Loading...
HomeMy WebLinkAbout20121004 Ver 1_CAMA Application_20121101I AW 2 ®121 47 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Braxton C. Davis Governor Director October 30, 2012 MEMORANDUM: TO: Karen Higgins 401 Oversight Division of Water Quality- Surface Water Protection Dee Freeman Secretary FROM: Doug Huggett, NC DENR -DCM Major Permits Coordinator 400 Commerce Ave., Morehead City, NC 28557 (Courier 11- 12 -09) SUBJECT: CAMA Major Permit Application Review Applicant: Gilbert Lepsig Project'Location: 1324 SW Harbour Watch Dr,. adjacent to the AIWW, in Calabash, Brunswick Co. Proposed Project: construction of a private docking facility with gazebo, floating dock, & boathouse Please indicate below your agency's position or viewpoint on the proposed project and return this form to Doug Hu_gQett at the address above by November 22, 2012. If you have any questions regarding the proposed project, contact Holley Snider at (910) 796 -7215, when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 127 Cardinal Drive Ext , Wilmington, NC 28405 Phone: 910 - 796 -7215 \ FAX: 910 - 395 -3964 Internet. www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer LO ? 1012 DENR - ifVWiz 61JALITY NorthCarofina NatundY DIVISIdN OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Gilbert Lepsig 2. LOCATION OF PROJECT SITE: 1324 SW Harbor Watch Drive, in the Ocean Harbor Estates Subdivision, adjacent to the Atlantic Intracoastal Waterway (AIWW), in Calabash, Brunswick County. Photo Index - 2006: 2 -6208 E,F,G -21 2000: 2 -14 R,S -5 1995: 2 -14 QR,S -17 State Plane Coordinates - X: 650846.084 Y: 13552.981 Lat:33 °52'16.79092 "N Long: 78 °33'15.45940 "W 3. INVESTIGATION TYPE: CAMA ROVER FILE # - P091213A ' 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 02/21/12, 04/18/12 Was Applicant Present - Yes Yes 5. PROCESSING PROCEDURE: Application Received - 10 /24 /12(Complete) Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Brunswick County Land Classification from LUP - Conservation (B) AEC(s) Involved: CW, PT, EW (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - None Planned - N/A (F) Type of Structures: Existing - Single- family residence under construction and retaining wall Planned - Private pier with gazebo, floating dock, boatiift and boathouse (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHFR (A) Vegetated Wetlands (Mixed coastal & 2,730 -sq. ft. 404 -type) (Shaded) (B) Non - Vegetated Wetlands 1,460 -sq. ft. (Open water) (Incorporated) (C) Other (High ground) (D) Total Area Disturbed: 4,190 sq. ft. ( 0.09 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA Open: Yes 8. PROJECT SUMMARY: The applicant proposes to construct a private pier with gazebo, floating dock and boat house with lift. Gilbert Lepsig Page 2 9. PROJECT DESCRIPTION: The project site is located at 1324 Harbour Watch SW, in the Ocean Harbor Estates Subdivision, adjacent to the Atlantic Intracoastal Waterway (AIWW), in Calabash, Brunswick County. To locate the property from US 17 S near Shallotte, travel south to NC Highway 904 turn left and travel approximately 2.2 miles to NC Highway 179/Old Georgetown Road SW, turn right and travel approximately 3.8 miles to Beach Drive SW. Turn left onto Beach Drive SW and travel approximately 1.6 miles to Ocean Harbor Golf Club Road SW. Turn right onto Ocean Harbor Golf Club Road SW and travel approximately 0.8 miles. Take the second left onto Harbor Gate North Drive SW and make an immediate left onto Harbor Watch SW. The property is located within a gated subdivision; the applicant's agent can be contacted for access to the gate. The property will be located on the left hand side of the road. The property consists of a 0.64 acre lot, with an approximate shoreline length of 101 feet. The highground portion of the property ranges from approximately 4 feet to 25 feet above mean high water (MHW) and is primarily vegetated with native trees, shrubs and grasses. The high ground has been cleared for the construction of a single family residence with pool and retaining wall, this development has been authorized by CAMA Minor Permit Calabash # 2012 -01. The authorized retaining wall has been constructed landward of the wetlands and the residence construction is underway. The high ground of the property transitions to an area of mixed coastal and 404 -type wetlands, which ranges from approximately 15 feet to 50 feet in width to the Normal High Water (NHW) boundary. Wetland vegetation consists of: Cattails (Typha sp.), Spike Grass (Distichlis spicata), Sea Lavender (Limonium spp.), Sea Oxeye (Borrichia frutescens), Groundsel -bush (Bacchorus halimifolia) and Wax Myrtle (Myrica cerfera). The property then transitions, from the NHW boundary water ward, to an area of low marsh consisting of Smooth Cord Grass (Spartina alterniflora). The Spartina extends approximately 400 feet to edge of vegetation and the Mean Low Water (MLW) contour is located approximately 100 feet water ward of the edge of vegetation (see drawing 1 of 2). The Town of Calabash Land Use Plan classifies the upland areas of the project site as undeveloped. The waters of the AIWW are classified SA by the Division of Water Quality. The project area is designated as a Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries and is OPEN to the harvest of shellfish. 10. PROPOSED PROJECT: The applicant proposes to construct a private pier with a gazebo, floating dock and boat house with lift. As proposed, the access pier would measure approximately575 feet in length, of which 535 feet would extend beyond the NHW boundary. The proposed access pier would measure 6 feet in width and would extend to the south from the retaining wall towards the AIWW. The access pier would then begin to span the wetlands, consisting primarily of Smooth Cord Grass and would extend water ward approximately 40 feet to the NHW boundary. The proposed 6 feet wide pier would then extend approximately 415 feet to the water ward edge of vegetation. The proposed access pier would continue approximately 120 feet over open water toward the AIWW channel approximately 120 feet in length. The pier would then terminate at a covered L -head platform measuring approximately 16 feet in width by 16 feet in length, as measured from the roof drip line. The proposed gazebo would be connected by an access ramp to a proposed 14 feet wide by 14 feet long floating dock that would extend to the northeast and would be oriented parallel to the AIWW channel. A boatlift, measuring Gilbert Lepsig Page 3 approximately 12 feet in' length by 12 feet in width, would be installed along the southwest side of the docking facility. As proposed the boatlift would be covered by a 12 feet wide by 24 feet long boathouse, as measured from the drip line dimensions. The proposed boathouse would be oriented perpendicular to the channel. The applicant states that the existing water depths in the location of the proposed floating dock and boatlift range from approximately -1.25 feet to -0.05 feet at Normal Low Water (see drawing 1 of 2). The applicant has stated that the facility would be constructed with timber stops approximately 2 feet above the bottom substrate to prevent disturbances to the shallow bottom habitat (see drawing 2 of 2). As proposed, the structure would provide docking space for two (2) vessels; one lift slip and one slip on the outboard edge of the proposed floating dock. The applicant has stated that handrails would be constructed on the east and north sides of the floating dock that would prevent vessels from mooring on the landward side and east side of the floating dock. The applicant states the width of water body in this location of the AIWW is approximately 542 feet. As proposed, the docking facility would extend approximately 535 feet water ward of Mean High Water and approximately 135 feet water ward of the edge of marsh. As proposed, the docking facility would be aligned to meet the quarter width of the water body distance and as proposed, would extend to within 8 feet of the 80 foot AIWW setback line. 11. ANTICIPATED IMPACTS The proposed pier system construction would incorporate approximately 1,460 sq. ft. of Estuarine Waters and Pubic Trust Area and would shade approximately 2,730 sq. ft. of Coastal Wetlands, consisting primarily of Smooth Cord Grass. The proposed access pier would result in the disturbance of approximately 240 feet of high marsh. Minor increases in turbidity should be expected during construction. The proposed docking facility would extend a total distance of approximately 535 feet into the water body as measured from the mean high water boundary of which approximately 135 feet would extend into open water within a water body which measures approximately 542 feet in width. This distance would conform to the 1/4 width rule. The structure, as proposed, would not encroach into either of the adjacent 15' riparian corridor setbacks or the 80 foot federal channel setback. Submitted by: Holley Snider Date: 10/25/2012 Office: Wilmington CAMA MAJOR NARRATIVE PRIVATE PIER AND DOCKING FACILITIES Gilbert and Tina Lepsig 1324 Harbour Watch Drive Ocean Harbour Estate Lot #4 Sunset Beach, NC 28467 412- 916 -4800 PROJECT: This application is for the proposed construction of a 6' wide 575' long pier leading to a 14'x14' covered fixed dock. Adjacent to the fixed dock will be a14'x16' floating dock on one side and a 12'x24' boat house with a 10,0001b boat lift on the other. The pier will begin at a newly constructed retaining wall and extend 575' @ 9' elevation to the fixed dock. All proposed construction will remain within the riparian corridors and will not encroach on the USACE right of way or the quarter width of the water body, [ ICW ). CONSTRUCTION MEATHODS: The proposed pier and dock structures will be constructed according to the prepared drawings by Kenneth H. Lacy of Cape Carteret, NC, 252 - 393 -2747 and consistent with the building codes of the Town of Calabash and Brunswick Co. Pier and dock pylons will be of marine grade 8" diameter an driven with a hydraulic hammer to a depth of 8' or refusal. All lumber will be 2" thick marine grade, all fasteners will be hot dipped galvanized or stainless steel. Fixed dock and pier will be constructed to carry a live load of 100lbs PSF. The floating dock will be of typical construction and carry a standard live load of 40lbs PSF and will be secured with 4 pylons 10" in diameter. The boat lift will be installed as per manufactures instructions. A 16' manufactured aluminum walk way will be installed as per directions leading from the fixed dock to the floating dock. All construction will be done by NC Boat Yard LLC, Jeffery N. Simmons, 910 - 842 -8888 and with an estimated time of completion of 60 days,,; n I 2 This letter is being sent to you as notification that a CAMA permit has been applied for the construction of a 575' pier leading to docking facilities along the ICW adjacent to your property. Mr. Gibby Lepsig and his wife Tina are in the process of building a new home in Ocean Harbour and have applied for this permit. The process for obtaining this permit requires notification of all adjacent property owners of this permit request and to include a copy of the completed application. Upon receiving this letter of notification you will have 10 days to contact the Division of Coastal Management should you have any objections. We are not requesting for you to waive any setbacks at this time, all proposed construction will be within the established riparian setbacks. If you have no objections to this permit you may keep this notification for your records and you will not need to return the enclosed form. Thank You Jeff Simmons NC Boat Yard LLC I R E "D?EiV i DO Nd "Al 11 NOW APPLICATION for Maier Development Permit (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Gilbert MI D. Last Name Lepsig Applicant 2: First Name Tina MI S Last Name Lepsig If additional applicants, please attach an additional page(s) with names listed. Mailing Address 408 170' Street PO Box City Sunset Beach State N.C. ZIP 28468 Country USA Phone No. 412 - 916 -4800 ext. FAX No. - _ Street Address (if different from above) City State ZIP Email gdlepsig @gmail.com 2. Agent/Contractor Information Business Name N.C. Boat Yard Llc Agent/ Contractor 1: First Name MI Last Name Norman J. Simmons Agent/ Contractor 2: First Name MI Last Name Jeffery N. Simmons Mailing Address PO Box City State N.C. Boat Yard 7 Shallotte N.C. ZIP Phone No. 1 Phone No. 2 28459 910 -279 - 3635 ext. 910 - 540 - 8947 ext. FAX No. Contractor # Street Address (if d/fferent from above) City State ZIP Email simmonsiandscape @yahoo.com <Fonn continues on back> °"'! �a:�; �!''�r`,1, !SIC SEP ,12° v 'AM Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Brunswick 1324 Harbour Watch d Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip Ocean Harbour Calabash N.C. 28467- Phone No. --I— Lot No.(s) (if many, attach addihonal page with list) 412 - 916 -4800 ext. 4, , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Lumber ICW c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown ICW e. Is proposed work within city limits or planning jurisdiction? f If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Calabash, NC 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 101 Approx. 28,000 c. Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (if many lot sizes, please attach additional page with a list) 15, ®NHW or ❑NWL e. Vegetation on tract Perennial grasses, warn myrtle, yaupon, sable minor, 404 and coastal wetlands f. Man -made features and uses now on tract Retaining wall along shoreline side of property and a single family home under construction. g. Identify and describe the existing land uses adiace nt to the proposed project site. Single family homes h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Residential (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> SEI ", 11J €? Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes ❑No (ii) Are there coastal wetlands on the site? ®Yes []No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? Was []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Future septic system o. Describe existing drinking water supply source. Municipal, Brunswick County p. Describe existing storm water management or treatment systems. Infiltration trenches and permeable pavement, all part of an engineered system 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑PubliGGovemment ®Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Private riparian access and docking facilities on the ICW, to include a 575' access pier leading to a 14'x14' fixed dock with a 16'x16' roof, on one side of the fixed dock a 14'x14' floating dock is proposed, accessed by a 4'x16' aluminum ramp, on the other side a 12'x24' boat house with a 10,OOOIb lift is proposed. The floating dock will have handrails on the east and north side to prevent dockage on those sides. The floating dock and the boatlift will have stops to prevent substrate disturbance. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Pier and docks will be constructed as per engineered drawings and according to the building codes of the Town of Calabash. A hydraulic hammer mounted on a steel barge at all times will be used to drive pylons. d. List all development activities you propose. Private pier and docking facilities e. Are the proposed activities maintenance of an existing project, new work, or both? New f. What is the approximate total disturbed land area resulting from the proposed project? N/A ❑Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use oft h. Describe location and type of existing and proposed discharges to waters of the state. None Proposed i. Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ❑NA j. Is there any mitigation proposed? []Yes ®No ❑NA If yes, attach a mitigation proposal. a i—CEIVED 4 !i�rty! Y °1ST ;i�,il': "t��l.lIV9 3V1� <Form continues on back> g I- P 4 U '10 62 Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additionallnformation In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, dearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Ralph Lerch Phone No. 828 - 264 -0894 Address 926 Appalation Drive, Boone N.C. 28607 Name Gerald Reynolds Phone No. 973 - 243 -2870 Address 11 Fredericks St. West Orange, NJ 07052 -6614 Name Phone No. Address g A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pemtittee, and issuing dates. CAMA Minor Permit #2012 -01, Town of Calabash Wastewater permit#2006067944, Brunswick Co. Storm Water Permit #SW8931204 h. Signed consultant or agent authorization forn, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of myknpwledge. �.. Date 8/20/2012 Print Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ;, r ®DCM MP-4 Structures Information c - * 1 E2 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑PublictGovemment ®Private /Community c. (i) Dock(s) and /or pier(s) (ii) Number 1 access pier (iii) Length 575' (iv) Width 6' (v) Floating ❑Yes ®No e. (i) Are Platforms included? ®Yes []No If yes: (ii) Number 2 one floating, one fixed with roof (iii) Length 14' floating 16' fixed with roof (iv) Width 14' floating 16' fixed with roof (v) Floating ®Yes ®No Note: Roofed areas are calculated from dripline dimensions. g (i) Number of slips proposed 2 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and /or channel ®Open water; no dredging required ❑Other, please describe: k. Typical boat length: 20' m. (1) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? [I This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? []Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes []No f. (i) Are Boatlifts included? ®Yes []No If yes: (ii) Number 1 (iii) Length .a!!r' �2 (iv) Width 12' h. Check all the types of services to be provided. ❑ Full service, including travel lift and /or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips ") only, number of slips: 2 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open runabout 1. (i) Will the facility be open to the general public? Yes SNo CIii N, NC ' 'y, _ E- UP ..J ; . Forirn DCM MP -4 (Structures, Page 2 of 4) 2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number. ; Location. ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of " Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. L Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality. i. What will be the marina policy on overnight and live- aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina /docking facility proposed within a primary or secondary nursery area? 5 LC i' ,+ r I I { 7 ❑Yes ❑No Form DCM MP -4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o Is the madna/docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed mannaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) [I This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PublictGovemment ®Private /Community (ii) Number 1 (iii) Length 24' (iv) Width 12' Note: Roofed areas are calculated from dnpline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ® This section not applicable a• (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑PublictGovemment ❑Private/Community c• Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present e. Arc of the swing 7. GENERAL b• Number d. Description of buoy (color, inscription, size, anchor, etc.) Xt, 'Vii_ MINi 'ETON, INC St=I� 2 C, Form DCM MP -4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines approx. 20' Note: For buoy or mooring piling, use am of swing including length of vessel. c. Width of water body approx. 567' e. (i) Will navigational aids be required as a result of the project? 0Yes []No XNA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. approx. 150' d. Water depth at waterward end of structure at NLW or NWL 18" 0 NLW 8. OTHER ❑This section not applicable a. Give complete description: Proposed construction of 575'x6' wide pier beginning at a new retaining wall on the waterward side of the property and leading to a 14'x14' fixed dock with a 16'x16' roof, on one side of the fixed dock will be a 14'x14' floating dock accessed by a 4'x16' aluminum walkway, the floating dock will have hand rails on north and east side to prevent dockage on those sides, on the other side will be a 12'x24' boat house. The floating dock and the boatlift will include 4x6 stops to prevent disturbance of substrate. Date 8/20/12 Pro' Name ) 1 Jb Applicant Name Gilbert D. Lepsig Applicant Signature SFP NG C LO ?' a (D o m -- E x o L fl. y c E 8 X 8 piles or 8" dia round piles 8' deep 2 X 10 collar /C each side of p walkway See detail sheet 2 Note: Platform and walkway loading —100 psf live load for golf cart usage. Refer to site plan drawing by Ace Marine for layout arrangement. N N N W O a 3 O 0 1324 Harbour Watch Sunset Beach, NC Pier Structural Framing ;a �l llal��Z File #2012 - 047 Sheet 1 of 4 1/411 = 1' Ken Lacy, P.E. PLLC P0344 307 Holly Lane Cape Carteret, NC 28584 252 - 393 -2747 (2) 2 X 8s @ outside edge ea side 1324 Harbour Watch Sunset Beach, NC Pier Structural Framing 2 X 8 Joists @ 16" o/c max at walkway 5/8" thru bolts w/ washers 2 X 10 collar each side of piles @ walkway 6 X-Bracing V Other Bent Note: Platform framinq similar U6 q s, H File #2012 - 047 Sheet 2 of 4 Not to Scale Ken Lacy, P.E. PLLC P0344 307 Holly Lane Cape Carteret, NC 28584 252-393-2747 I 0 .E E R 0 2 CL 0.0 < '0 to (D E 0 1324 Harbour Witch Sunset Beach, NC Pier Structural Framing io co x N .2, co x C14 5'-0" Platform Deck Framing 14'-0" 1 7--0" 2X12 6'-8" lilN 0 2 X Q collar/girder each side of piles @ platform This Span 8 X 8 piles or 8"dia round piles 8' deep 2 X 10 collar/girder each side of piles @ walkway Kx Note: Platform and walkway loading —100 psf live load for golf cart usage. Refer to site plan drawing by Ace Marine for layout arrangement. Piles up to gazebo roof framing — see sheet 11 W x Boat Lift 10 X 10 or 10" dia priles, # and layout to be confirmed with Lift Manufacturer Boat Lift by Others 10 14'-0" JE File # 2012 - 047 Sheet 3 of 4 3/13" = 1' Ken Lacy, P E. PLLC P0344 307 Holly Lane Cape Carteret, NC 28584 252-725-2405 16' manufactured aluminum walkway to 12' 0 4) X 20' floating platform with (4) 10" piles — typical construction for standard 0 40 psf loading O-------------- --------------- 0 .E E R 0 2 CL 0.0 < '0 to (D E 0 1324 Harbour Witch Sunset Beach, NC Pier Structural Framing io co x N .2, co x C14 5'-0" Platform Deck Framing 14'-0" 1 7--0" 2X12 6'-8" lilN 0 2 X Q collar/girder each side of piles @ platform This Span 8 X 8 piles or 8"dia round piles 8' deep 2 X 10 collar/girder each side of piles @ walkway Kx Note: Platform and walkway loading —100 psf live load for golf cart usage. Refer to site plan drawing by Ace Marine for layout arrangement. Piles up to gazebo roof framing — see sheet 11 W x Boat Lift 10 X 10 or 10" dia priles, # and layout to be confirmed with Lift Manufacturer Boat Lift by Others 10 14'-0" JE File # 2012 - 047 Sheet 3 of 4 3/13" = 1' Ken Lacy, P E. PLLC P0344 307 Holly Lane Cape Carteret, NC 28584 252-725-2405 Overhang 1' -0" 1324 Harbour Watch Sunset Beach, NC Pier Structural Framing Gazebo Roof Framing Gazebo Hip Roof Framing: 1. Girders (2) 2 X 12s attached to notched piles with PS418 Straps w/ (4) 5/8" thru bolts. 2. Hip Ridge Beams - 2 X 12s. Roof pitch 6/12. 3. Rafters - 2 X 6 @ 16" o /c. 4. Provide Simpson MTS12 at each end of each rafter. 5. Provide (2) MTS12 straps between each hip and girtder /post. ir 0 File # 2012 - 047 Sheet 4 of 4 1/4" = 1' Ken Lacy, P.E. PLLC P0344 307 Holly Lane Cape Carteret, NC 28584 252 - 725 -2405 V i