April 1, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Carolinas, LLC
Attention: David Dellario, GM CCP Project Management
526 South Church Street
Charlotte, North Carolina 28202
RE: Project Name: Marshall Phase 2 Industrial Landfill (Cells 5 & 6)
Acres Approved: 53.0
Project ID: CATAW-2021-013
County: Catawba, City: Sherrills Ford
Address: 8320 NC Hwy 150
River Basin: Catawba
Stream Classification: Other
Submitted By: Robert Boeing, PE, AECOM
Date Received by LQS: March 19, 2021
Plan Type: Revised
Dear Mr. Dellario:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The.
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee
will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
DE Q Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
NOWI r4. CLIIV �`
oe�,mixnt or �,rrllon,nt w=na 704.663.1699
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
April 1, 2021
Page 2 of 3
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, -which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
7
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
AECOM
Attn: Robert Boeing, PE
1600 Perimeter Park Dr., Suite 400
Morrisville, NC 27560
Letter of Approval with Modifications
Duke Energy Carolinas, LLC
April 1, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Marshall Phase 2 Industrial Landfill (Cells 5 & 6)
Project ID: CATAW-2021-013
County: Catawba
1. The embankment for the West Skimmer Sediment Basin shall have a minimum 5' top crest
width. Adequate diversion berms shall be provided to direct runoff into basin.
2. Stone outlets shall be installed in the silt fence for low-lying areas.
3. If the grass fails to adequately stabilize channels with Hydroturf Z, Type I liners, a revised
plan shall be submitted with an adequate channel liner.
(321
Cd �, o
® QGO
Cii Cd
UO
° Q)
°� ��
C) ® °
0
® -10
CAR :0
64
cl
cd
Cd
®ocn
ff b
a
® � � z
® � d �
®