HomeMy WebLinkAbout20210549 Ver 1_Pre-Filing Meeting Request_20210313DWR Pre -Filing Meeting Request Form
ID#*
Regional Office*
Reviewer List*
20210549
Version *
1
Mooresville Regional Office - (704) 663-1699
Alan Johnson
Pre -Filing Meeting Request submitted 3/13/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Janice Estep
info@cbcstoneandrecycling.com
Leigh Shoreline
Cynthia Leigh
Mecklenburg
Street Address
16836 Fidler Ln.
Address Line 2
City State / Rovince / Region
Cornelius NC
Fbstal / Zip Code Country
28031 United States
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
r 401 Water Quality Certification - I— 401 Water Quality Certification -
Regular Express
I— Individual Permit I— Modification
fJ Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below and include location information. *
From dock to left property line, shape and slope approx. 200' of
shoreline, install matting and boulder rip rap. From dock to right
property line, push down existing stone, shape and slope approx.
118' of shoreline, install matting and install class "B" rip rap.
Please give a couple of dates you are available for a meeting.
3/15/2021
3/16/2021
3/17/2021
3/18/2021
3/19/2021
Please attach the documentation you would like to have the meeting about.
Leigh Shoreline.pdf
pdf only
1.65MB
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 3/13/2021