Loading...
HomeMy WebLinkAbout20180760 Ver 2_Pre-Filing Meeting Information_20210413DWR Pre -Filing Meeting Request Form NORTH CAROLINA £nvircnine h f Quoliry ID#* Regional Office * Reviewer List* 20202022 Version * 1 Wilmington Regional Office - (910) 796-7215 Joanne Steenhuis Pre -Filing Meeting Request submitted 12/29/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Troy Beasley tbeasley@withersravenel.com ILM Ditch/Drainage Runoff Mitigation New Hanover County Airport Authority New Hanover Street Address 1470 Airport Blvd Address Line 2 Suite 112 City State / Bovine/ legion Wilmington North Carolina Fbstal / Zip Code Country 28405 USA Is this a transportation project?* Yes ( No Type(s) of approval sought from the DWR: 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I Individual Permit 1— I Shoreline Stabilization Does this project have an existing project ID#? * Yes No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The purpose of the proposed project is to meet FAA requirements by mitigating public safety hazards associated with aircraft travel by preventing human and wildlife access within the airfield at the project location to improve aircraft safety. The proposed project will address excessive erosion within the stream feature (Stream 1) resulting from extraordinary rainfall and flooding from Hurricane Florence which aestaauizea tne cnannei. Stream ] is the outlet for tne stormwater drainage system for approximately 37-acres within the airport. The erosion within the channel continues to get worse with each heavy rainfall event and has eroded out a large area underneath the perimeter security fence. The erosion continues to widen the channel at the perimeter security fence, resulting in the airport maintenance regularly having to block the new holes under the fence with metal rods. The metal rods then catch debris, which causes the stream to erode around the metal posts, creating a constant maintenance issue. The frequent undermining of the perimeter security fence poses a significant security risk, as the erosion creates access points into the airfield for both humans and wildlife at the Runway 6 approach. The erosion and sedimentation have also created conditions within the channel that is attracting wildlife. These conditions create a safety issue as Stream 1 is within the Runway 6 Approach and approximately 800 If from the end of Runway 6, greatly increasing the likelihood of a wildlife strike with an aircraft. Additionally, the head cut from the erosion has progressed approximately 300 If upstream from the perimeter security fence to the perimeter road culvert in approximately 18-months. If not addressed, the erosion will undercut the perimeter road culvert and continue upstream, threatening the integrity of Runway 6. Since the initial damage to the stream channel and ensuing erosion resulted from flooding from Hurricane Florence, the proposed project is being funded by FEMA. FEMA prepared a Record of Environmental Consideration (REC) in accordance with NEPA, which determined that the proposed project met conditions for authorization under a CATEX category *N9 — Federal Assistance for Flood Hazard Reduction Actions. The FEMA REC has been provided as an attachment. The proposed project proposes to permanently impact Stream 1, of which approximate 72 If is tidal and 244 If is non -tidal. The project proposes to grade the slopes of the channel to a 3:1 slope and line the entire channel with an articulating concrete block geogrid system which will permanently stabilize the channel and prevent future erosion and undermining of the perimeter security fence, permanently eliminating the reoccurring safety issue at this location. The articulating concrete block liner is pervious, allowing water to infiltrate through it, as well as vegetation to grow through it. The stream channel will be lined from the existing culvert in the perimeter road to an existing culvert approximately 25 If downstream of the existing security fence. The articulating concrete block system has been used to stabilize other onsite stormwater swales at ILM and it has been very affective (see Photo Documentation). The perimeter security fence will be relocated over the existing culvert to the west to avoid potential future issues with erosion compromising the perimeter security fence. A concrete headwall will be constructed on the upstream end of the existing culvert to provide permanent stabilization of the culvert and prevent future erosion. The completion of the project will increase aircraft and public safety as part of the normal daily operation and activities associated with the operation of the airport. Please note that the proposed project will not create any additional impervious area and will not change the existing volume of stormwater drainage discharging into downstream portions of Stream 1. The project will require a CAMA major development permit as well as a 401 WQC. Please give a couple of dates you are available for a meeting. 1 / 11 /2021 1/12/2021 1/13/2021 1/14/2021 1/15/2021 Please attach the documentation you would like to have the meeting about. CAMA Exhibits.pdf pdf only 3.33MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/29/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No