) 432
FDP CONTRACT # AW03003A
USACE ACTION ID #
DWQ 404#
CONTENGENCY CLOSEOUT REPORT 2012
Stream
Project Setting & Classifications
County
Caldwell
General Location
Lenior
Basin:
Catawba
Ph sio ra hic Region:
Piedmont
Ecor ion:
N. Mountains
USGS Hydro Unit:
03050101027
NCDWQ Sub - basin:
03 -08 -02
Wetland Classification
December 2009
Thermal Regime:
Warm
Trout Water:
No
Stream Repair
April 2011
Monitoring Year -6
August 2012
Project Performers
Source Agency:
WRP
Provider:
Spaulding & Norris,
PA
Designer:
FMSM Engineers
Monitoring Firm
ESI, Inc.
Channel Remediation
ESI, Inc.
Plant remediation
ESI, Inc.
Property Interest
Holder
EEP
Project Timeline
Milestone
Date
Construction Completed
Sept. 2005
As -built survey
February 2006
Monitoring Year -1
December 2006
Monitoring Year -2
December 2007
Monitoring Year -3
November 2008
Stream Repair
April 2009
Monitoring Year -4
December 2009
Stream Repair
April 2010
Monitoring Year -5
December 2010
Stream Repair
April 2011
Monitoring Year -6
August 2012
* See attached letter from Spaulding and Norris
MITIGATION UNIT TOTALS
Stream Mitigation Units
Restorahon
Segment/Reach
Pre —
Construction
(acreage/linear
feet
Mitigation
Approach
Watershed
Acreage
As -Built Linear
Footage/Acreage
Mitigation Ratio
Mitigation Units
(SMU/WMU)
STREAM
WMU
3900
Reach 1
3900
R
7872
3900
1 1
3900
UT1
145
R
145
145*
WETLAND
Areal
Area 2
* See attached letter from Spaulding and Norris
MITIGATION UNIT TOTALS
Stream Mitigation Units
Riparian Wetland
Non - riparian
Total
Wetland
Riparian Buffer
Nutrient Offset
(SMU)
Units
Wetland Units
WMU
3900
Page 2 of 5
s4yc-
-/V
August 22. 2012
SPAULDIIVG & NORMS, PA
Planning - Ci%it 1_ngineelIn �tlr +.: °vine
Mr. Tim Baumgartner
NC Ecosystem Enhancement Program
1652 Mail Service Center
Raleigh, North Carolina 27699 -1.652
RE: ZACKS FORK STREAM RESTORATION PROJECT
Project Closeout Meeting & Site Inspection
Caldwell County, Lenoir, North Carolina
(NCEEP CONTRACT NO. AW03003A)
Dear Tim:
Per our discussion at the Project Closeout Meeting on August 6, 2012, for the above referenced
project, the following information will summarize the findings of a recent site inspection and the
stream mitigation credits to be delivered to EEP. The following documents were reviewed to
assist in preparing this information:
EEP (formerly NCWRP) original RFP issued on June 25, 2002 and subsequent
Addendums
■ S &N Response to the RFP (Technical Proposal, Technical Approach and Gust
Proposals) submitted to EEP on October 11, ?002, and January 10, 2003
■ Contract between EEP and S &N executed on Februan, 24, 2003
■ Stream Mitigation Guidelines prepared by the US Army Corp of Engineers
(USAGE), EEP and others and made available in April 2003
■ Zacks Fork Stream Restoration As -Built Survey February 2006
■ Notes from the September 28, 2011. Project Closeout Inspection with EEP. USACE.
and DWQ
■
Live Stake Report and photographs prepared by ESI and submitted to EEP in
November 2011
• Photographs from the March 15, 2012, site inspection
■ Caldwell County GIS data and aerial photography
On August 8, 2012, Stephanie Norris of S &N and Charles Johnston of Environmental Services,
Inc. (ESI) made a site inspection to document the vegetative growth of the November 2011 Live
Stake Areas and evaluate potential bank failures. Live Stake Areas B — Station 38 +50 and D —
Station 44+00 were found to be completely stable with established vegetation. A short section
(approximately 10 LF) of bank slump was observed at Live Stake Area A - Station 34 +50. The
bank at this location has already begun to stabilize and re- vegetate, as indicated by the attached
photos. Therefore, we do not consider this to be a bank failure. As for Live Stake Area C —
Station 41 +00, we measured approximately 70 LF of bank failure downstream of the log vane, as
• �i.l. ;iili7(1 m 1';t.`: i 11i)t �j -7�?1 4 ?� lrii)ity Road ! ltaletall. �Vintll t ari'�Itrtil
I t ertlh d'NonlulI J $�% pol litl.lht�•
Mr rim Baumgartner
Zacks Fork Stream Restoration Project
August 22 2012
illustrated in the attached photos It is our opinion that the bank should be stabilized with
boulders or rip -tap and the length deducted from the stream mitigation credits Please advise if
this area must be repaired prior to the closeout
Based on our evaluation of the above reterenced documents and the August 8 site inspection, we
believe that 3,900 Lf of stream mitigation credits will be delivered to EEP This credit length is
measured as follows
Zacks Fork Stream Restoration
■ Beginning Station 11+35 (Downstream of Rock Vane and Bank Stabilization)
■ Ending Station 50 +00 (Bank Stabilization at the existing culvert headwall)
o Total Length of Zacks Fork Stream Restoration =3 865 LF
(Note Emshng u(ilit) crossings were in place and identified in the Technical Proposal
and did not impede or affect the restoration of the stream At each utility crossing the
stream banks and channel are stable RIP Addendum 2 dated August 30 2002, and the
April 2003 Stream Mitigation Guidelines do not prohibit utility crossings of suggest the)
he removed from the mitigation credit length Therefore half credit is claimed at the
utility crossings The City of Lenoir Maintenance Comdor for the sewer main parallel to
Zacks Fork measures approximately 12 LF to 15 LF wide This width is applied to the
three, existing utility crossings at Sta 29 +25 36 +15 and 38 +90 )
Tnbutany to Zacks Fork Creek - Intermittent Stream Restoration
Reference the enclosed Caldwell County GIS data and aerial photography which
identifies the original alignment of the intermittent stream and the revised alignment and
connection to Zacks Fork Creek
The channel cross - section, pattern and profile were altered to create the new alignment
This was undertaken to provide stability for the confluence of the intermittent stream
with Zacks Fork Creel. The new alignment of the intermittent stream brings the
alignment closer to the historic stream alignment and was included in the February 2006
As -Built Plan
o Total Length of Intermittent Stream Restoration = 145 LF
Stream Mitigation Credits
• Total Length of Stream Restoration = 4,010 LF
• Deduction — I lairCredit for 3 Emsting Utilit) Crossings = 30 LF
and Pedestrian Bridge
• Deduction — Half Credit for Bank Slump at Live Stake = 10 L F
Area A
• Deduction - Bank Failure at Live Stake Area C = 70 LF
• Total Length of Stream Mitigation Credits Delivered = 3,900 LF
Even with the referenced deductions the total Length of Stream Mitigation Credits Delivered to
EEP meets the Contract L ength of 3 900 LF Therefore we have met the intent of die Contract
and Technical Proposal
Mr rim Baumgartner
Zacks fork Stream Restoration Project
August 22 2012
As for the Riparian Buffer and Conservation Easement the Technical Proposal referenced the
existence of both a public sanitary sewer main and greenway that parallels Zacks Fort. Creel.
These features have always been present and kno%%n prior to Contract execution Although our
intent was to provide a 50 LF Riparian Buffer from the top of bank through the entire stream
corridor the maintenance corridor for the sewer and greenway easement have impeded the width
in some locations However in other locations, the Buffer width exceeds 50 LF Since Caldwell
County is a Mountain County and Zacks Fork Creek is a mountain stream, the April 2003 Stream
Mitigation Guidelines indicate a 30 LF Buffer is applicable to this project The Guidelines
further state that a reduction to buffer width will be considered based on issues related to
construction constraints, such as the sewer maintenance corridor and greenway easement As a
result, we believe we have met the intent of the C ontract and Technical Proposal
Thank you for the opportunity to provide stream restoration services to EEP and your
consideration of our response to the August 6 Project Closeout Meeting Please do not hesitate to
contact me with any questions about this information
Sincerely
Stepl anie Dorris, PE
Spaulding & Norris, PA
Enclosures
cc, Kevin Markham - ESI
ZACKS FORK STREAM RESTORATION
Live Staking Inspection
August 8, 2012
(approximately 10 LF of Bank Slump)
Sta 41 +00 — Live Stake Area C
(approximately 70I.17 of Bank Failure)
(Looking at Bank Slump from Top of Bank)
Sta 44 +00 — Live Stake Area D
i kit, I
CALpW�L�, CotJ�J'c� � is
��ypb
!t s
• � i s S % j ' � � �,yr�. `
Y
.r
f t
�....._ . tiJew wtlx,.*4E.Jr M� *MIA (" LO
h" p:// gis. caldwellcountync. org , /proxvoutput /c\port_d541'18761 f4a47?8aO8e9fae 1 e 1 bO 161.... 8/13/2012
Printing: Layout Page Page 1 of 1
inch = 50 feet
'this coup is prepared for the inventury of read propcny found within this jurisdiction, and is cumpiled from recorded deeds, plats, and other public records tmd data. Us
aforementioned public primary info n ution sources should be consulted for veiifimion of the information contained on this map. Caldwell County and its mapping an
for the information contained on this map or in this website. This map and information arc NOT of land sunny quality and= NOT suitable for such use.
i MVtj Wan " 1*900'"W (tXW f i%r0MF*X = 145 Lt- t)
http: /Igis.caldwelicountync.org /maps /layout.aspx 8 /15/2012
l►�l,i�f,
0
Y°
ay Of Lwg,
i
1—d
A9 -8YBt Rant WW2
t ./C /a-BOf Lao v4-
�l R-k S&-l.—
-_ =i _ -
A ZACKS FORK STREAM — _ SPAULDIlYG &
N E� RESTORATION (AW03003A) SO& NOR= PA
61 9-g ma
W ° CONSERVATION EASEMENT MAP profito�r io �� -�vs
Page 4 of 5
SITE PROTECTIOWINSTRUMENT
The land required for the construction, management, and stewardship of this mitigation
project consists of the following parcels
Grantor
County
Site
Deed
Acreage
Protection
Book and
protected
Instrument
Page
Number
City of Lenoir
Caldwell
Conservation
DB1445
1343
easement
PG69
CE
LONG -TERM MANAGEMENT PLAN
Upon approval for close -out by the Interagency Review Team (IRT), the site will be
transferred to the DENR Stewardship Program, which will be responsible for periodic
inspection of the site to ensure that restrictions required in the conservation easement
are upheld
Mitigation Project Name Zack's Fork Creek
EEP IMS ID 432
River Basin CATAWBA
Cataloging Unit 03050101
Aoolied Credit Ratios. 1 : 1 1 5 1 25 1 51 1 1 3 1 2 ' 1 5 ' 1 1 ' 1 3 ' 1 ? 1 5 1 1 1 3 1 9 1 5 1 1 1 4 1 n s i r 1 1 1
e c
2
Z
c
2
c
E.
Z
O
z
o�
o
it
m
E
O
z
O O
L L 2
d
O
2
Beginning Balance (feet and acres)
3,900.00
NCDOT Pre -EEP Debits feet and acres):
EEP Debits (feet and acres):
DWQ Permits
USACE Action IDs
Impact Project Name
2001 -1231
2001 -31321
NCDOT TIP R- 2248BB/
C/D - North Charlotte
Outer Loop
3,900.00
Remaining Balance (feet and acres)
0.00