Loading...
HomeMy WebLinkAboutNCC212170_ESC Approval Submitted_20210413�q ROY COOPER h' Governor MICHAEL S. REGAN _ :r d Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality January 22, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Frontier Natural Gas Co. Attention: Fred Steele, President/General Manager 110 PGW Dr. Elkin, NC 28621 RE: Project Name: Mooney Poultry Project Acres Approved: 10.30 Project ID: SURRY-2021-008 County: Surry City: Ararat Address: NC-268 River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Frontier Natural Gas Co. Date Received by LQS: January 19, 2021 Plan Type: New -Express Dear Mr. Steele: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. North Carolina Department of Environmental Quality I Division of Energy. Mttnerai and Land Resources r 'Winston-Salem Regional Office 1450 Hanes Milt Road Suite 3001 Winston-Salem, North Carolina 27103 ~�� 336.776.9600 Letter of Approval with Modifications Frontier Natural Gas Co. January 22, 2021 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North .Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, V �< Z chary -Lentz, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet cc: Ted Gambill of Frontier Natural Gas Co. (via e-mail) WSRO file Letter of Approval with Modifications Frontier Natural Gas Co. January 22, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Mooney Poultry Project Project ID: SURRY-2021-008 County: Surry Modifications pursuant to applicable North Carolina General Statutes and/or Regulations• Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 413.0110] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] This ESC plan was approved based on information submitted via E-mail to Zachary Lentz, EI on January 21, 2021. For inspection purposes, two hard copies of the revised plans reflecting the E-mailed information must be delivered to this office by February 5, 2021 or prior to the beginning of construction, whichever date is earlier. Please reference Project Number SURRY-2021-008 in your cover memo. [15A NCAC 4B .0107(c)] Ref: G.S.113A-54:1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities