Loading...
HomeMy WebLinkAboutNCG140496_Technical Assistance_20210210Compliance Inspection Report Permit: NCG140496 Effective: Expiration: Owner : R C Construction Co Inc SOC: Effective: Expiration: Facility: Runway & Parallel Taxiway Rehabilitation - Bat( County: Cumberland Hurst Dr Region: Fayetteville Pope Army Airfield NC 28308 Contact Person: Edward Murchison Title: Phone: 662-453-2424 Directions to Facility: Hurst Drive to construction access at south end of runway. Secondary access via Lewis Street construction access road. Tertiary access via Pratt Road construction access road System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/10/2021 Entry Time 11:25AM Exit Time: 12:28PM Primary Inspector: Penny Markle Phone: 910-433-3300 Secondary Inspector(s): Reason for Inspection: Other Inspection Type: Technical Assistance Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140496 Owner - Facility: R C Construction Co Inc Inspection Date: 02/10/2021 Inspection Type : Technical Assistance Reason for Visit: Other Inspection Summary: An inspection for compliance with an approved erosion and sedimentation control plan for construction of this new facility was conducted on February 10, 2021. At the time of inspection, the facility was under construction with sedimentation control measures installed. In reviewing the NOI for NCG140000 coverage that was received by the Central Office on March 1, 2021, along with the approved erosion control plan, the discharge outfall coordinates listed on the NOI appeared to match with the site's sediment basins/control measures. This information, along with additional comments regarding an NOV that was previously issued on January 8, 2021 to the applicant for violations of the NCG140000 permit for their existing batch plant also located at Fort Bragg/Pope Army Airfield, was e-mailed from Mike Lawyer with the Fayetteville Regional Office to Mike Meloy with the Central Office on March 12, 2021. Additional e-mail communication occurred between Mike Lawyer and Mike Meloy on March 31, 2021 regarding the receiving stream classification possibly being a Water Supply Watershed Critical Area, which would require input from the Public Water Supply Section of DWR prior to issuance of coverage under the NCG140000 permit. Dependent upon review and comment by staff with the Public Water Supply Section, DEMLR-FRO staff have no objections to issuance of coverage under the NCG140000 General Permit. Page 2 of 3 Permit: NCG140496 Owner - Facility: R C Construction Co Inc Inspection Date: 02/10/2021 Inspection Type : Technical Assistance Reason for Visit: Other Page 3 of 3