Loading...
HomeMy WebLinkAbout20210549 Ver 1_Pre-Filing Meeting Request_20210313DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210549 Version * 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 3/13/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Janice Estep info@cbcstoneandrecycling.com Leigh Shoreline Cynthia Leigh Mecklenburg Street Address 16836 Fidler Ln. Address Line 2 City State / Rovince / Region Cornelius NC Fbstal / Zip Code Country 28031 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: r 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification fJ Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information. * From dock to left property line, shape and slope approx. 200' of shoreline, install matting and boulder rip rap. From dock to right property line, push down existing stone, shape and slope approx. 118' of shoreline, install matting and install class "B" rip rap. Please give a couple of dates you are available for a meeting. 3/15/2021 3/16/2021 3/17/2021 3/18/2021 3/19/2021 Please attach the documentation you would like to have the meeting about. Leigh Shoreline.pdf pdf only 1.65MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 3/13/2021