Loading...
HomeMy WebLinkAboutSW4210301_STORMWATER_CALCS_2991.2_REV_ONLY_20210412 AEV PARKING EXPANSION J EFFERSON, NC H YDROLOGIC AND H YDRAULIC A NALYSIS R EPORT Prepared By: Prepared For: Project Site: BREC, P.A. Kenneth Osborne 150 Northwest Drive 1520 Meadowview Drive Jefferson, NC 28640 Wilkesboro, NC 28697 NCBELS Firm #C-3448 (336) 844-4088 Max@brec.biz 12 April 2021 Revised Pages 10,11,12 and Last Page of Post-Construction First Flush Max Prestwood III, PE Project Engineer BREC, P.A. AEV PARKING EXPANSION 1 2.7 3 ­£ &¨«³¤± $¤²¨¦­ The combined area of the sediment chamber and sand chamber is determined from the relationship of the max water depth observed during the water quality event, , and the adjusted water quality volume. The design value for was chosen as . When coupled with the adjusted water quality volume, , the resulting stage storage for the sand filter is summarized below. Table 12 - Sand Filter State-Storage 0.0 2,989.0 1,922.00 0 0 0 1.0 2,990.0 2,516.00 1,110 1,110 2,219 2.0 2,991.0 3,182.00 2,534 2,534 5,068 2.2 2,991.2 3,323.84 2,861 2,861 5,721 At , . 2.7ȁΐ #§ ¬¡¤±  ­£ &¨«³¤± 3¨¹¨­¦ The sediment chamber and filter chamber are equally sized. The sediment chamber has an additional depression to assist with maintenance and primary sediment deposition; however, this added volume is not considered in calculations to meet minimum design criteria requirements. Given the filter chamber area, the sand media area, , was selected as . This value maximizes the available filter chamber area and preserves an easily installable geometric shape for the sand media while preventing the sand media from being installed adjacent to the toe of slope grading. Discharge through the sand media Where, 2.7.2 5­£¤±£± ¨­ 3¨¹¨­¦ BREC, P.A. AEV PARKING EXPANSION 10 Drawdown time is calculated as: Discharge rate is calculated as: After applying a safety factor of 10, The diameter of a single pipe is calculated as: Where, Per Table 1 of Section A-5 of the NCDEQ Stormwater Design Manual, use (2) 6 inch pipes. 2.7.3 Anti-¥«® ³ ³¨®­ # «¢´« ³¨®­² The outlet structure is a precast concrete box with side and bottom wall thicknesses. Including concrete and reinforcing steel, the structure has an empty mass of . Assuming the total height of the box is exposed to buoyant forces, the volume of water displaced by the box is calculated from the outside dimensions. BREC, P.A. AEV PARKING EXPANSION 11 The buoyant force is defined from the hydraulic forces acting on the box. No additional mass needed mass of structure is greater than the buoyant force. ΒȁΏ 2¤²´«³² The first flush storm is routed through the sand filter and reaches a max storage depth of which does not exceed the design . The water quality volume is discharged over a period of Figure 1 - System Storage of First Flush BREC, P.A. AEV PARKING EXPANSION 12 Storage Node : SAND-FILTER (continued) Outflow Weirs SNElementWeirFlapCrestCrestLengthWeir TotalDischarge IDTypeGateElevationOffsetHeightCoefficient (ft)(ft)(ft)(ft) 1EM-SPILLWAYTrapezoidalNo2993.504.5010.001.003.33 Outflow Orifices SNElementOrificeOrificeFlapCircularRectangularRectangularOrificeOrifice IDTypeShapeGateOrificeOrificeOrificeInvertCoefficient DiameterHeightWidthElevation (in)(in)(in)(ft) 1PRIMARY-OUTLETSideRectangularNo18.0014.002991.200.63 2SECONDARY-OUTLETBottomRectangularNo36.0036.002993.000.63 Output Summary Results Peak Inflow (cfs) ......................................................................................3.55 Peak Lateral Inflow (cfs) ..........................................................................3.55 Peak Outflow (cfs) ...................................................................................0.08 Peak Exfiltration Flow Rate (cfm) ............................................................0.00 Max HGL Elevation Attained (ft) ..............................................................2990.90 Max HGL Depth Attained (ft) ...................................................................1.9 Average HGL Elevation Attained (ft) .......................................................2989.47 Average HGL Depth Attained (ft) ............................................................0.47 Time of Max HGL Occurrence (days hh:mm) .........................................0 05:42 Total Exfiltration Volume (1000-ft³) .........................................................0.000 Total Flooded Volume (ac-in) ..................................................................0 Total Time Flooded (min) ........................................................................0 Total Retention Time (sec) ......................................................................0.00